If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-29764 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.874487,"lon":-79.50977,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: | |
Farm/Lease Name: SAGC 1-67 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-03-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.874487 | |
Longitude: -79.509770 |
Date | Event |
---|---|
2008-03-27 | New Permit Application |
2008-05-13 | Performed Spud Operation |
2008-05-19 | Drilling Completion |
2009-06-17 | Perforation |
2009-11-02 | NEWLY DRILLED |
2010-06-30 | REWORKED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | SNYDER BROS INC | 2398.00 | 96 | 0.00 | 0 | 0.00 | 0 |
2010 | SNYDER BROS INC | 6,192.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 4,061.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 3,851.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 3,141.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 2,894.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 2,633.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 2,642.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,713.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,151.00 | 311 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,336.00 | 324 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | SNYDER BROS INC | Brine | 65.00 Bbl | Road Spreading | |
2010 | SNYDER BROS INC | Produced Fluid | 70.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SNYDER BROS INC | Produced Fluid | 47 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | SNYDER BROS INC | Produced Fluid | 47.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | SNYDER BROS INC | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | SNYDER BROS INC | Produced Fluid | 40 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2019 | SNYDER BROS INC | Produced Fluid | 35.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1709615 | Primary Facility | 2008-05-29 | Routine/Complete Inspection | No Violations Noted | well spud/E&S ok/pit ok |
1709743 | Primary Facility | 2008-05-16 | Drilling/Alteration | No Violations Noted | pit e/s ok |
1803996 | Primary Facility | 2009-06-08 | Routine/Complete Inspection | No Violations Noted | Drilling was completed on 05/19/08. Well was not equipped for production at the time of the inspection. Below grade pit was located onsite and had more than the two feet of required freeboard. Observed that the filter fabric & hay bale BMP should be restablished to insure that it remains functional. In addition the diversion ditch located on the upper side of the well-site should be stabilized with a BMP )i.e. rock, erosion control matting) so as to minimize sediment generation & transport off-site. |
2586565 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. A third party had dumped a small amount of construction waste on the well-site. |
For data sources see[7]