If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-169-24944 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.91,"lon":-81.93,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Wayne | |
| Municipality: Canaan Township | |
| Operator Name: TRANSIT ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: JAQUET UNIT | |
| License Status: Producing | |
| License Date: 1993-06-23 | |
| Spud Date: 1993-07-08 | |
| Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
| Final Drill Date: 1993-07-17 | |
| Well Total Depth: 5617.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.910000 | |
| Longitude: -81.930000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1993-06-23 | Issued Date 6/23/93 Expired Date 6/23/94 Acres 0045000 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05617 Proposed Drill Depth 05617 |
| Original Spud | 1993-07-11 | |
| Completed | 1993-07-17 | |
| Reached Total Depth | 1993-07-17 | |
| CO | 1993-10-15 | 164 PETRO EVALUATION SERV INC GeoDate 6/23/93 |
| Completion Report Received | 1993-11-12 | |
| Construction Permit Expires | 1994-06-23 | |
| CO | 1994-09-15 | 513 DALTON & HANNA CO GeoDate 6/23/93 |
| Change of Owner | 2017-03-31 | Operator changed from 513, DALTON & HANNA LTD to 2771, TRANSIT ENERGY INC |
| Record Last Modified | 2017-03-31 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 5570 | 0 | |
| 5570 | 0 | ||
| 5570 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 15 | 2000 Gal | 0 | TRETED W/2000 GAL 15% HCL |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1995 | DALTON & HANNA LTD | 5439.00 | 3339.00 | 365 |
| 1996 | DALTON & HANNA LTD | 4414.00 | 1547.00 | 365 |
| 1998 | DALTON & HANNA LTD | 2402.00 | 518.00 | 365 |
| 1999 | DALTON & HANNA LTD | 2044.00 | 345.00 | 365 |
| 2000 | DALTON & HANNA LTD | 777.00 | 333.00 | 365 |
| 2001 | DALTON & HANNA LTD | 1412.00 | 348.00 | 365 |
| 2002 | DALTON & HANNA LTD | 1385.00 | 351.00 | 365 |
| 2003 | DALTON & HANNA LTD | 715.00 | 360.00 | 365 |
| 2004 | DALTON & HANNA LTD | 319.00 | 340.00 | 365 |
| 2005 | DALTON & HANNA LTD | 668.00 | 215.00 | 365 |
| 2006 | DALTON & HANNA LTD | 606.00 | 318.00 | 365 |
| 2007 | DALTON & HANNA LTD | 494.00 | 202.00 | 365 |
| 2008 | DALTON & HANNA LTD | 455.00 | 275.00 | 365 |
| 2009 | DALTON & HANNA LTD | 369.00 | 167.00 | 365 |
| 2010 | DALTON & HANNA LTD | 195.00 | 100.00 | 365 |
| 2011 | DALTON & HANNA LTD | 204.00 | 90.00 | 365 |
| 2012 | DALTON & HANNA LTD | 208.00 | 0.00 | 366 |
| 2013 | DALTON & HANNA LTD | 113.00 | 63.00 | 365 |
| 2014 | DALTON & HANNA LTD | 0.00 | 79.00 | 365 |
| 2015 | DALTON & HANNA LTD | 0.00 | 0.00 | 365 |
| 2016 | DALTON & HANNA LTD | 0.00 | 66.00 | 365 |
| 2017 | DALTON & HANNA LTD | 0.00 | 0.00 | 365 |
| 2018 | TRANSIT ENERGY INC | 135.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1995 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 1996 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 1998 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 1999 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2000 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2001 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2002 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2003 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2004 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2005 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2006 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2007 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2008 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2009 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2010 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2011 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2012 | DALTON & HANNA LTD | Brine | 0 | 366 |
| 2013 | DALTON & HANNA LTD | Brine | 80 | 365 |
| 2014 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2015 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2016 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2017 | DALTON & HANNA LTD | Brine | 0 | 365 |
| 2018 | TRANSIT ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1129298491 | 2016-8-8 0:00:0 | PW | No Violations | |
| -2093339842 | 2016-12-8 0:00: | PW | No Violations | |
| -457411463 | 2015-8-13 0:00: | PW | No Violations | 0.50 |
| -529649202 | 2020-4-23 0:00: | PW | No Violations | |
| -581060336 | 2010-4-29 0:00: | PW | No Violations | 0.70 |
| -773599004 | 2017-1-18 0:00: | PL | No Violations | |
| -849877622 | 2015-12-3 0:00: | PW | No Violations | |
| -931068091 | 2014-6-10 0:00: | PW | No Violations | 0.50 |
| 0457411463 | 2015-08-13 | Production Wells | No Violations | This is a pumping unit well. There are no evident compliance issues at this time. |
| 0581060336 | 2010-04-29 | Production Wells | No Violations | Chcked well today and found that a large ditch has been installed across wellsite./? |
| 0706302620 | 2013-06-21 | Production Wells | No Violations | This is a producing pump jack well. No apparent problems at this time. |
| 0773599004 | 2017-01-18 | Preliminary Restoration | No Violations | Inspected production well on 01/18/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
| 0824104470 | 2019-03-21 | Production Wells | No Violations | Inspected production well on 03/21/2019. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-horizontal separator, 1-drip, and 1-meter box, located within an earthen dike. Well identification is clearly displayed. The well is equipped with a swedge to the production casing, a pressure gauge, elbow, and flowline. The well was open-flowing at the time of the inspection. No problems were noted at the time of the inspection. |
| 0849877622 | 2015-12-03 | Production Wells | No Violations | Inspected production well on 12/03/2015. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-horizontal separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
| 0931068091 | 2014-06-10 | Production Wells | No Violations | This producing pumping unit well has no apparent problems at time of inspection. |
| 1129298491 | 2016-08-08 | Production Wells | No Violations | Inspected production well on 08/08/2016. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
| 1714326863 | 2017-01-18 | Production Wells | No Violations | Inspected production well on 01/18/2017. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
| 1838370279 | 2016-12-08 | Preliminary Restoration | No Violations | Inspected production well on 12/08/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
| 2093339842 | 2016-12-08 | Production Wells | No Violations | Inspected production well on 12/08/2016. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
| 2138113076 | 2018-02-22 | Production Wells | No Violations | Inspected production well on 02/22/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-horizontal separator, 1-drip, and 1-meter box, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a swedge into the production casing, with a pressure gauge, elbow, and flowline. The pump jack has been removed, and is sitting nearby. No problems were noted at the time of the inspection. |
| 706302620 | 2013-6-21 0:00: | PW | No Violations | 0.50 |
| 824104470 | 2019-3-21 0:00: | PW | No Violations |
For data sources see[9]