If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22074 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48677,"lon":-79.823704,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Penn Hills Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: KICKLER 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-21 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.486770 | |
Longitude: -79.823704 |
Date | Event |
---|---|
2009-08-21 | New Permit Application |
2010-05-19 | Performed Spud Operation |
2010-06-01 | Drilling Completion |
2010-06-09 | Perforation |
2013-04-22 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 2,397.00 | 153 | 299.51 | 153 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 8,423.00 | 365 | 480.36 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 11,578.00 | 366 | 304.64 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 9,249.00 | 365 | 311.42 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 7,851.00 | 365 | 203.11 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 7,103.34 | 365 | 164.14 | 61 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 8,058.70 | 366 | 220.87 | 62 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 7,524.00 | 365 | 223.97 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 12,958.77 | 365 | 257.15 | 92 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 13,910.53 | 365 | 168.75 | 61 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | Fracing Fluid Waste | 930.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PENNECO OIL CO INC | Drilling Fluid Waste | 1,140.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 365.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2018 | PENNECO OIL CO INC | Produced Fluid | 33.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | PENNECO OIL CO INC | Produced Fluid | 38.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1890256 | Primary Facility | 2010-05-27 | Routine/Complete Inspection | No Violations Noted | On May 27 2010, I conducted a routine inspection of the above site. Drilling was taking place at the time of inspection. Site ID and E&S plan were posted. Access road was in good condition. Pits appeared to be in good condition. The operator should continue to inspect and maintain E&S controls routinely and after each significant rainfall event. |
1893074 | Primary Facility | 2010-06-10 | Routine/Complete Inspection | No Violations Noted | On June 10th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. A swabbing rig was on site. The frac pit had been constructed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The pits appeared to be in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event. |
1894549 | Primary Facility | 2010-06-28 | Routine/Complete Inspection | No Violations Noted | On June 28th, 2010, I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. Site ID and E&S plan were posted on site. The drilling pits had begun to be filled. No spills, leaks, or accelerated erosion was observed at the time of inspection. The operator should continue to inspect and maintain the E&S controls until the site is fully restored and 70% uniform vegetative cover is established. |
1894767 | Primary Facility | 2010-05-18 | Drilling/Alteration | No Violations Noted | e&s ok no rig yet |
1895083 | Primary Facility | 2010-06-15 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. PIT LEVEL OK.CITE IS CLEAN AND DOZED.THE ACCESS ROAD IS STONED. WELL IS SHUT IN. |
1895121 | Primary Facility | 2010-05-25 | Drilling/Alteration | No Violations Noted | HILL DRILLING@1862 FT. SITE,E&S,AND ACCESS,OK. |
1895126 | Primary Facility | 2010-05-28 | Drilling/Alteration | No Violations Noted | HILL DRILLING AT 3811 FT. SITE,PIT,E&S,AND ACCESS,OK. |
1912804 | Primary Facility | 2010-08-18 | Routine/Complete Inspection | No Violations Noted | On August 18th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. The well was in production. The site was seeded and mulched and growth was coming in well. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Some sediment was beginning to lay against the silt fence. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event. |
1957914 | Primary Facility | 2011-02-08 | Routine/Complete Inspection | No Violations Noted | On February 8th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the well was in production. A wel tag was present. The access road was in good condition. Two tanks were onsite surrounded by an earthen dike. No spills/leaks or accelerated erosion were observed at the time of inspection. |
For data sources see[7]