If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.484782,"lon":-79.728184,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: GOSPEL CHURCH 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-01-23 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.484782 | |
Longitude: -79.728184 |
Date | Event |
---|---|
2009-01-23 | New Permit Application |
2009-03-13 | Performed Spud Operation |
2009-03-24 | Drilling Completion |
2009-03-31 | Perforation |
2010-01-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | 9895.00 | 275 | 3023.00 | 275 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 9,072.00 | 365 | 1625.41 | 365 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 6,971.00 | 365 | 858.19 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 6,375.00 | 366 | 842.86 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 6,103.00 | 365 | 687.66 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 4,097.00 | 334 | 152.54 | 334 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 4,732.83 | 365 | 497.80 | 92 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 4,206.42 | 366 | 368.14 | 91 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 5,071.00 | 365 | 542.66 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 4,843.78 | 365 | 133.97 | 30 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 3,763.20 | 365 | 257.54 | 61 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | Drilling | 385.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | PENNECO OIL CO INC | Brine | 123.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | PENNECO OIL CO INC | Fracking Fluid | 1,120.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 10.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 14.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 14 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1846846 | Primary Facility | 2009-12-02 | Routine/Complete Inspection | No Violations Noted | Drilling was completed. |
1892337 | Primary Facility | 2010-06-04 | Routine/Complete Inspection | No Violations Noted | On June 4th, 2010, I visited this site as a routine inspection. The well was in production. Drilling was completed 03/24/2009. A well tag was present. The access road was in good condition and the site was well vegetated. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1895160 | Primary Facility | 2010-06-15 | Routine/Complete Inspection | No Violations Noted | PUMP JACK IS OPERATING. THE TANKS ARE DIKED AND ALL EQUIPMENT IS FENCED IN. THE SITE IS RESTORED AND VEGETATED.THE SITE AND ACCESS ARE STONED. |
2082288 | Primary Facility | 2012-07-11 | Routine/Complete Inspection | No Violations Noted | John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of inspection, the well was drilled and equipped for production. The site was secured and the well was tagged. The well apparatus appeared to be in sound condition. The site was restored and meets the 70% uniform vegetative coverage criteria. |
2410613 | Primary Facility | 2015-09-22 | Routine/Complete Inspection | No Violations Noted | OPERATING OIL AND GAS WELL. THE JACK AND TANKS ARE FENCED. |
2683665 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and pump jack appear to be in sound condition. The site was covered with snow. The Department plans to follow up during the spring of 2018 to evaluate vegetative growth. |
For data sources see[7]