If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-169-23994 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.88,"lon":-81.95,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Wayne | |
| Municipality: Wayne Township | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: EWING CW | |
| License Status: Producing | |
| License Date: 1996-04-04 | |
| Spud Date: 1996-06-22 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 1996-06-29 | |
| Well Total Depth: 5615.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.880000 | |
| Longitude: -81.950000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1984-11-26 | Issued Date 11/26/84 Expired Date 5/25/85 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| CO | 1985-06-14 | 169 SMAIL JAMES R GeoDate 6/14/85 |
| Oil and Gas | 1985-06-14 | Issued Date 6/14/85 Expired Date 6/14/86 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1986-06-20 | |
| CO | 1996-04-04 | 169 SMAIL JAMES R GeoDate 4/4/96 |
| Oil and Gas | 1996-04-04 | Issued Date 4/4/96 Expired Date 4/4/97 Acres 0040000 Tool Type RTF Proposed Formation TREMPEALEAU Proposed Depth 05615 Proposed Drill Depth 05615 |
| Completed | 1996-06-29 | |
| Reached Total Depth | 1996-06-29 | |
| CO | 1996-08-07 | 169 SMAIL JAMES R GeoDate 11/26/84 |
| Completion Report Received | 1996-12-13 | |
| Construction Permit Expires | 1997-04-04 | |
| Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2019-04-29 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 5580 | 0 | |
| 5580 | 0 | ||
| 5580 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 0 | 1000 Gal | 0 | TREATED W/1000 GAL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1996 | JAMES R SMAIL INC | 634.00 | 2362.00 | 90 |
| 1997 | JAMES R SMAIL INC | 4904.00 | 7504.00 | 365 |
| 1998 | JAMES R SMAIL INC | 4900.00 | 5158.00 | 365 |
| 1999 | JAMES R SMAIL INC | 6362.00 | 3328.00 | 365 |
| 2000 | JAMES R SMAIL INC | 5533.00 | 2087.00 | 365 |
| 2001 | JAMES R SMAIL INC | 4130.00 | 1453.00 | 365 |
| 2002 | JAMES R SMAIL INC | 3344.00 | 984.00 | 365 |
| 2003 | JAMES R SMAIL INC | 3113.00 | 930.00 | 365 |
| 2004 | JAMES R SMAIL INC | 1982.00 | 687.00 | 365 |
| 2005 | JAMES R SMAIL INC | 1525.00 | 664.00 | 365 |
| 2006 | JAMES R SMAIL INC | 1747.00 | 332.00 | 365 |
| 2007 | JAMES R SMAIL INC | 741.00 | 334.00 | 365 |
| 2008 | JAMES R SMAIL INC | 625.00 | 321.00 | 365 |
| 2009 | JAMES R SMAIL INC | 558.00 | 164.00 | 365 |
| 2010 | JAMES R SMAIL INC | 518.00 | 343.00 | 365 |
| 2011 | JAMES R SMAIL INC | 855.00 | 331.00 | 365 |
| 2012 | JAMES R SMAIL INC | 637.00 | 662.00 | 366 |
| 2013 | JAMES R SMAIL INC | 492.00 | 488.00 | 365 |
| 2014 | JAMES R SMAIL INC | 363.00 | 473.00 | 365 |
| 2015 | JAMES R SMAIL INC | 289.00 | 453.00 | 365 |
| 2016 | JAMES R SMAIL INC | 321.00 | 469.00 | 365 |
| 2017 | JAMES R SMAIL INC | 318.00 | 428.00 | 365 |
| 2018 | JAMES R SMAIL INC | 258.00 | 331.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1996 | JAMES R SMAIL INC | Brine | 560 | 90 |
| 1997 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 1998 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 1999 | JAMES R SMAIL INC | Brine | 365 | |
| 2000 | JAMES R SMAIL INC | Brine | 365 | |
| 2001 | JAMES R SMAIL INC | Brine | 365 | |
| 2002 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2003 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2004 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2005 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2006 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2008 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2009 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2010 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2011 | JAMES R SMAIL INC | Brine | 15 | 365 |
| 2012 | JAMES R SMAIL INC | Brine | 0 | 366 |
| 2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2015 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2016 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2017 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2018 | JAMES R SMAIL INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1345062641 | 2020-6-3 0:00:0 | PW | No Violations | |
| -1944123530 | 2015-10-29 0:00 | PW | No Violations | |
| -854877091 | 2020-6-3 0:00:0 | PW | No Violations | |
| 0000002460 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 9/23/96 INSPECTOR MARK MORELAND DATE 09/2319/96 DATA FROM OLD VAX INFO | |
| 1084974132 | 2018-03-13 | Production Wells | No Violations | Inspected production well on 03/13/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-1,100 gal plastic tank, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
| 1418825890 | 2014-12-17 | Production Wells | No Violations | This pumping unit well was in operation at time of inspection. There were no apparent problems at that time. |
| 1904690666 | 2017-05-15 | Production Wells | No Violations | Inspected production well on 05/15/2017. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-1,100 gal plastic tank, and 1-vertical separator, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
| 1944123530 | 2015-10-29 | Production Wells | No Violations | Inspected production well on 10/29/2015. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-1,100 gal plastic tank, and 1-vertical separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
| 2140267762 | 2013-04-19 | Production Wells | No Violations | This is a producing well with no apparent problems at this time. |
| 2460 | PL | No Violations |
For data sources see[9]