If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25385 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.91,"lon":-81.97,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Canaan Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: MAUST | |
License Status: Producing | |
License Date: 2001-07-16 | |
Spud Date: 2001-09-22 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2001-09-29 | |
Well Total Depth: 5572.00 ft | |
Configuration: Vertical | |
Latitude: 40.910000 | |
Longitude: -81.970000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2001-03-15 | 627 KENOIL Proposed Formation TREMPEALEAU (MAY NOT PRODUCE CLINTON) Issued Date 3/15/01 Expired Date 3/15/02 6:00:00 AM |
APP | 2001-07-16 | Proposed Formations:CLINTON/TREMPEALEAU, Issued Date:7/16/2001, Expired Date:7/16/2002 6:00:00 AM, Drilling unit acres:90, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2001-09-21 | UNIT SIZE REDUCED TO 86.49 ACRES. |
Original Spud | 2001-09-22 | RBDMS Rec |
Completed | 2001-09-29 | RBDMS Rec |
Reached Total Depth | 2001-09-29 | RBDMS Rec |
Completion Report Received | 2002-01-30 | RBDMS Rec |
Construction Permit Expires | 2002-07-16 | RBDMS Rec |
Change of Owner | 2017-04-10 | Operator changed from 627, KENOIL to 337, HARLEY DRILLING & PRODUCING |
Record Last Modified | 2017-04-10 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2002-04-01 | 3278 | 3330 | 66 |
3278 | 3330 | 66 | |
3278 | 3330 | 66 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | KENOIL LLC | 1969.00 | 639.00 | 365 |
2003 | KENOIL LLC | 1607.00 | 466.00 | 365 |
2004 | KENOIL LLC | 1146.00 | 399.00 | 365 |
2005 | KENOIL LLC | 1166.00 | 275.00 | 365 |
2006 | KENOIL LLC | 1099.00 | 310.00 | 365 |
2007 | KENOIL LLC | 431.00 | 194.00 | 365 |
2008 | KENOIL LLC | 630.00 | 257.00 | 365 |
2009 | KENOIL LLC | 370.00 | 251.00 | 365 |
2010 | KENOIL LLC | 800.00 | 234.00 | 365 |
2011 | KENOIL LLC | 395.00 | 202.00 | 0 |
2012 | KENOIL LLC | 489.00 | 206.00 | 366 |
2013 | KENOIL LLC | 504.00 | 242.00 | 365 |
2014 | KENOIL LLC | 593.00 | 191.00 | 365 |
2015 | KENOIL LLC | 545.00 | 214.00 | 365 |
2016 | KENOIL LLC | 589.00 | 187.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 250.00 | 134.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 527.00 | 235.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | KENOIL LLC | Brine | 165 | 365 |
2003 | KENOIL LLC | Brine | 40 | 365 |
2004 | KENOIL LLC | Brine | 65 | 365 |
2005 | KENOIL LLC | Brine | 40 | 365 |
2006 | KENOIL LLC | Brine | 25 | 365 |
2007 | KENOIL LLC | Brine | 15 | 365 |
2008 | KENOIL LLC | Brine | 0 | 365 |
2009 | KENOIL LLC | Brine | 0 | 365 |
2010 | KENOIL LLC | Brine | 25 | 365 |
2011 | KENOIL LLC | Brine | 40 | |
2012 | KENOIL LLC | Brine | 30 | 366 |
2013 | KENOIL LLC | Brine | 0 | 365 |
2014 | KENOIL LLC | Brine | 40 | 365 |
2015 | KENOIL LLC | Brine | 40 | 365 |
2016 | KENOIL LLC | Brine | 25 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | Brine | 65 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1382844581 | 2020-5-13 0:00: | PW | No Violations | |
-1869039597 | 2003-3-18 0:00: | PL | No Violations | 0.70 |
-2024443247 | 2018-2-22 0:00: | PW | No Violations | |
-334656874 | 2016-8-9 0:00:0 | PW | No Violations | |
-821997285 | 2017-2-2 0:00:0 | PL | No Violations | |
0009175947 | 2002-01-15 | Preliminary Restoration | No Violations | Restoration can not be approved because grading and seeding need done. Pits are closed. |
0050703726 | 2014-04-25 | Production Wells | No Violations | This is a pumping unit well. There are no apparent problems at this time. |
0334656874 | 2016-08-09 | Production Wells | No Violations | Inspected production well on 08/09/2016. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator, located within an earthen dike. The earthen dike is shared with the tank battery for Harley Drillings Maust #1 well. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
0821997285 | 2017-02-02 | Preliminary Restoration | No Violations | Inspected production well on 02/02/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1335850105 | 2015-08-06 | Production Wells | No Violations | This is a pumping unit well that has no apparent problems nor compliance issues at this time. |
1771807297 | 2015-12-03 | Production Wells | No Violations | Inspected production well on 12/03/2015. The tank battery consists of 2-100 bbl steel tanks and 1-vertical separator located within an earthen dike. The diked area is shared with the production equipment for Harley Drillings Maust #1 well. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1869039597 | 2003-03-18 | Preliminary Restoration | No Violations | |
1977044930 | 2017-02-02 | Production Wells | No Violations | Inspected production well on 02/02/2017. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, and 1-underground brine vault, located within an earthen dike; the diked area is shared with the tank battery for Harley Drillings Maust #1 well (PN: 169-23381). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
2024443247 | 2018-02-22 | Production Wells | No Violations | Inspected production wel on 02/22/2018. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike; the diked area is shared with the tank battery for the Maust #1 well (PN: 169-23381). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, and a compressor. No problems were noted at the time of the inspection. |
2102391874 | 2013-04-23 | Production Wells | No Violations | This is a producing pumping unit with no apparent problems at this time. |
50703726 | 2014-4-25 0:00: | PW | No Violations | 0.50 |
9175947 | 2002-1-15 0:00: | PL | No Violations | 0.70 |
For data sources see[9]