If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-28959 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.828975,"lon":-79.474801,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Rayburn Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHRECENGOST 7 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2006-12-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.828975 | |
Longitude: -79.474801 |
Date | Event |
---|---|
2006-12-12 | New Permit Application |
2007-01-16 | Performed Spud Operation |
2007-01-24 | Drilling Completion |
2007-02-02 | Perforation |
2009-03-05 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | POWER GAS MKT & TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | POWER GAS MKT & TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | POWER GAS MKT & TRANS INC | 2130.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | EXCO RESOURCES PA INC | 970.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | EXCO RESOURCES PA INC | 1,060.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 394.00 | 215 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 431.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 423.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 195.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 274.31 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 89.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 192.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 51.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 45.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 45 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1598957 | Primary Facility | 2007-01-26 | Drilling/Alteration | No Violations Noted | E&S OK. |
2556600 | Primary Facility | 2017-01-30 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus open. Well head casing-equipment-grounded 100 bbl plastic tank looked ok. |
2673297 | Primary Facility | 2017-12-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
2836825 | Primary Facility | 2019-02-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was equipped for production. The valves were open to a separator. The integrity appeared to be in good condition, with only some chipped paint and no leaks being observed. The well was properly labeled. A Barton chart was last changed on 1/15. A 100 bbl poly tank was also being used. Production was reported in 2017 as 192 mcf for 365 days. |
For data sources see[7]