Well ID: 37-003-22467 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.248675,"lon":-79.819531,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Elizabeth Township | |
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | |
Well Pad ID: 154488 | |
Farm/Lease Name: APOLLO B 5M | |
License Status: | |
Spud Date: | |
Permit Date: 2017-09-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.248675 | |
Longitude: -79.819531 |
Date | Event |
---|---|
2017-09-27 | New Permit Application |
2018-09-18 | Permit Renewal Application |
2019-01-04 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 1,301,160.00 | 86 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 245.48 Tons | LANDFILL | 06-08438 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Synthetic Liner Materials | 27.70 Tons | LANDFILL | 100663 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Soil Contaminated by Oil & Gas Related Spills | 14.16 Tons | LANDFILL | 100663 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drilling Fluid Waste | 2,130.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 2,076.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 607.42 Tons | LANDFILL | 100663 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Soil Contaminated by Oil & Gas Related Spills | 629.36 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 6,547.89 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Soil Contaminated by Oil | 14.16 Tons | LANDFILL | 100663 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 218.91 Tons | LANDFILL | 100172 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 3,494.80 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 23,844.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 460.00 Bbl | REUSE (AT WELL PAD) | |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Soil Contaminated by Oil | 629.36 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 15.55 Tons | LANDFILL | 100594 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 905.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2774197 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | Site under construction well not drilled. |
2777286 | Primary Facility | 2018-09-20 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. |
2821661 | Primary Facility | 2019-01-03 | Preoperation Inspection | No Violations Noted | Pre-Operation inspection related to a spud notification submitted on 1/2/2018. The well was planned to be stud on 1/4/2018. The PPC plan, ER plan and ESCGP mapping was on site. The Act 9 site ID sign was installed. At the time of inspection the Operator was repairing a small slough along the right side of the access road. The perimeters E&S BMPs and PCSM BMPs were installed and appeared to be functioning as designed. The disturbed areas were temporary stabilized with vegetative matting and mulch. Department recommends that the Operator continue to monitor the site weekly and after precipitation events. |
2822635 | Primary Facility | 2019-01-07 | Drilling/Alteration | No Violations Noted | An auger rig has drilled a 30" hole and set 40' of 28" conductor pipe. |
2836188 | Primary Facility | 2019-01-28 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, well 5M has been spudded, not yet completed. Wells 1M and 3M have also been spudded, not yet completed. The rig is currently not on-site. |
2849022 | Primary Facility | 2019-02-28 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, well 5M has been spudded, not yet completed. Wells 1M and 3M have also been spudded, not yet completed. The rig is currently not on-site. |
2855127 | Primary Facility | 2019-03-11 | Routine/Partial Inspection | No Violations Noted | At the time of this inspection, well 5M has been spudded, not yet completed. Wells 1M and 3M have also been spudded, not yet completed. The rig is currently not on-site. |
For data sources see[7]