X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-24958

Well Details

Well ID: 34-169-24958
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: S & S ENERGY CORP
Well Pad ID:
Farm/Lease Name: MARTIN
License Status: Final Restoration
License Date: 2014-07-15
Spud Date: 1994-07-14
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1994-07-19
Well Total Depth: 5660.00 ft
Configuration: Vertical
Latitude: 40.890000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1993-10-29 Issued Date 10/29/93 Expired Date 10/29/94 Acres 0040000 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth Proposed Drill Depth
CO 1994-06-06 4356 JD PRODUCING INC GeoDate 6/6/94
Oil and Gas 1994-06-06 Issued Date 6/6/94 Expired Date 6/6/95 Acres 0124510 Tool Type RTAF Proposed Formation CLNN/TREMPEALEAU Proposed Depth 05660 Proposed Drill Depth 05660
Original Spud 1994-07-15 RI & RL 6/11/94
Completed 1994-07-19 RI & RL 6/11/94
Reached Total Depth 1994-07-19 RI & RL 6/11/94
CO 1994-09-23 4356 JD PRODUCING INC GeoDate 10/29/93
Completion Report Received 1994-10-17 RI & RL 6/11/94
Change of Owner 2013-06-13 Operator changed from 4356, JD PRODUCING INC to 5660, S & S ENERGY CORPORATION
Plugged/Abandoned 2014-02-19 RI & RL 6/11/94
APP 2014-07-15 Proposed Formations:CLINTON, Issued Date:7/15/2014, Expired Date:7/14/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2016-07-14 RI & RL 6/11/94
Record Last Modified 2018-03-22 RI & RL 6/11/94

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5551 5561 16
5555 0
1997-06-29 5555 0
5551 5561 16
5551 5561 16

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 550 Bbl 0 SALT WATER
ACID 0 2000 Gal 0 TREATED W/2000 GAL ACID & 500 BBL

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1994 JD PRODUCING INC 1107.00 583.00 124
1995 JD PRODUCING INC 5792.00 1798.00 365
1996 JD PRODUCING INC 3478.00 1511.00 365
1997 JD PRODUCING INC 2429.00 1303.00 365
1998 JD PRODUCING INC 1917.00 1062.00 365
1999 JD PRODUCING INC 2103.00 977.00 365
2000 JD PRODUCING INC 1407.00 447.00 365
2001 JD PRODUCING INC 1636.00 353.00 365
2002 JD PRODUCING INC 1372.00 338.00 365
2003 JD PRODUCING INC 1271.00 345.00 365
2004 JD PRODUCING INC 845.00 272.00 365
2005 JD PRODUCING INC 587.00 275.00 365
2006 JD PRODUCING INC 594.00 176.00 365
2007 JD PRODUCING INC 583.00 164.00 365
2008 JD PRODUCING INC 1350.00 76.00 365
2009 JD PRODUCING INC 0.00 0.00 365
2010 JD PRODUCING INC 415.00 94.00 365
2011 JD PRODUCING INC 403.00 106.00 365
2012 JD PRODUCING INC 469.00 0.00 366
2013 S & S ENERGY CORP 472.00 51.00 365
2014 S & S ENERGY CORP 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1994 JD PRODUCING INC Brine 288 124
1995 JD PRODUCING INC Brine 503 365
1996 JD PRODUCING INC Brine 339 365
1997 JD PRODUCING INC Brine 253 365
1998 JD PRODUCING INC Brine 264 365
1999 JD PRODUCING INC Brine 237 365
2000 JD PRODUCING INC Brine 420 365
2001 JD PRODUCING INC Brine 209 365
2002 JD PRODUCING INC Brine 224 365
2003 JD PRODUCING INC Brine 188 365
2004 JD PRODUCING INC Brine 223 365
2005 JD PRODUCING INC Brine 245 365
2006 JD PRODUCING INC Brine 178 365
2007 JD PRODUCING INC Brine 197 365
2008 JD PRODUCING INC Brine 15 365
2009 JD PRODUCING INC Brine 0 365
2010 JD PRODUCING INC Brine 90 365
2011 JD PRODUCING INC Brine 60 365
2012 JD PRODUCING INC Brine 68 366
2013 S & S ENERGY CORP Brine 32 365
2014 S & S ENERGY CORP Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1196509855 2017-3-13 0:00: FR No Violations
-1488815194 2018-1-4 0:00:0 FR No Violations
-2120029450 2014-4-10 0:00: FR No Violations 0.50
-239343946 2014-2-19 0:00: PB No Violations 4.00
-253109626 2003-6-18 0:00: PW No Violations 0.70
-479128560 2014-2-24 0:00: PB No Violations 0.50
0239343946 2014-02-19 Plug / Plug Back No Violations This well plugged and abandoned this date. See plug report for details.
0253109626 2003-06-18 Production Wells No Violations
0479128560 2014-02-24 Plug / Plug Back No Violations This recently plugged well has had the pit closed, but the well head remains in tact. Pumping unit, casing and tubing remain on location.
1196509855 2017-03-13 Final Restoration No Violations Visited location on 03/13/2017 to check on the status of reclamation. While the well has been plugged, cut-off, and buried, the pump jack remains at the location. Jason with S&S Energy indicated that the pump jack is welded together, and thus must be cut apart prior to being removed. He also indicated that as the compressor for the remaining Martin wells is located next to the pump jack and on the forest side of the lease road, that it is not being farmed, and approval has been granted by the landowner for it to remain. He was notifed that a landowner waiver must be filed prior to passing the final restoration. Upon receipt of the landowner waiver, final restoration will pass.
1488815194 2018-01-04 Final Restoration No Violations Performed final restoration inspection on 01/04/2018 at the request of Jason (S&S Energy). The pump jack noted in the previous inspection has been removed, and no surface expression of the well was noted at the time of the inspection. The lease road and tank battery are still present, as both are in-use by several other currently-producing wells on the same lease. No problems were noted at the time of the inspection. Final restoration passes.
2120029450 2014-04-10 Final Restoration No Violations Since the well head has not been cut off, the tubing and unit remain on location final restoration does not pass. Contacting company to determine what may be the cause of the delay.

For data sources see[9]

References