If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24782 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.96,"lon":-81.86,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Milton Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: MAIBACH | |
License Status: Producing | |
License Date: 1990-07-11 | |
Spud Date: 1990-09-14 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1990-09-20 | |
Well Total Depth: 3360.00 ft | |
Configuration: Vertical | |
Latitude: 40.960000 | |
Longitude: -81.860000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1990-07-11 | Issued Date 7/11/90 Expired Date 7/11/91 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03360 Proposed Drill Depth 03360 |
Original Spud | 1990-09-13 | |
Completed | 1990-09-20 | |
Reached Total Depth | 1990-09-20 | |
CO | 1990-10-21 | 1453 GREEN ENERGY INC GeoDate 7/11/90 |
Completion Report Received | 1991-01-03 | |
Construction Permit Expires | 1991-07-11 | |
Change of Owner | 2003-03-04 | Operator changed from 1453, GREEN ENERGY INC to 337, HARLEY DRILLING & PRODUCI |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3204 | 3280 | 0 |
3204 | 3280 | 0 | |
2006-09-11 | 3222 | 3287 | 26 |
3222 | 3287 | 26 | |
3204 | 3280 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 300 Gal | 0 | 27 BPM, SHUT IN 1040 | ||
H2O | 0 | 68610 Gal | 20000 | FRAC:WATER/SAND/ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | GREEN ENERGY INC | 0.00 | 63.00 | 365 |
1991 | GREEN ENERGY INC | 1352.00 | 284.00 | 365 |
1992 | GREEN ENERGY INC | 1238.00 | 332.00 | 365 |
1993 | GREEN ENERGY INC | 1155.00 | 228.00 | 365 |
1994 | GREEN ENERGY INC | 785.00 | 126.00 | 365 |
1995 | GREEN ENERGY INC | 444.00 | 154.00 | 365 |
1996 | GREEN ENERGY INC | 409.00 | 74.00 | 365 |
1997 | GREEN ENERGY INC | 317.00 | 152.00 | 365 |
1998 | GREEN ENERGY INC | 264.00 | 79.00 | 365 |
1999 | GREEN ENERGY INC | 273.00 | 78.00 | 365 |
2000 | GREEN ENERGY INC | 248.00 | 47.00 | 365 |
2001 | GREEN ENERGY INC | 227.00 | 72.00 | 365 |
2002 | GREEN ENERGY INC | 214.00 | 0.00 | 365 |
2003 | HARLEY DRILLING & PRODUCING LT | 5.00 | 0.00 | 365 |
2004 | HARLEY DRILLING & PRODUCING LT | 243.00 | 0.00 | 365 |
2005 | HARLEY DRILLING & PRODUCING LT | 402.00 | 0.00 | 365 |
2007 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 0 |
2009 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 0 |
2010 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | 0.00 | 82.00 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | 0.00 | 47.00 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 0.00 | 64.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1237467748 | 2017-1-19 0:00: | PL | No Violations | |
-1677578747 | 2020-4-14 0:00: | PW | No Violations | |
-771745817 | 2017-1-19 0:00: | PW | No Violations | |
000000PL53 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0434773398 | 2015-12-29 | Production Wells | No Violations | Inspected production well on 12/29/2015. The tank battery consists of 1-100 bbl steel tank and 1-vertical separator located within an earthen dike; the dike needs built up on the creek side. Steve Harley with Harley Drilling was notified of this issue and will address it promptly. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No other problems were noted at the time of the inspection. |
0457871720 | 2018-03-19 | Production Wells | No Violations | Inspected production well on 03/19/2018. The well is equipped with a pump jack with an electric motor, and 1-100 bbl steel tank. Well identification is clearly displayed on the tank. No problems were noted at the time of the inspection. |
0771745817 | 2017-01-19 | Production Wells | No Violations | Inspected production well on 01/19/2017. The tank battery consists of 1-100 bbl steel tank and 1-vertical separator, located within a partial earthen dike. The dike needs built-up on the lease road side in order to effectively serve as containment in the case of a release. Additionally, well identification is posted at the tank battery, but it is partially torn and needs replaced. Jason Klauss with Harley Drilling was notified of these issues and will have them addressed promptly. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
1237467748 | 2017-01-19 | Preliminary Restoration | No Violations | Inspected production well on 01/19/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
434773398 | 2015-12-29 0:00 | PW | No Violations | |
457871720 | 2018-3-19 0:00: | PW | No Violations | |
PL53 | PL | No Violations |
For data sources see[9]