If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25541 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.85,"lon":-81.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Baughman Township | |
Operator Name: LAKE REGION OIL INC | |
Well Pad ID: | |
Farm/Lease Name: STOLL | |
License Status: Producing | |
License Date: 2006-04-14 | |
Spud Date: 2006-05-09 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2006-05-27 | |
Well Total Depth: 3909.00 ft | |
Configuration: Vertical | |
Latitude: 40.850000 | |
Longitude: -81.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-04-14 | Proposed Formations:CLINTON, Issued Date:4/14/2006, Expired Date:4/14/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-05-09 | RBDMS Rec |
Completed | 2006-05-27 | RBDMS Rec |
Reached Total Depth | 2006-05-27 | RBDMS Rec |
Completion Report Received | 2006-11-14 | RBDMS Rec |
Construction Permit Expires | 2007-04-14 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-14 | 3742 | 3780 | 14 |
3742 | 3780 | 14 | |
3742 | 3780 | 14 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 110000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | LAKE REGION OIL INC | 0.00 | 0.00 | 89 |
2007 | LAKE REGION OIL INC | 3111.00 | 77.00 | 365 |
2008 | LAKE REGION OIL INC | 2149.00 | 72.00 | 365 |
2009 | LAKE REGION OIL INC | 1777.00 | 190.00 | 365 |
2010 | LAKE REGION OIL INC | 1511.00 | 55.00 | 365 |
2011 | LAKE REGION OIL INC | 1800.00 | 152.00 | 0 |
2012 | LAKE REGION OIL INC | 1527.00 | 64.00 | 366 |
2013 | LAKE REGION OIL INC | 1548.00 | 94.00 | 365 |
2014 | LAKE REGION OIL INC | 1748.00 | 37.00 | 365 |
2015 | LAKE REGION OIL INC | 1047.00 | 57.00 | 365 |
2016 | LAKE REGION OIL INC | 1212.00 | 63.00 | 365 |
2017 | LAKE REGION OIL INC | 1259.00 | 0.00 | 365 |
2018 | LAKE REGION OIL INC | 1116.00 | 48.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | LAKE REGION OIL INC | Brine | 8225 | 89 |
2007 | LAKE REGION OIL INC | Brine | 173 | 365 |
2008 | LAKE REGION OIL INC | Brine | 173 | 365 |
2009 | LAKE REGION OIL INC | Brine | 80 | 365 |
2010 | LAKE REGION OIL INC | Brine | 190 | 365 |
2011 | LAKE REGION OIL INC | Brine | 120 | |
2012 | LAKE REGION OIL INC | Brine | 180 | 366 |
2013 | LAKE REGION OIL INC | Brine | 20 | 365 |
2014 | LAKE REGION OIL INC | Brine | 95 | 365 |
2015 | LAKE REGION OIL INC | Brine | 20 | 365 |
2016 | LAKE REGION OIL INC | Brine | 95 | 365 |
2017 | LAKE REGION OIL INC | Brine | 105 | 365 |
2018 | LAKE REGION OIL INC | Brine | 50 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1365553437 | 2020-8-21 0:00: | PW | No Violations | |
-1460909893 | 2006-5-16 0:00: | DD | No Violations | 1.50 |
-1521927328 | 2016-12-21 0:00 | PW | No Violations | |
-1651906848 | 2013-7-10 0:00: | PW | No Violations | 0.50 |
-1744759035 | 2006-5-15 0:00: | DD | No Violations | 1.50 |
-2018465542 | 2006-5-25 0:00: | DD | No Violations | 1.50 |
-2053960381 | 2018-10-25 0:00 | PW | No Violations | |
-400232405 | 2006-5-10 0:00: | DD | No Violations | 7.00 |
-769472163 | 2007-5-2 0:00:0 | PL | No Violations | 0.70 |
-784879647 | 2016-12-21 0:00 | PL | No Violations | |
-858185152 | 2017-5-26 0:00: | PL | No Violations | |
-881258982 | 2007-1-16 0:00: | PL | No Violations | 0.70 |
0016657422 | 2006-05-23 | Drill / Deepen / Reopen | No Violations | Pinnacle Drilling is at 1615 ft. down for repairs .Pits are full and advise water truck to lower level.Wait on trucks to arrive and pump pit level down.Two truck began pumping pit level down .Liner still in place . |
0400232405 | 2006-05-10 | Drill / Deepen / Reopen | Violations Noted | Found that pits have been run over and that the liner has been damaged.Issue NOV for both and advise that after setting surface casing , that the rig would be down until cleanup and repairs have beem make .Collect photos and send to Columbus.After contacting Tom Tugend he advised that he would issue the Notice himself . |
0626996927 | 2006-05-12 | Drill / Deepen / Reopen | No Violations | Returned and found that pits have been relined and drains have been dug up and closed .Had problems with nipple up because of all the cement in the celar ,Dah !Checked down hill for signs of drainage from field tile and did not find any .My guess is that it dumps into the woods below but could not locate where . |
0769472163 | 2007-05-02 | Preliminary Restoration | No Violations | Meets requirements for Prelim Restoration . |
0784879647 | 2016-12-21 | Preliminary Restoration | No Violations | Inspected production well on 12/21/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0788301288 | 2006-07-27 | Drill / Deepen / Reopen | No Violations | Check this well because the pit liner had fallen and the pit level was full.The pits are closed and area is graded. Not seeded |
