If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89,"lon":-81.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Green Township | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: HARTZLER RONALD | |
License Status: Producing | |
License Date: 2001-02-16 | |
Spud Date: 2001-04-01 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2001-04-04 | |
Well Total Depth: 3635.00 ft | |
Configuration: Vertical | |
Latitude: 40.890000 | |
Longitude: -81.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2001-02-16 | 461 OBERMILLER PAUL J Proposed Formation CLINTON Issued Date 2/16/01 Expired Date 2/16/02 6:00:00 AM |
Original Spud | 2001-04-01 | RBDMS Rec |
Completed | 2001-04-04 | RBDMS Rec |
Reached Total Depth | 2001-04-04 | RBDMS Rec |
Completion Report Received | 2001-08-31 | RBDMS Rec |
Construction Permit Expires | 2002-02-16 | RBDMS Rec |
Change of Owner | 2013-12-06 | Operator changed from 461, OBERMILLER PAUL J to 8423, C & C PRODUCING LLC |
Change of Owner | 2016-11-14 | Operator changed from 8423, C & C PRODUCING LLC to 5569, D & D ENERGY COMPANY |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-10-24 | 3433 | 3491 | 20 |
3433 | 3491 | 20 | |
3433 | 3491 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | OBERMILLER PAUL J | 1859.00 | 0.00 | 228 |
2002 | OBERMILLER PAUL J | 3987.00 | 0.00 | 228 |
2003 | OBERMILLER PAUL J | 3201.00 | 0.00 | 228 |
2004 | OBERMILLER PAUL J | 0.00 | 2843.00 | 228 |
2005 | OBERMILLER PAUL J | 2317.00 | 0.00 | 365 |
2006 | OBERMILLER PAUL J | 2093.00 | 0.00 | 365 |
2007 | OBERMILLER PAUL J | 1830.00 | 0.00 | 365 |
2008 | OBERMILLER PAUL J | 1583.00 | 0.00 | 365 |
2009 | OBERMILLER PAUL J | 1674.00 | 0.00 | 365 |
2010 | OBERMILLER PAUL J | 1672.00 | 0.00 | 365 |
2011 | OBERMILLER PAUL J | 1511.00 | 0.00 | 365 |
2012 | OBERMILLER PAUL J | 1312.00 | 0.00 | 366 |
2013 | OBERMILLER PAUL J | 1065.00 | 0.00 | 365 |
2014 | C & C PRODUCING LLC | 1083.00 | 0.00 | 365 |
2015 | C & C PRODUCING LLC | 754.00 | 0.00 | 365 |
2016 | D & D ENERGY COMPANY | 0.00 | 0.00 | 0 |
2017 | D & D ENERGY COMPANY | 635.00 | 0.00 | 365 |
2018 | D & D ENERGY COMPANY | 373.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | OBERMILLER PAUL J | Brine | 2481 | 228 |
2002 | OBERMILLER PAUL J | Brine | 0 | 228 |
2003 | OBERMILLER PAUL J | Brine | 0 | 228 |
2004 | OBERMILLER PAUL J | Brine | 0 | 228 |
2005 | OBERMILLER PAUL J | Brine | 80 | 365 |
2006 | OBERMILLER PAUL J | Brine | 85 | 365 |
2007 | OBERMILLER PAUL J | Brine | 0 | 365 |
2008 | OBERMILLER PAUL J | Brine | 70 | 365 |
2009 | OBERMILLER PAUL J | Brine | 80 | 365 |
2010 | OBERMILLER PAUL J | Brine | 0 | 365 |
2011 | OBERMILLER PAUL J | Brine | 160 | 365 |
2012 | OBERMILLER PAUL J | Brine | 80 | 366 |
2013 | OBERMILLER PAUL J | Brine | 160 | 365 |
2014 | C & C PRODUCING LLC | Brine | 25 | 365 |
2015 | C & C PRODUCING LLC | Brine | 53 | 365 |
2016 | C & C PRODUCING LLC | Brine | 0 | 365 |
2017 | D & D ENERGY COMPANY | Brine | 0 | 365 |
2018 | D & D ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1518685599 | 2017-8-16 0:00: | PL | No Violations | |
-1729214508 | 2020-6-8 0:00:0 | PW | No Violations | |
0486699370 | 2015-06-09 | Production Wells | No Violations | This pumping unit well has no apparent issues at time of inspection. |
0613782587 | 2014-05-21 | Production Wells | No Violations | This is a pumping unit well. There are no apparent problems at time of inspection. |
0749154585 | 2018-02-15 | Production Wells | No Violations | Inspected production well on 02/15/2018. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, 1-drip, 1-meter with 1-regulator, and 1-meter box, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1015129161 | 2016-10-24 | Preliminary Restoration | No Violations | Inspected production well on 10/24/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1518685599 | 2017-08-16 | Preliminary Restoration | No Violations | Inspected production well on 08/16/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1964763752 | 2016-10-24 | Production Wells | No Violations | Inspected production well on 10/24/2016. The tank battery consists of 1-100 bbl steel tank and 1-vertical separator, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
2069387232 | 2017-08-16 | Production Wells | No Violations | Inspected production well on 08/16/2017. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, 1-drip, 1-meter, and 1-meter box, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
486699370 | 2015-6-9 0:00:0 | PW | No Violations | 0.50 |
613782587 | 2014-5-21 0:00: | PW | No Violations | 0.50 |
749154585 | 2018-2-15 0:00: | PW | No Violations |
For data sources see[9]