If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.72,"lon":-81.7,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Paint Township | |
Operator Name: HG ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: ROGER L & JOANNE M EBERLY | |
License Status: Plugged and Abandoned | |
License Date: 2017-12-08 | |
Spud Date: 2018-01-03 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: 80.00 ft | |
Configuration: Vertical | |
Latitude: 40.720000 | |
Longitude: -81.700000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-08 | Proposed Formations:ROSE RUN, Issued Date:12/8/2017, Expired Date:12/8/2019 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2018-01-20 | |
Construction Permit Expires | 2019-12-08 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1355639457 | 2018-04-02 | Drill / Deepen / Reopen | No Violations | Visited location on 04/02/2018 to check on the status of location construction. The location has been graded and stoned, and an earthen berm plced around the margins of the location. A steel plate was noted to have been welded on-top of the conductor casing. No problems were noted at the time of the inspection. |
For data sources see[3]