If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-23392 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-81.85,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Milton Township | |
Operator Name: ECO PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: JOHNSON ANDREW C | |
License Status: Producing | |
License Date: 1982-09-01 | |
Spud Date: 1982-09-16 | |
Spud Drilling Contractor: PLATEAU DRLG | |
Final Drill Date: 1982-09-24 | |
Well Total Depth: 3425.00 ft | |
Configuration: Vertical | |
Latitude: 40.940000 | |
Longitude: -81.850000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-09-01 | Issued Date 9/1/82 Expired Date 3/1/83 Acres 0126920 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03425 Proposed Drill Depth 03425 |
Original Spud | 1982-09-16 | |
Completed | 1982-09-24 | |
Reached Total Depth | 1982-09-24 | |
CO | 1982-10-22 | 201 GREEN GAS CO GeoDate 9/1/82 |
Completion Report Received | 1982-11-10 | |
Construction Permit Expires | 1983-03-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3250 | 3300 | 12 |
3250 | 3300 | 12 | |
3250 | 3300 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1150 Bbl | 40000 | FRAC: 1150 BBL GELD H2O, 45M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | B J INC | 127.00 | 70.00 | 0 |
1985 | B-J OF OHIO INC | 1215.00 | 75.00 | 365 |
1988 | B-J OF OHIO INC | 1957.00 | 557.00 | 344 |
1989 | B-J OF OHIO INC | 2027.00 | 510.00 | 365 |
1990 | GREEN GAS CO | 2764.00 | 596.00 | 365 |
1991 | GREEN GAS CO | 2716.00 | 414.00 | 365 |
1992 | GREEN GAS CO | 1544.00 | 278.00 | 365 |
1993 | GREEN GAS CO | 1271.00 | 204.00 | 365 |
1994 | GREEN GAS CO | 1023.00 | 176.00 | 365 |
1995 | GREEN GAS CO | 1018.00 | 116.00 | 365 |
1996 | GREEN GAS CO | 954.00 | 183.00 | 365 |
1997 | GREEN GAS CO | 1479.00 | 179.00 | 365 |
1998 | GREEN GAS CO | 1313.00 | 139.00 | 365 |
1999 | GREEN GAS CO | 479.00 | 156.00 | 365 |
2000 | GREEN GAS CO | 1070.00 | 233.00 | 365 |
2001 | GREEN GAS CO | 619.00 | 209.00 | 365 |
2002 | GREEN GAS CO | 852.00 | 234.00 | 365 |
2003 | GREEN GAS CO | 116.00 | 80.00 | 365 |
2004 | GREEN GAS CO | 280.00 | 159.00 | 365 |
2005 | GREEN GAS CO | 1116.00 | 230.00 | 365 |
2006 | GREEN GAS CO | 761.00 | 153.00 | 365 |
2007 | GREEN GAS CO | 877.00 | 234.00 | 365 |
2008 | GREEN GAS CO | 318.00 | 72.00 | 365 |
2009 | GREEN GAS CO | 857.00 | 145.00 | 365 |
2010 | GREEN GAS CO | 688.00 | 141.00 | 365 |
2011 | GREEN GAS CO | 948.00 | 228.00 | 0 |
2012 | GREEN GAS CO | 851.00 | 151.00 | 366 |
2013 | GREEN GAS CO | 656.00 | 78.00 | 365 |
2014 | GREEN GAS CO | 275.00 | 70.00 | 365 |
2015 | GREEN GAS CO | 727.00 | 178.00 | 365 |
2016 | GREEN GAS CO | 830.00 | 224.00 | 365 |
2017 | GREEN GAS CO | 199.00 | 75.00 | 365 |
2018 | GREEN GAS CO | 188.00 | 72.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | B J INC | Brine | 130 | 0 |
1985 | B-J OF OHIO INC | Brine | 80 | 365 |
1988 | B-J OF OHIO INC | Brine | 0 | 344 |
1989 | B-J OF OHIO INC | Brine | 0 | 365 |
1990 | GREEN GAS CO | Brine | 85 | 365 |
1991 | GREEN GAS CO | Brine | 6 | 365 |
1992 | GREEN GAS CO | Brine | 22 | 365 |
1993 | GREEN GAS CO | Brine | 10 | 365 |
1994 | GREEN GAS CO | Brine | 26 | 365 |
1995 | GREEN GAS CO | Brine | 0 | 365 |
1996 | GREEN GAS CO | Brine | 0 | 365 |
1997 | GREEN GAS CO | Brine | 0 | 365 |
1998 | GREEN GAS CO | Brine | 333 | 365 |
1999 | GREEN GAS CO | Brine | 70 | 365 |
