If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7,"lon":-81.74,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Paint Township | |
Operator Name: HG ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: DANIEL S & ADA D HERSHBERGER | |
License Status: Plugged and Abandoned | |
License Date: 2017-12-21 | |
Spud Date: 2018-03-22 | |
Spud Drilling Contractor: NOAH HORN DRILLING | |
Final Drill Date: 2018-04-09 | |
Well Total Depth: 6647.00 ft | |
Configuration: Vertical | |
Latitude: 40.700000 | |
Longitude: -81.740000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-21 | Proposed Formations:ROSE RUN, Issued Date:12/21/2017, Expired Date:12/21/2019 12:00:00 PM, Drilling unit acres:76.41, Proposed Well Type:OG, Proposed Well Class:EOUT |
Correction to Well | 2018-02-23 | CORRECTION TO CASING PROGRAM. |
Reached Total Depth | 2018-04-09 | |
Record Last Modified | 2019-04-05 | |
Construction Permit Expires | 2019-12-21 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | HG ENERGY LLC | 110.00 | 0.00 | 8 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | HG ENERGY LLC | Brine | 70 | 8 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1066343110 | 2018-4-5 0:00:0 | DD | No Violations | |
-1143720507 | 2018-4-27 0:00: | CT | No Violations | |
-1204751873 | 2018-3-27 0:00: | CS | No Violations | |
-1326462124 | 2018-4-26 0:00: | CT | No Violations | |
-1487436421 | 2018-4-30 0:00: | CT | No Violations | |
-1614546894 | 2018-10-2 0:00: | PW | No Violations | |
-1815615486 | 2018-4-17 0:00: | PL | No Violations | |
-1830144005 | 2018-4-2 0:00:0 | DD | No Violations | |
-2045253761 | 2018-4-25 0:00: | CT | No Violations | |
-6551925 | 2018-4-9 0:00:0 | DD | No Violations | 3.50 |
-890354619 | 2018-3-28 0:00: | CS | No Violations | |
0006551925 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Allie Oprzadek. See her report for details. |
0409317244 | 2018-03-26 | Drill / Deepen / Reopen | No Violations | Arrived on location on 03/26/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was on-site rigging up their air system and preparing to run in the hole with the surface assebly. Pits have been lined, the location bermed, and erosion control measures were in place. No problems were noted at the time of the inspection. |
0516269012 | 2018-03-27 | Casing String Witnessed | No Violations | Arrived on location on 03/27/2018 to witness the pressure test on the surface casing. Pressured up to 510# and held for 30 minutes. At the end of the test, the pressure had dropped 20# to 490#. Test passed. |
0890354619 | 2018-03-28 | Casing String Witnessed | No Violations | Arrived on location on 03/28/2018 to witness the intermediate casing cement job. Inspector Randy Akins was also on-site. Noah Horn Well Drilling Rig #831 was finishing-up running 8 5/8 casing to 1,064 with 4-centralizers. Rigged up Petroset. Pumped ~70 bbls of freshwater ahead, then started mixing gel and hulls. The well began circulating ~20 bbls into pumping cement. Good cement was seen at surface, with ~25 bbls of cement circulated to the pit. Landed the plug at 450#. Pressured the well up to 950# and held for 5 minutes. At the end of the test, the pressure had dropped to 900#. Pressure test passed. No problems were noted during cementing operations. |
0897056290 | 2018-03-28 | Casing String Witnessed | No Violations | Arrived on location on 03/28/2018 to witness BOP testing. B&B Oilfield Equipment was on-site rigged-up to perform the test. To test the blind rams, the well was pressured up to 500# and held for 30 minutes. No pressure was lost at the end of the test. Blind ram BOP test passed. Ran in the hole with several drill collars prior to testing pipe rams. Pressured up initially, and several leaks were noted at the BOP. Repaired BOP connections, then pressured well up to 515#. After 30 minutes, the pressure had dropped to 499#. Pipe ram BOP test passed. No problems were noted during BOP testing. |
1066343110 | 2018-04-05 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/05/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling ahead at 4,600. |
1069004215 | 2018-04-03 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/03/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling (soaping) the 7 7/8 hole at 3,760. No problems were noted at the time of the inspection. |
1143720507 | 2018-04-27 | Completion Testing | No Violations | Arrived on location on 04/27/2018 to check on the status of flowback operations. The well was plugged off with perf balls with the tubing at 5,490. Ran downhole with swab tools to free-up the downhole obstruction, then ran tubing downhole to continue swabbing the well. No problems were noted during completion testing operations. |
