Well Details

Well ID: 34-169-25553
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: BEERY
License Status: Producing
License Date: 2007-09-26
Spud Date: 2007-11-30
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2007-12-04
Well Total Depth: 3298.00 ft
Configuration: Vertical
Latitude: 40.960000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-09-22 Proposed Formations:CLINTON, Issued Date:9/22/2006, Expired Date:9/22/2007 6:00:00 AM, Drilling unit acres:161.837, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2007-09-26 Proposed Formations:CLINTON, Issued Date:9/26/2007, Expired Date:9/25/2008 6:00:00 AM, Drilling unit acres:161.837, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2007-12-04
Completion Report Received 2008-05-14
Construction Permit Expires 2008-09-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-09-02 3092 3169 76
3092 3169 76
3092 3169 76

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 3150 Mscf 30000 ALSO USED 1200 BBLS WATER IN FRAC

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 HARLEY DRILLING & PRODUCING LT 497.00 141.00 365
2009 HARLEY DRILLING & PRODUCING LT 852.00 390.00 365
2010 HARLEY DRILLING & PRODUCING LT 591.00 311.00 365
2011 HARLEY DRILLING & PRODUCING LT 634.00 312.00 365
2012 HARLEY DRILLING & PRODUCING LT 169.00 303.00 366
2013 HARLEY DRILLING & PRODUCING LT 156.00 151.00 365
2014 HARLEY DRILLING & PRODUCING LT 70.00 321.00 365
2015 HARLEY DRILLING & PRODUCING LT 207.00 156.00 365
2016 HARLEY DRILLING & PRODUCING LT 670.00 267.00 365
2017 HARLEY DRILLING & PRODUCING LT 519.00 120.00 365
2018 HARLEY DRILLING & PRODUCING LT 654.00 250.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 HARLEY DRILLING & PRODUCING LT Brine 2165 365
2009 HARLEY DRILLING & PRODUCING LT Brine 0 365
2010 HARLEY DRILLING & PRODUCING LT Brine 0 365
2011 HARLEY DRILLING & PRODUCING LT Brine 0 365
2012 HARLEY DRILLING & PRODUCING LT Brine 0 366
2013 HARLEY DRILLING & PRODUCING LT Brine 15 365
2014 HARLEY DRILLING & PRODUCING LT Brine 5 365
2015 HARLEY DRILLING & PRODUCING LT Brine 0 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 0 365
2018 HARLEY DRILLING & PRODUCING LT Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1648052442 2016-10-17 0:00 PL No Violations
-1749014095 2013-7-31 0:00: PL No Violations 0.50
-189232583 2007-12-1 0:00: DD No Violations 6.00
-208038957 2007-11-29 0:00 DD No Violations 1.50
-493973992 2007-11-30 0:00 DD No Violations 1.50
-806416420 2014-11-25 0:00 PW No Violations 0.50
0031425030 2007-12-03 Drill / Deepen / Reopen No Violations Maric Drilling is at 2407 ft. soaping on 7 7/8 hole
0110837519 2007-12-05 Drill / Deepen / Reopen No Violations Maric D

illing moved rig today off well.

0164874754 2016-03-15 Production Wells No Violations Inspected production well on 03/15/2016. The tank battery consists of 4-100 bbl steel tanks, 1-4,200 gal plastic tank, 3-vertical separators, and 1-compressor located within a shallow earthen dike. The dike needs built-up in all directions in order to effectively serve as containment in the case of a release. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead, but the API Number listed on it is incorrect. Jason Klauss with Harley Drilling was notified of both issues and will have them addressed promptly. No other problems were noted at the time of the inspection.
0189232583 2007-12-01 Drill / Deepen / Reopen No Violations Maric Drilling set 617 ft. of 85/8 casing
0208038957 2007-11-29 Drill / Deepen / Reopen No Violations Maric Drilling has moved in ready to drill.
0493973992 2007-11-30 Drill / Deepen / Reopen No Violations Maric Drilling at 100 ft. mixing mud should be ready late tonight.
0789151598 2018-02-27 Production Wells No Violations Inspected production well on 02/27/2018. The tank battery consists of 2-100 bbl steel tanks, 1-2,100 gal plastic tank (shared), 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike; the diked area is shared with the Beery #1 well (PN: 169-21997), as well as with 1-vertical separator and 1-compressor (labeled as belonging to Kenoil). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0806416420 2014-11-25 Production Wells No Violations Well road and surrounding area currently being excavated by pipeliners. Unable to access well head. Tank battery appears to have no issues at this time.
110837519 2007-12-5 0:00: DD No Violations 1.00
1637161156 2017-04-25 Production Wells No Violations Inspected production well on 04/25/2017. The tank battery consists of 2-100 bbl steel tanks, 1-2,100 gal plastic tank (shared), 2-vertical separators, and 1-compressor (shared), located within an earthen dike; the diked area is shared with the tank battery for the Beery #1 well (PN: 169-21997). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1648052442 2016-10-17 Preliminary Restoration No Violations Inspected production well on 10/17/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
164874754 2016-3-15 0:00: PW No Violations
1688987609 2016-10-17 Production Wells No Violations Inspected production well on 10/17/2016. The tank battery consists of 4-100 bbl steel tanks, 1-2,100 gal plastic tank, 3-vertical separators, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1749014095 2013-07-31 Preliminary Restoration No Violations Appears to meet requirements for preliminary and final restoration as crops are thriving.
2020962933 2017-04-25 Preliminary Restoration No Violations Inspected production well on 04/25/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes.
31425030 2007-12-3 0:00: DD No Violations 1.50
37027976 2020-5-14 0:00: PW No Violations
789151598 2018-2-27 0:00: PW No Violations

For data sources see[9]