2000 | GREEN GAS CO | Brine | 40 | 365 |
2001 | GREEN GAS CO | Brine | 60 | 365 |
2002 | GREEN GAS CO | Brine | 0 | 365 |
2003 | GREEN GAS CO | Brine | 0 | 365 |
2004 | GREEN GAS CO | Brine | 0 | 365 |
2005 | GREEN GAS CO | Brine | 21 | 365 |
2006 | GREEN GAS CO | Brine | 0 | 365 |
2007 | GREEN GAS CO | Brine | 0 | 365 |
2008 | GREEN GAS CO | Brine | 0 | 365 |
2009 | GREEN GAS CO | Brine | 0 | 365 |
2010 | GREEN GAS CO | Brine | 52 | 365 |
2011 | GREEN GAS CO | Brine | 0 | |
2012 | GREEN GAS CO | Brine | 0 | 366 |
2013 | GREEN GAS CO | Brine | 226 | 365 |
2014 | GREEN GAS CO | Brine | 289 | 365 |
2015 | GREEN GAS CO | Brine | 291 | 365 |
2016 | GREEN GAS CO | Brine | 85 | 365 |
2017 | GREEN GAS CO | Brine | 33 | 365 |
2018 | GREEN GAS CO | Brine | 25 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1253140427 | 2012-10-22 0:00 | PW | No Violations | |
-1803308255 | 2016-10-31 0:00 | PW | No Violations | |
-2136082938 | 2017-6-12 0:00: | PW | No Violations | |
-411345293 | 2015-11-30 0:00 | PW | No Violations | |
-411354151 | 2018-7-2 0:00:0 | PW | No Violations | |
00000PL941 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0113550968 | 2015-09-04 | Production Wells | No Violations | This is a pump jack well with no apparent problems at time of inspection. |
0411345293 | 2015-11-30 | Production Wells | No Violations | Inspected production well on 11/30/2015. The tank battery consists of 4-100 bbl steel tanks, 2-vertical separators, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (4); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0411354151 | 2018-07-02 | Production Wells | No Violations | Inspected production well on 07/02/2018. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, 1-meter box, and 1-compressor, located within an earthen dike; 1-Aspire station is located nearby. The diked area is shared with the tank battery for the Johnson #2 and #6 wells (PN: 169-24275/24524). The tank battery is used by multiple wells (2); well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
113550968 | 2015-9-4 0:00:0 | PW | No Violations | 0.50 |
1253140427 | 2012-10-22 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
1692309228 | 2014-06-04 | Production Wells | No Violations | Pumping unit well with no apparent problems at this time. |
1803308255 | 2016-10-31 | Production Wells | No Violations | Inspected production well on 10/31/2016. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, and 1-compressor, located within an earthen dike; the diked area is shared with the production equipment for DA Waldrons Johnson #2 & #6 wells (PN: 169-24275/24524). The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1942602726 | 2013-06-07 | Production Wells | No Violations | This is a producing pump jack. No apparent problems at time of inspection. |
2136082938 | 2017-06-12 | Production Wells | No Violations | Inspected production well on 06/12/2017. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, 1-meter box, and 1-compressor, located within an earthen dike; the diked area is shared with the tank batteries for Pin Oaks Johnson #2 and #6 wells (PN: 169-24275/24524). The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
323593682 | 2020-5-21 0:00: | PW | No Violations | |
540507566 | 2020-6-17 0:00: | PW | No Violations | |
PL941 | PL | No Violations |
For data sources see[9]