If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25464 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89,"lon":-81.97,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: CARSON DAVID & SUSAN | |
License Status: Producing | |
License Date: 2003-03-18 | |
Spud Date: 2003-04-10 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2003-04-14 | |
Well Total Depth: 3496.00 ft | |
Configuration: Vertical | |
Latitude: 40.890000 | |
Longitude: -81.970000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-03-18 | Proposed Formations:CLINTON, Issued Date:3/18/2003, Expired Date:3/17/2004 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2003-04-10 | RBDMS Rec |
Completed | 2003-04-14 | RBDMS Rec |
Reached Total Depth | 2003-04-14 | RBDMS Rec |
Completion Report Received | 2003-10-06 | RBDMS Rec |
Construction Permit Expires | 2004-03-17 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-11-20 | 3303 | 3362 | 70 |
3303 | 3362 | 70 | |
3303 | 3362 | 70 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 10000 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | HARLEY DRILLING & PRODUCING LT | 1669.00 | 1177.00 | 365 |
2004 | HARLEY DRILLING & PRODUCING LT | 5188.00 | 1400.00 | 365 |
2005 | HARLEY DRILLING & PRODUCING LT | 7340.00 | 1036.00 | 365 |
2006 | HARLEY DRILLING & PRODUCING LT | 6070.00 | 1054.00 | 365 |
2007 | HARLEY DRILLING & PRODUCING LT | 6590.00 | 709.00 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | 7371.00 | 511.00 | 365 |
2009 | HARLEY DRILLING & PRODUCING LT | 7691.00 | 524.00 | 365 |
2010 | HARLEY DRILLING & PRODUCING LT | 7370.00 | 180.00 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | 7169.00 | 521.00 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | 4746.00 | 347.00 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | 2056.00 | 168.00 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | 2377.00 | 170.00 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | 1650.00 | 115.00 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 2047.00 | 168.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 2949.00 | 171.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 4273.00 | 166.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2004 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2005 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2006 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2007 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2009 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2010 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | Brine | 85 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | Brine | 25 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1124120786 | 2016-11-2 0:00: | PW | No Violations | |
-1153347603 | 2017-5-17 0:00: | PL | No Violations | |
-11559486 | 2003-6-17 0:00: | PW | No Violations | 0.70 |
-128788713 | 2016-11-2 0:00: | PL | No Violations | |
-1535094289 | 2012-11-26 0:00 | PW | No Violations | |
-1701438119 | 2015-12-23 0:00 | PW | No Violations | |
-1891956965 | 2003-6-17 0:00: | PW | No Violations | 0.70 |
-2012639460 | 2017-5-17 0:00: | PW | No Violations | |
-504372476 | 2018-7-9 0:00:0 | PW | No Violations | |
-685486553 | 2003-4-30 0:00: | DD | No Violations | 1.00 |
-869813073 | 2013-10-10 0:00 | PW | No Violations | 0.50 |
-938680292 | 2014-8-7 0:00:0 | PW | No Violations | 0.50 |
0011559486 | 2003-06-17 | Production Wells | No Violations | Pits are closed and area needs graded and seeded . |
0128788713 | 2016-11-02 | Preliminary Restoration | No Violations | Inspected production well on 11/02/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0504372476 | 2018-07-09 | Production Wells | No Violations | Inspected production well on 07/09/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator, 1-meter box with a drip, and 1-compressor (shared), located within an earthen dike; the diked area and noted equipment are shared with the tank batteries for the D. Carson #H-2, #H-1, and #H-6 wells (PN: 169-25457/25328/25609). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0685486553 | 2003-04-30 | Drill / Deepen / Reopen | No Violations | The operator is pumping pits off today and they are just about ready to close . Pits liners are still in place . |
0763378126 | 2003-08-07 | Production Wells | No Violations | This well has just been drilled and pits are closed. Area needs graded and seeded . |
0869813073 | 2013-10-10 | Production Wells | No Violations | This producing pumping unit, in operation at time of inspection, has no apparent problems. |
0938680292 | 2014-08-07 | Production Wells | No Violations | This is a pumping unit well. There are no apparent problems at this time. |
1050671487 | 2003-04-11 | Drill / Deepen / Reopen | No Violations | Capstar Drilling set 489 ft. of 8 5/8 casing c/w 175 sks . |
105067148795569 | 2003-4-11 0:00: | PW | No Violations | 3.50 |
105067148795741 | 2003-4-11 0:00: | DD | No Violations | 3.50 |
1063038088 | 2003-08-26 | Preliminary Restoration | No Violations | Pits are closed and area needs graded and seeded before restoration can be passed. |
1124120786 | 2016-11-02 | Production Wells | No Violations | Inspected production well on 11/02/2016. The tank battery consists of 4-210 bbl steel tanks, 1-100 bbl steel tank, 2-vertical separators, 1-horizontal separator, and 1-compressor (shared with the Carson #H-6 well; PN: 169-25609), located within an earthen dike (shared with the production equipment for the Carson #H-6 well; PN: 169-25609). The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1153347603 | 2017-05-17 | Preliminary Restoration | No Violations | Inspected production well on 05/17/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1535094289 | 2012-11-26 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
1589421220 | 2020-7-2 0:00:0 | PW | No Violations | |
1701438119 | 2015-12-23 | Production Wells | No Violations | Inspected production well on 12/23/2015. The tank battery consists of 5-210 bbl steel tanks, 2-100 bbl steel tanks, 3-vertical separators, 1-horizontal separator, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (4); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1891956965 | 2003-06-17 | Production Wells | No Violations | Pits are closed and area graded , needs seeded . |
2012639460 | 2017-05-17 | Production Wells | No Violations | Inspected production well on 05/17/2017. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank (shared), 1-vertical separator, and 1-compressor (shared), located within an earthen dike; the diked area is shared with the tank batteries for the D. Carson #H-1, H-2, and H-6 wells (PN: 169-25328/25457/25609). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
763378126 | 2003-8-7 0:00:0 | PW | No Violations | 1.00 |
For data sources see[9]