If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-169-25376 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.69,"lon":-82,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Wayne | |
| Municipality: Clinton Township | |
| Operator Name: KENOIL LLC | |
| Well Pad ID: | |
| Farm/Lease Name: BOLEY | |
| License Status: Final Restoration | |
| License Date: 2010-06-04 | |
| Spud Date: 2001-07-02 | |
| Spud Drilling Contractor: CAPSTAR DRILLING | |
| Final Drill Date: 2001-07-07 | |
| Well Total Depth: 3194.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.690000 | |
| Longitude: -82.000000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2001-01-17 | 627 KENOIL Proposed Formation CLINTON, KNOX Issued Date 1/17/01 Expired Date 1/17/02 6:00:00 AM |
| Original Spud | 2001-07-02 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| Completed | 2001-07-07 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| Reached Total Depth | 2001-07-07 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| Completion Report Received | 2001-11-01 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| APP | 2010-06-04 | Proposed Formations:CLINTON, Issued Date:6/4/2010, Expired Date:6/4/2011 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2010-09-02 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| Construction Permit Expires | 2011-06-04 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
| Record Last Modified | 2017-02-15 | Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2002-01-07 | 3016 | 3084 | 67 |
| 3016 | 3084 | 67 | |
| 3016 | 3084 | 67 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1800 Bbl | 30000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | KENOIL LLC | 168.00 | 0.00 | 365 |
| 2002 | KENOIL LLC | 1790.00 | 70.00 | 365 |
| 2003 | KENOIL LLC | 944.00 | 0.00 | 365 |
| 2004 | KENOIL LLC | 488.00 | 62.00 | 365 |
| 2005 | KENOIL LLC | 411.00 | 0.00 | 365 |
| 2006 | KENOIL LLC | 341.00 | 0.00 | 0 |
| 2007 | KENOIL LLC | 328.00 | 60.00 | 0 |
| 2008 | KENOIL LLC | 216.00 | 0.00 | 365 |
| 2009 | KENOIL LLC | 250.00 | 0.00 | 365 |
| 2010 | KENOIL LLC | 213.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | KENOIL LLC | Brine | 400 | 365 |
| 2002 | KENOIL LLC | Brine | 65 | 365 |
| 2003 | KENOIL LLC | Brine | 30 | 365 |
| 2004 | KENOIL LLC | Brine | 17 | 365 |
| 2005 | KENOIL LLC | Brine | 0 | 365 |
| 2006 | KENOIL LLC | Brine | 0 | |
| 2007 | KENOIL LLC | Brine | 0 | |
| 2008 | KENOIL LLC | Brine | 0 | 365 |
| 2009 | KENOIL LLC | Brine | 35 | 365 |
| 2010 | KENOIL LLC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1259753032 | 2010-11-3 0:00: | FR | No Violations | 0.70 |
| -1928696000 | 2010-9-16 0:00: | FR | No Violations | 1.00 |
| -435765567 | 2010-9-2 0:00:0 | PB | No Violations | 6.70 |
| 0435765567 | 2010-09-02 | Plug / Plug Back | No Violations | Plug well to surface today with Moran well service . |
| 0482773918 | 2010-09-27 | Final Restoration | No Violations | Pits are closed and pipe has been cut off below grade. Need more vegetation before final restoration can be passed |
| 1026142656 | 2010-09-01 | Plug / Plug Back | No Violations | Phil Moran is plugging well and will be ready in the morning to set bottom plug. |
| 1259753032 | 2010-11-03 | Final Restoration | No Violations | Meets requirements for restoration final. |
| 1694344919 | 2010-09-07 | Plug / Plug Back | No Violations | Check to see if there are any leaks and found none. Cement down 5 ft so pipe can be cut off. |
| 1928696000 | 2010-09-16 | Final Restoration | No Violations | Pits are closed and pipe has been cut off below grade. No leaks. Area needs more vegetation before final can pass. |
| 482773918 | 2010-9-27 0:00: | FR | No Violations | 1.00 |
For data sources see[9]