Well ID: 37-003-22091
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Fawn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149695
Farm/Lease Name: FAWN DEVELOPERS INC 3H
License Status:
Spud Date:
Permit Date: 2009-10-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.648568
Longitude: -79.777621

For data sources see[1][2][3]

Well History

Date Event
2009-10-21 New Permit Application
2009-12-11 Performed Spud Operation
2010-02-02 Drilling Completion
2010-04-18 Perforation
2010-07-08 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 929,218.00 217 0.00 33 0.00 0
2011 PHILLIPS EXPLORATION INC 1,189,158.00 362 0.00 0 0.00 0
2012 XTO ENERGY INC 822,085.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 592,556.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 509,462.00 347 0.00 0 0.00 0
2015 XTO ENERGY INC 425,567.00 355 0.00 0 0.00 0
2016 XTO ENERGY INC 358,589.00 352 0.00 0 0.00 0
2017 XTO ENERGY INC 329,843.70 364 0.00 0 0.00 0
2018 XTO ENERGY INC 308,991.00 352 0.00 0 0.00 0
2019 XTO ENERGY INC 280,551.00 360 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 4,797.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 PHILLIPS EXPLORATION INC Produced Fluid 2,988.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 685.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 315.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 348.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 168.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 188.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Produced Fluid 3,408.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 426.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 504.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2013 XTO ENERGY INC Produced Fluid 174.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 114.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 145.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 201.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 306.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 201.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 1,024.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 872.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 59.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 814.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 596.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC 610.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 865.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 699.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Servicing Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 36.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Other Oil & Gas Wastes 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 202.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 274.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1851498 Primary Facility 2009-12-14 Drilling/Alteration No Violations Noted PHILLIPS 6 SET UP TO DRILL TOP HOLE. MARCELLUS.
1851651 Primary Facility 2009-12-21 Drilling/Alteration No Violations Noted PHILLIPS TOP HOLE. DRILLING AFTER 95/8" CEMENT TIME.
1865527 Primary Facility 2010-01-22 Drilling/Alteration No Violations Noted RECIEVED CALL ABOUT MUD ON THE HIGHWAY. CALLED P.C. AND THEY DID AN EXCELLENT JOB CLEANING UP.
1865546 Primary Facility 2010-02-04 Drilling/Alteration No Violations Noted DRILLING COMPLETE FOR THIS HORIZONTAL MARCELLUS WELL.
1879880 Primary Facility 2010-04-22 Routine/Complete Inspection No Violations Noted On April 22, 2010 I visited this site for a routine inspection. Drilling had been completed and the well was being flared off. A site ID sign and E&S plan were posted on site. The access road was in good condition. The E&S controls were in place according to the plan on site. The pits appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is fully restored.
1882734 Primary Facility 2010-04-05 Drilling/Alteration No Violations Noted PITS ARE FULL OF WATER FROM A HYDRANT. THIS MARCELLUS WELL IS READY TO FRAC.
1894368 Primary Facility 2010-06-23 Routine/Complete Inspection No Violations Noted On June 23, 2010 I visited this site for a routine inspection. Drilling had been completed and work was commencing on the production units. A site ID sign and E&S plan were posted on site. The access road was in good condition. The E&S controls were in place according to the plan on site. The pits appeared to be in good condition. Portions of the silt fence surrounding the impoundments were beginning to become overtaken. These should be addressed immediately. The operator should continue to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored.
1894789 Primary Facility 2010-05-03 Drilling/Alteration No Violations Noted e&s ok, horizontal marcellus in line
1904657 Primary Facility 2010-07-21 Routine/Complete Inspection No Violations Noted On July 21st, 2010 I visited this site for a routine inspection. Drilling had been completed and work was be completed on the production units. A site ID sign and E&S plan were posted on site. The access road was in good condition. The E&S controls were in place according to the plan on site. The pits were emptied. Motorcycle tracks were present on the liner of the pit. Portions of the silt fence surrounding the impoundments were in need of repair. These should be addressed immediately. The operator should continue to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored.
1913793 Primary Facility 2010-09-02 Routine/Complete Inspection No Violations Noted On September 2nd, 2010 I visited this site for a routine inspection. Drilling had been completed. A site ID sign and E&S plan were posted on site. The access road was in good condition. The E&S controls were in place according to the plan on site. The pits were emptied. Repairs had been made to the silt fence that were noted in the 7/21/10 inspection. The operator should continue to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored.
1930590 Primary Facility 2010-11-10 Drilling/Alteration No Violations Noted THIS MARCELLUS WELL IS PROTECTED BY A PIPE FENCE. HEATERS AND TANKS ARE FENCED SEPERATELY. PITS ARE GONE AND RESTORATION IS IN PROGRESS.
1940451 Primary Facility 2010-12-28 Routine/Complete Inspection No Violations Noted On December 28th, 2010 I visited this site for a routine inspection. Drilling had been completed. The well was in production. A site ID sign and E&S plan were posted on site. The access road was in good condition. The E&S controls were in place according to the plan on site. The pits were closed and the site was graded. The area around the well head was being rocked. The operator should continue to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored.
1993488 Primary Facility 2011-07-26 Routine/Complete Inspection No Violations Noted On July 26th, 2011 I visited this site for a routine inspection. Drilling had been completed. The well was in production. A well tag was present. The access road was in good condition. The site was graded, seeded , and mulched. Growth was sparse in some areas however. 6 tanks were surrounded by a dike. No spills, leaks, or accelerated erosion were observed during the inspection.
2102475 Primary Facility 2012-09-25 Routine/Complete Inspection No Violations Noted John Ley , WQS, SWRO was on site to conduct a routine inspection. There was a security gate located at the entrance to the access road and fencing surrounding the well pad. At the time of the inspection, the well sign and inspections copies were on site. Hillsides were stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site.
2728899 Primary Facility 2018-05-11 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of Inspection, both wells drilled and appear equipped for production.