If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-29999 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.673706,"lon":-79.585593,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: | |
Farm/Lease Name: KENNETH & MICHELE COVEY 1-15 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-10-20 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.673706 | |
Longitude: -79.585593 |
Date | Event |
---|---|
2008-10-20 | New Permit Application |
2009-10-09 | Permit Renewal Application |
2009-12-24 | Performed Spud Operation |
2009-12-30 | Drilling Completion |
2010-04-30 | Perforation |
2011-08-30 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MDS ENERGY LTD | 4,522.00 | 130 | 0.00 | 0 | 0.00 | 0 |
2011 | MDS ENERGY LTD | 10,105.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 6,876.00 | 194 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 6,731.00 | 256 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 6,663.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 6,768.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 5,360.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 4,923.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 4,506.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 4,493.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | MDS ENERGY LTD | Fracing Fluid Waste | 1,160.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | MDS ENERGY LTD | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 76.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 76 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1852458 | Primary Facility | 2009-12-29 | Routine/Complete Inspection | No Violations Noted | Drill rig was located onsite at the time of the inspection. Below grade pit located onsite and had more than the required two feet of freeboard. E&S plan located onsite and erosion control measures appeared to have been installed properly. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. The operator should continue to monitor the erosion controls to insure they continue to function properly until well development is completed and final restoration activities are completed. |
1875072 | Primary Facility | 2010-04-06 | Routine/Complete Inspection | Violation(s) Noted | |
1875274 | Primary Facility | 2010-04-07 | Compliance Evaluation | No Violations Noted | As per phone conversation with operator representative Randy Morris WQS Higgins found that fluid had been removed from the pit to restore the two feet of lined freeboard. In addition Mr. Morris indicated that additional loads of water will be hauled to a treatment facility to insure compliance with 78.56 should a precipitation event occur. |
2143274 | