If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25348 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.95,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Canaan Township | |
Operator Name: INDUSTRY STANDARD SUPPLIES INC | |
Well Pad ID: | |
Farm/Lease Name: MCILVAINE UNIT | |
License Status: Final Restoration | |
License Date: 2012-03-13 | |
Spud Date: 2000-09-19 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2000-09-25 | |
Well Total Depth: 5455.00 ft | |
Configuration: Vertical | |
Latitude: 40.950000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-07-21 | Proposed Formations:TREMPEALEAU (MAY NOT PRODUCE CLINTON), Issued Date:7/21/00, Expired Date:7/21/01 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2000-09-19 | ADDED CLINTON TO PRODUCING FORMATIONS |
Completed | 2000-09-25 | ADDED CLINTON TO PRODUCING FORMATIONS |
Reached Total Depth | 2000-09-25 | ADDED CLINTON TO PRODUCING FORMATIONS |
Completion Report Received | 2001-02-26 | ADDED CLINTON TO PRODUCING FORMATIONS |
Correction to Well | 2001-04-20 | CHANGE IN PRODUCING FORMATIONS: ADDED CLINTON (MAY NOT PRODUCE CLINTON) |
Change of Owner | 2010-05-13 | Operator changed from 627, KENOIL to 8104, INDUSTRY STANDARD SUPPLIES INC |
APP | 2012-03-13 | Proposed Formations:CLINTON, Issued Date:3/13/2012, Expired Date:3/13/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2012-05-23 | ADDED CLINTON TO PRODUCING FORMATIONS |
Construction Permit Expires | 2014-03-13 | ADDED CLINTON TO PRODUCING FORMATIONS |
Record Last Modified | 2017-02-15 | ADDED CLINTON TO PRODUCING FORMATIONS |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-05-10 | 3160 | 3209 | 32 |
3160 | 3209 | 32 | |
3160 | 3209 | 32 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | KENOIL LLC | 0.00 | 0.00 | 365 |
2001 | KENOIL LLC | 1078.00 | 272.00 | 365 |
2002 | KENOIL LLC | 1137.00 | 144.00 | 365 |
2003 | KENOIL LLC | 1034.00 | 83.00 | 365 |
2004 | KENOIL LLC | 921.00 | 0.00 | 365 |
2005 | KENOIL LLC | 851.00 | 137.00 | 365 |
2006 | KENOIL LLC | 705.00 | 51.00 | 365 |
2007 | KENOIL LLC | 537.00 | 39.00 | 365 |
2008 | KENOIL LLC | 737.00 | 43.00 | 365 |
2009 | KENOIL LLC | 476.00 | 49.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | KENOIL LLC | Brine | 819 | 365 |
2001 | KENOIL LLC | Brine | 195 | 365 |
2002 | KENOIL LLC | Brine | 295 | 365 |
2003 | KENOIL LLC | Brine | 110 | 365 |
2004 | KENOIL LLC | Brine | 105 | 365 |
2005 | KENOIL LLC | Brine | 90 | 365 |
2006 | KENOIL LLC | Brine | 396 | 365 |
2007 | KENOIL LLC | Brine | 675 | 365 |
2008 | KENOIL LLC | Brine | 1110 | 365 |
2009 | KENOIL LLC | Brine | 1457 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0333479417 | 2013-04-15 | Final Restoration | No Violations | Tanks have been removed however the ladder, and assorted piping remains as well as the gravel for the tank battery. Final restoration IS NOT PASSED at this time. Will contact producer for updated restoration schedule. Called Tim Levengood and left message. |
1338486713 | 2012-05-23 | Plug / Plug Back | No Violations | Omega and Timco Well Service are plugging well to surface. This well was plugged back already from the Trempealeau to the Clinton. Now from the Clinton to surface. |
1814411835 | 2013-08-08 | Final Restoration | No Violations | There was no indication of the well, tank battery, or lease road. The vegetation and grading has been restored and the location is now a bean field. Final restoration passes. |
2052581868 | 2007-02-08 | Preliminary Restoration | No Violations | Meets requirements for Primary Restoration . |
333479417 | 2013-4-15 0:00: | FR | No Violations | 1.00 |
For data sources see[9]