1204751873 | 2018-03-27 | Casing String Witnessed | No Violations | Arrived on location on 03/27/2018 to witness the surface casing cement job. Inspector Bob Roush was also on-site. Noah Horn Well Drilling Rig #831 was tripping out of the hole with the last of the drill pipe. 16 joints of 11 3/4 casing was run to 598 with 4 centralizers. Rigged up Petroset. Established circulation, pumped gel and hulls ahead, then pumped cement. Good cement was seen at surface, and there were ~32 bbls of cement returns. No problems were noted during cementing operations. |
1326462124 | 2018-04-26 | Completion Testing | No Violations | Arrived on location on 04/26/2018 to witness the acid job on the well. Hagen Well Service was rigged up on-site. Rigged up Producers Service Corp. and waited on the water truck. Rigged up S&H Water. Broke circulation, then spotted 1,000 gal of HCl and displaced it with freshwater. Pulled 3 joints of tubing, then continued pumping to break down the formation at 1,828#. Cleared casing of acid, then shut-down operations to wait on the water truck to reload. Perf balls were released every 15-20 gal, then displaced with freshwater, and the well shut-in for 15-minutes. Rigged down, moved out Producers Service Corp. Hagen Well Service will re-run the 3-joints removed during completion testing, and prepare to swab the well. No problems were noted during completion operations. |
1487436421 | 2018-04-30 | Completion Testing | No Violations | Arrived on location on 04/30/2018 to check on the status of flowback operations. Hagen Well Service was on-site flowing back the well into steel tanks. No problems were noted at the time of the inspection. |
1522321649 | 2018-03-28 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I accompanied Inspector Allie Oprzadek to do the cementing of the intermediate string of pipe. Please refer to her report. |
1523288795 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | I accompanied Inspector Allie Oprzadek on location to cement the production string. Please refer to her report. |
1539691414 | 2018-10-09 | Preliminary Restoration | No Violations | Inspected production well on 10/09/2018. The tank battery consists of 1-210 bbl steel tank, located within an earthen dike; 1-horizontal separator with a drip is located within a separate earthen dike nearby. The well is equipped with a threaded wellhead with a flanged master valve, and flowline. Well identification is clearly displayed at both the tank battery and the wellhead. Pits have been closed, the location restored, and the well placed into production. Preliminary restoration passes. |
1614546894 | 2018-10-02 | Production Wells | No Violations | Arrived on location on 10/02/2018. Hagen Well Service was rigged-up onsite, swabbing the well. After 8 swab runs, the well kicked-off. No problems were noted at the time of the inspection. |
1665126456 | 2018-04-23 | Drill / Deepen / Reopen | No Violations | Visited location on 04/23/2018 to check on the status of reclamation efforts prior to moving-in the service rig for completion operations. All drilling-related equipment (with the exception of one steel water tank) has been removed from the location. Pits are still open and fencing up, but most of the fluids have been removed. Service rig is anticipated to arrive on Wednesday (04/25/2018). No problems were noted at the time of the inspection. |
1815615486 | 2018-04-17 | Preliminary Restoration | No Violations | Arrived on location on 04/17/2018 to check on the status of location reclamation. The rig and most associated equipment has been removed, and a wellhead installed and left shut-in. Pits remain open and fenced-in. No problems were noted at the time of the inspection. |
1830144005 | 2018-04-02 | Drill / Deepen / Reopen | No Violations | Visited location on 04/02/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling ahead at 2,703 (in the Big Lime). No problems were noted at the time of the inspection. |
2045253761 | 2018-04-25 | Completion Testing | No Violations | Arrived on location on 04/25/2018 to witness the bond log and perforation job on the well. Rigged up Hagen Well Service and Appalachian Well Surveys. Ran downhole with logging tools. Top of cement was noted to be at ~5,270 (~1,100 above the top perforation). Laid down logging tools and ran downhole with perforation guns. 3-gun runs were made to perforate the well from 6,376-6,420. Rigged down, moved out Appalachian Well Surveys. Hagen Well Service will run 2 3/8 tubing downhole in preparation for tomorrows acid job. No problems were noted during completion testing operations. |
2072153789 | 2018-04-03 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/03/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling the 7 7/8 hole at 4,200. Erosion control measures held up in heavy overnight rains. No problems were noted at the time of the inspection. |
409317244 | 2018-3-26 0:00: | DD | No Violations | |
516269012 | 2018-3-27 0:00: | CS | No Violations | |
570891933 | 2019-7-5 0:00:0 | PW | No Violations | |
888669472 | 2019-9-24 0:00: | FR | No Violations | |
897056290 | 2018-3-28 0:00: | CS | No Violations |
For data sources see[7]