If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-173-61229 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-83.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wood | |
Municipality: Henry Township | |
Operator Name: EVANSVILLE WESTERN RAILWAY INC | |
Well Pad ID: | |
Farm/Lease Name: CSX | |
License Status: Final Restoration | |
License Date: 2009-07-01 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -83.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 2009-06-12 | KEN PIISPANEN INSPECTED WELL 6/10/2009. WELL WAS STRUCK WHILE EXCAVATING A RETENTION POND FOR A CSX RAILROAD TERMINAL PROJECT. WOOD CASING WAS FOUND IN EXCAVATED MATERIAL. AN OPEN 8-INCH BORE HOLD WAS LOCATED IN THE TOP OF THE BEDROCK. FRESH WATER WAS DISCHARGING FROM THE HOLD AND FLOODED THE EXCAVATION. WATER WAS PUMPED DOWN FROM THE IMPOUNDMENT, AND THE INSPECTOR TOOK GPS AND PICTURES. THE OPERATOR INTENDS TO PAY A CONTRACTOR TO PLUG THE WELL RATHER THAN PLACE IT IN THE ORPHAN WELL PROGRAM. |
APP | 2009-07-01 | Proposed Formations:, Issued Date:7/1/2009, Expired Date:7/1/2010 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged by Orphan Well Program | 2009-08-26 | Plugged by Orphan Well Program |
Plugged/Abandoned | 2009-08-26 | KEN PIISPANEN INSPECTED WELL 6/10/2009. WELL WAS STRUCK WHILE EXCAVATING A RETENTION POND FOR A CSX RAILROAD TERMINAL PROJECT. WOOD CASING WAS FOUND IN EXCAVATED MATERIAL. AN OPEN 8-INCH BORE HOLD WAS LOCATED IN THE TOP OF THE BEDROCK. FRESH WATER WAS DISCHARGING FROM THE HOLD AND FLOODED THE EXCAVATION. WATER WAS PUMPED DOWN FROM THE IMPOUNDMENT, AND THE INSPECTOR TOOK GPS AND PICTURES. THE OPERATOR INTENDS TO PAY A CONTRACTOR TO PLUG THE WELL RATHER THAN PLACE IT IN THE ORPHAN WELL PROGRAM. |
Construction Permit Expires | 2010-07-01 | KEN PIISPANEN INSPECTED WELL 6/10/2009. WELL WAS STRUCK WHILE EXCAVATING A RETENTION POND FOR A CSX RAILROAD TERMINAL PROJECT. WOOD CASING WAS FOUND IN EXCAVATED MATERIAL. AN OPEN 8-INCH BORE HOLD WAS LOCATED IN THE TOP OF THE BEDROCK. FRESH WATER WAS DISCHARGING FROM THE HOLD AND FLOODED THE EXCAVATION. WATER WAS PUMPED DOWN FROM THE IMPOUNDMENT, AND THE INSPECTOR TOOK GPS AND PICTURES. THE OPERATOR INTENDS TO PAY A CONTRACTOR TO PLUG THE WELL RATHER THAN PLACE IT IN THE ORPHAN WELL PROGRAM. |
Record Last Modified | 2019-06-14 | KEN PIISPANEN INSPECTED WELL 6/10/2009. WELL WAS STRUCK WHILE EXCAVATING A RETENTION POND FOR A CSX RAILROAD TERMINAL PROJECT. WOOD CASING WAS FOUND IN EXCAVATED MATERIAL. AN OPEN 8-INCH BORE HOLD WAS LOCATED IN THE TOP OF THE BEDROCK. FRESH WATER WAS DISCHARGING FROM THE HOLD AND FLOODED THE EXCAVATION. WATER WAS PUMPED DOWN FROM THE IMPOUNDMENT, AND THE INSPECTOR TOOK GPS AND PICTURES. THE OPERATOR INTENDS TO PAY A CONTRACTOR TO PLUG THE WELL RATHER THAN PLACE IT IN THE ORPHAN WELL PROGRAM. |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0292921652 | 2009-08-26 | Plug / Plug Back | No Violations | Well has been cleaned out to Total depth of 1155 feet. Run tubing set bottom plug. Good retruns. |
1244750393 | 2009-06-10 | Orphan | No Violations | An orphan well was struck while excavating a retention pond for a CSX railroad terminal project. Wood casing was found in the excavated material and an open 8 inch bore hole was located in the top of the bedrock. Fresh water was discharging from the hole and flooded the excavation. Water was pumped down from the impoundment and inspectortook GPS and pictures of the well. The operator intends to pay contractor to plug the well rather than place on orphan well program. |
1249485030 | 2009-08-04 | Orphan | No Violations | Operator ran 105 feet of 5 inch steel pipe inside of 8 inch conductor pipe to protect fresh water zone during cleanout and plugging of well. First attempt to cement 5 inch casing into well was unsuccessful. Today pumped Half Bag Grout into well to form temporary plug between bridge located at depth of approximately 270 feet and the bottom of the 5 inch pipe. Class A cement was then pumped between the 5 inch and 8 inch pipe to try to cement 5 inch pipe in well. Cement rose to surface but then dropped. Possible that cement is going into formation. Will check cement on pipe the following day and if stable will start drilling to clean out well. |
1252522393 | 2009-09-09 | Final Restoration | No Violations | Well was plugged on 8/26/09 & 8/27/09. Well was plugged from total depth of 1155 feet to surface with class A cement and 9 sack grout. Plug was witnessed by ODNR inspector Tom Benko. All debris removed from well site. ID plate attached to top of well (photo taken). Well cut off below ground elevation and pit backfilled. Well is located in retention basin for railroad yard. Final restoration is acceptable. |
1420523772 | 2009-07-29 | Orphan | No Violations | An 8 inch pipe was driven into the open well bore at top of rock. Dirt was packed and graded around pipe to allow access of drill rig to well. During backfilling/grading around pipe, the pipe was hit so that the pipe was not straight over the well. Pit was excavated around pipe and pipe leveled in line with well bore. Cement will be poured to keep pipe from moving during drilling. |
292921652 | 2009-8-26 0:00: | PB | No Violations |