If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-005-28554 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.940162,"lon":-79.648941,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Armstrong | |
| Municipality: Sugarcreek Township | |
| Operator Name: DANNIC ENERGY CORP | |
| Well Pad ID: | |
| Farm/Lease Name: MCELROY 4 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2006-02-03 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.940162 | |
| Longitude: -79.648941 |
| Date | Event |
|---|---|
| 2006-02-03 | New Permit Application |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2004 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2005 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2006 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2007 | DANNIC ENERGY CORP | 5,150.00 | 244 | 0.00 | 0 | 0.00 | 0 |
| 2008 | DANNIC ENERGY CORP | 6,127.28 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2009 | DANNIC ENERGY CORP | 5,146.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | DANNIC ENERGY CORP | 4,848.87 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | DANNIC ENERGY CORP | 3,331.00 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2012 | DANNIC ENERGY CORP | 3,738.29 | 305 | 0.00 | 0 | 0.00 | 0 |
| 2013 | DANNIC ENERGY CORP | 3,509.29 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2014 | DANNIC ENERGY CORP | 3,293.00 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2015 | DANNIC ENERGY CORP | 3,119.06 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | DANNIC ENERGY CORP | 3,645.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | DANNIC ENERGY CORP | 2,987.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | DANNIC ENERGY CORP | 2,554.03 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | DANNIC ENERGY CORP | 2,179.75 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2008 | DANNIC ENERGY CORP | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
| 2011 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
| 2012 | DANNIC ENERGY CORP | Produced Fluid | 30.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
| 2014 | DANNIC ENERGY CORP | Produced Fluid | 50.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2444344 | Primary Facility | 2016-01-28 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus shut. Well head casing-meter set-equipment-100 bbl tank ok. |
| 2798565 | Primary Facility | 2018-11-06 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is shut. The well head casing, piping, equipment and 100 bbl plastic fluid collection tank look ok. |
For data sources see[7]