If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-005-28906 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.966019,"lon":-79.514061,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Armstrong | |
| Municipality: Madison Township | |
| Operator Name: RIDGEVIEW GAS & OIL INC | |
| Well Pad ID: | |
| Farm/Lease Name: PATTON 1 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2006-09-01 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.966019 | |
| Longitude: -79.514061 |
| Date | Event |
|---|---|
| 2006-09-01 | New Permit Application |
| 2006-10-13 | Performed Spud Operation |
| 2006-10-19 | Drilling Completion |
| 2006-12-26 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2006 | RIDGEVIEW GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2007 | RIDGEVIEW GAS CO | 19.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2008 | RIDGEVIEW GAS & OIL INC | 18.00 | 120 | 0.00 | 0 | 0.00 | 0 |
| 2009 | RIDGEVIEW GAS & OIL INC | 4.00 | 120 | 0.00 | 0 | 0.00 | 0 |
| 2010 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | RIDGEVIEW GAS & OIL INC | 11.00 | 123 | 0.00 | 0 | 0.00 | 0 |
| 2012 | RIDGEVIEW GAS & OIL INC | 5.00 | 31 | 0.00 | 0 | 0.00 | 0 |
| 2013 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2018 | RIDGEVIEW GAS & OIL INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2012 | RIDGEVIEW GAS & OIL INC | Produced Fluid | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1578322 | Primary Facility | 2006-10-19 | Drilling/Alteration | No Violations Noted | WELL SPUD/PIT OK/E&S OK |
| 1646990 | Primary Facility | 2007-08-16 | Routine/Complete Inspection | No Violations Noted | TAG IS IN POOR CONDITION. NO TANK ONSITE. E&S OK. |
| 2139589 | Primary Facility | 2013-02-12 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well was not equipped for production. Site had been partially regraded, topsoil was still piled above the site. The Department recommends that the operator temporarily stabilize the site in accordance with 25 PA Code Chapter 102.22(b). There was no evidence observed of accelerated erosion or sedimentation at the time of the inspection. The operator should monitor the access road to insure that any sediment conveyed on the road due to the apparent clay nature of the subbase soil is not transpoorted onto the paved road via runoff. |
| 2182692 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | Well plugging activities appeared to have been completed. Site and access road had been regraded, however they had not been temporarily stabilized. At this the Department recommends that the operator temporarily stabilize the site with seed and mulch as soon as possible to insure the vegetation takes hold during the 2013 growing season. There was no observered accelerated or sedimentation in relation to the regraded site or access road. |
For data sources see[7]