X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-24604

Well Details

Well ID: 34-169-24604
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Milton Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: MAIBACH
License Status: Producing
License Date: 1988-04-12
Spud Date: 1988-04-26
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1988-04-29
Well Total Depth: 3385.00 ft
Configuration: Vertical
Latitude: 40.950000
Longitude: -81.850000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1988-04-12 Issued Date 4/12/88 Expired Date 4/12/89 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03385 Proposed Drill Depth 03385
Original Spud 1988-04-26
Completed 1988-04-29
Reached Total Depth 1988-04-29
CO 1988-06-03 1453 GREEN ENERGY INC GeoDate 4/12/88
Completion Report Received 1988-06-21
Construction Permit Expires 1989-04-12
Change of Owner 2003-03-04 Operator changed from 1453, GREEN ENERGY INC to 337, HARLEY DRILLING & PRODUCI
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3209 3292 2
3209 3292 2
3209 3292 2

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 300 Gal 0 FRAC: H2O,SAND
H2O 0 62500 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 GREEN ENERGY INC 2552.00 875.00 365
1989 GREEN ENERGY INC 4231.00 1758.00 365
1990 GREEN ENERGY INC 3466.00 1064.00 26
1991 GREEN ENERGY INC 3107.00 717.00 365
1992 GREEN ENERGY INC 2445.00 520.00 365
1993 GREEN ENERGY INC 2614.00 404.00 365
1994 GREEN ENERGY INC 1820.00 229.00 365
1995 GREEN ENERGY INC 1441.00 240.00 365
1996 GREEN ENERGY INC 1538.00 200.00 365
1997 GREEN ENERGY INC 1236.00 180.00 365
1998 GREEN ENERGY INC 1041.00 111.00 365
1999 GREEN ENERGY INC 888.00 133.00 365
2000 GREEN ENERGY INC 766.00 79.00 365
2001 GREEN ENERGY INC 569.00 96.00 365
2002 GREEN ENERGY INC 622.00 72.00 365
2003 HARLEY DRILLING & PRODUCING LT 846.00 82.00 365
2004 HARLEY DRILLING & PRODUCING LT 816.00 78.00 365
2005 HARLEY DRILLING & PRODUCING LT 221.00 82.00 365
2006 HARLEY DRILLING & PRODUCING LT 196.00 85.00 365
2007 HARLEY DRILLING & PRODUCING LT 472.00 79.00 365
2008 HARLEY DRILLING & PRODUCING LT 742.00 84.00 365
2009 HARLEY DRILLING & PRODUCING LT 243.00 82.00 365
2010 HARLEY DRILLING & PRODUCING LT 387.00 78.00 365
2011 HARLEY DRILLING & PRODUCING LT 369.00 156.00 365
2012 HARLEY DRILLING & PRODUCING LT 289.00 0.00 366
2013 HARLEY DRILLING & PRODUCING LT 7.00 0.00 365
2014 HARLEY DRILLING & PRODUCING LT 0.00 155.00 365
2015 HARLEY DRILLING & PRODUCING LT 99.00 66.00 365
2016 HARLEY DRILLING & PRODUCING LT 343.00 30.00 365
2017 HARLEY DRILLING & PRODUCING LT 324.00 100.00 365
2018 HARLEY DRILLING & PRODUCING LT 94.00 66.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 GREEN ENERGY INC Brine 803 365
1989 GREEN ENERGY INC Brine 105 365
1990 GREEN ENERGY INC Brine 0 26
1991 GREEN ENERGY INC Brine 22 365
1992 GREEN ENERGY INC Brine 0 365
1993 GREEN ENERGY INC Brine 15 365
1994 GREEN ENERGY INC Brine 10 365
1995 GREEN ENERGY INC Brine 0 365
1996 GREEN ENERGY INC Brine 12 365
1997 GREEN ENERGY INC Brine 0 365
1998 GREEN ENERGY INC Brine 0 365
1999 GREEN ENERGY INC Brine 25 365
2000 GREEN ENERGY INC Brine 0 365
2001 GREEN ENERGY INC Brine 0 365
2002 GREEN ENERGY INC Brine 18 365
2003 HARLEY DRILLING & PRODUCING LT Brine 0 365
2004 HARLEY DRILLING & PRODUCING LT Brine 0 365
2005 HARLEY DRILLING & PRODUCING LT Brine 0 365
2006 HARLEY DRILLING & PRODUCING LT Brine 0 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 30 365
2009 HARLEY DRILLING & PRODUCING LT Brine 15 365
2010 HARLEY DRILLING & PRODUCING LT Brine 0 365
2011 HARLEY DRILLING & PRODUCING LT Brine 57 365
2012 HARLEY DRILLING & PRODUCING LT Brine 0 366
2013 HARLEY DRILLING & PRODUCING LT Brine 0 365
2014 HARLEY DRILLING & PRODUCING LT Brine 0 365
2015 HARLEY DRILLING & PRODUCING LT Brine 0 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 0 365
2018 HARLEY DRILLING & PRODUCING LT Brine 5 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1731826248 2014-6-4 0:00:0 PW No Violations 0.50
-1761491083 2016-3-3 0:00:0 PW No Violations
-1967703313 2017-3-21 0:00: PW No Violations
-828874569 2013-6-7 0:00:0 PW No Violations 0.50
00000PL176 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0659175465 2016-10-31 Production Wells No Violations Inspected production well on 10/31/2016. The tank battery consists of 3-100 bbl steel tanks, 1-vertical separator, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with a natural gas-powered motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0828874569 2013-06-07 Production Wells No Violations This is a pump jack well. No apparent problems at this time.
1731826248 2014-06-04 Production Wells No Violations This pumping unit well has no apparent problems at this time.
1761491083 2016-03-03 Production Wells No Violations Inspected production well on 03/03/2016. The tank battery consists of 3-100 bbl steel tanks, 1-vertical separator, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1967703313 2017-03-21 Production Wells No Violations Inspected production well on 03/21/2017. The tank battery consists of 3-100 bbl steel tanks, 1-vertical separator, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with a natural gas-powered motor. Well identification is posted at the wellhead as required, but the information on it is for the Maibach #2, rather than the #1 well. Jason Klauss with Harley Drilling was notified of this issue and will have it addressed promptly. No other problems were noted at the time of the inspection.
518693844 2020-5-21 0:00: PW No Violations
659175465 2016-10-31 0:00 PW No Violations
PL176 PL No Violations

For data sources see[9]

References