Well ID: 37-003-22115 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.485611,"lon":-79.713417,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: BROOKE 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-04-02 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.485611 | |
Longitude: -79.713417 |
Date | Event |
---|---|
2010-04-02 | New Permit Application |
2010-04-20 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 4,136.00 | 214 | 198.60 | 214 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 5,875.00 | 365 | 250.40 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 4,151.00 | 366 | 124.73 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 1,915.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 2,316.00 | 365 | 102.72 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 3,063.21 | 365 | 190.73 | 61 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 3,018.10 | 366 | 103.45 | 30 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 2,689.00 | 365 | 104.21 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 1,098.79 | 304 | 81.46 | 31 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 2,490.34 | 365 | 1,066.43 | 31 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Drilling Fluid Waste | 3,351.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 16.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 13.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | PENNECO OIL CO INC | Produced Fluid | 27.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | PENNECO OIL CO INC | Produced Fluid | 26.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | PENNECO OIL CO INC | Produced Fluid | 33.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1877589 | Primary Facility | 2010-04-15 | Routine/Complete Inspection | No Violations Noted | On April 15th, 2010 I conducted a routine inspection of the above site. Site construction was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. |
1882817 | Primary Facility | 2010-04-20 | Drilling/Alteration | No Violations Noted | DAVE HILL RIG SET UP AND DRILLING @ 85'. SITE AND PIT OK. |
1882864 | Primary Facility | 2010-04-19 | Drilling/Alteration | No Violations Noted | SITE CONSTRUCTED. PIT IS NOT LINED. E&S CONTROLS IN PLACE. |
1883330 | Primary Facility | 2010-04-30 | Routine/Complete Inspection | No Violations Noted | On April 30th, 2010 I conducted a routine inspection of the above site. Drilling had been completed. The frac pit had been constructed and was being filled. The drilling pits appeared to be in good codition. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached. |
1884488 | Primary Facility | 2010-04-28 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. SITE, AND E&S, OK. |
1884497 | Primary Facility | 2010-04-28 | Complaint Inspection | No Violations Noted | COMPLAINT #271010 FOR ODORS. NO ODORS AT THIS SITE. |
1884512 | Primary Facility | 2010-04-30 | Drilling/Alteration | No Violations Noted | |
1884571 | Primary Facility | 2010-04-22 | Drilling/Alteration | No Violations Noted | DRILLING AT 1859'. SITE, PIT, E&S, AND ACCESS, OK. |
1894964 | Primary Facility | 2010-05-13 | Drilling/Alteration | No Violations Noted | WELL FRACED, RODS AND TUBING IN.SITE NOT RESTORED. |
1895044 | Primary Facility | 2010-06-15 | Drilling/Alteration | No Violations Noted | THE DRILLING IS COMPLETE. THERE IS NO JACK BUT TUBING AND RODS ARE IN.OIL TANK IS SET AND DIKED.SITE IS GRADED BUT NOT SEEDED |
1904610 | Primary Facility | 2010-07-09 | Routine/Complete Inspection | No Violations Noted | On July 9th, 2010 I conducted a routine inspection of the above site. Drilling had been completed and the well was in production. The pits have been closed and filled. The tanks were in place and a dike constructed around them. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The site was graded, seeded, and mulched. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached. |
1912629 | Primary Facility | 2010-08-02 | Routine/Complete Inspection | No Violations Noted | WELL COMPLETE. JACK IS HOOKED UP. SITE IS RESTORED. |
1927314 | Primary Facility | 2010-10-05 | Routine/Complete Inspection | No Violations Noted | OIL AND GAS WELL. JACK IS OPERATING. SITE RESTORED. TANK WITH A VAPOR FILTER. ALL EQUIPTMENT FENCED. |
1947177 | Primary Facility | 2011-01-07 | Routine/Complete Inspection | No Violations Noted | OIL & GAS WELL. TANKS WITH VAPOR FILTERS. EQUIPTMENT FENCED AND LOCKED. SITE AND ACCESS STONED. |
2054286 | Primary Facility | 2012-03-13 | Routine/Complete Inspection | No Violations Noted | THIS OIL AND GAS WELL IS IN GOOD CONDITION. |
For data sources see[7]