0858185152 | 2017-05-26 | Preliminary Restoration | No Violations | Inspected production well on 05/26/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0881258982 | 2007-01-16 | Preliminary Restoration | No Violations | |
0920451483 | 2017-05-26 | Production Wells | No Violations | Inspected production well on 05/26/2017. The tank battery consists of 1-100 bbl steel tank, 1-550 gal plastic tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is a rabbit well. No problems were noted at the time of the inspection. |
1152280169 | 2006-05-11 | Drill / Deepen / Reopen | No Violations | Arrive to find pits have been run over and mud and cuttings are all around the rig .Collect photos and send to Columbus .I found that the pits liners have been torn and the pits have drain tile in them .I found that fluid is draining down the tile and would have been able to drain a large amount of fluid into the tile system .Contact water trucks and had pits pumped off so that the liners and drains can be repaired .Issue NOV along with Columbus from Tom Tugend .Continued on site until surface was set and pits have been corrected .Pumped 300sks cement and did not have returns .Next pumped 10 yds of 9 sk grout from Ready Mix truck and still no returns.Pumped another 50 sks hot cement and still no returns,wait two hours and pump another 50 sks and did have returns . |
1168011964 | 2006-06-19 | Production Wells | No Violations | Check well after a water well complaint came in about this well causing the loss of water in the well .The well is over 1 mile and closer to 1.5 miles away from the complaint .There are no other complaints of water being lost in the area . |
1189790707 | 2015-03-16 | Production Wells | No Violations | This is a plunger lift well. No apparent issues at this time. |
1333014424 | 2016-03-07 | Production Wells | No Violations | Inspected production well on 03/07/2016. The tank battery consists of 1-100 bbl steel tank, 1-550 gal plastic tank, and 1-horizontal separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is a rabbit well. No problems were noted at the time of the inspection. |
1460909893 | 2006-05-16 | Drill / Deepen / Reopen | No Violations | Check on rig status and found that they are still hung in the hole and will have to was over . |
1521927328 | 2016-12-21 | Production Wells | No Violations | Inspected production well on 12/21/2016. The tank battery consists of 1-100 bbl steel tank, 1-550 gal plastic tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is a rabbit well. No problems were noted at the time of the inspection. |
1651906848 | 2013-07-10 | Production Wells | No Violations | This plunger lift well has no apparent problems at this time. |
16657422 | 2006-5-23 0:00: | DD | No Violations | 2.50 |
1744759035 | 2006-05-15 | Drill / Deepen / Reopen | No Violations | Check on rig and pit status and found that rig has become hung in the hole below the Berea . |
2018465542 | 2006-05-25 | Drill / Deepen / Reopen | No Violations | Pinnacle is at 2600 ft on 7/78 hole soaping .Pit level is good for now . |
2053960381 | 2018-10-25 | Production Wells | No Violations | Inspected production well on 10/25/2018. The tank battery consists of 1-100 bbl steel tank, 1-550 gal plastic tank, 1-horizontal separator, 1-drip, and 1-meter box, located within an earthen dike. Well identification is posted at the tank battery. The well is a rabbit well. No problems were noted at the time of the inspection. |
2131250324 | 2016-10-03 | Production Wells | No Violations | Inspected production well tank battery on 10/03/2016. The tank battery consists of 1-100 bbl steel tank, 1-550 gal plastic tank, and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The wellhead was plowed in with corn and could not be accessed at the time of the inspection. Will follow-up after the corn has been harvested to inspect the well. No other problems were noted at the time of the inspection. |
626996927 | 2006-5-12 0:00: | DD | No Violations | 2.50 |
788301288 | 2006-7-27 0:00: | DD | No Violations | 1.00 |
920451483 | 2017-5-26 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0400232405 | US-OH-124265 | 2006-07-05 | Drilling operation causing pollution and contamination | |
0400232405 | US-OH-124266 | 2006-07-05 | Pit insufficient size to contain oil, brine, cuttings | |
0400232405 | US-OH-124267 | 2006-07-05 | Disposal of muds or cutting in violations of a rule |
For data sources see[9]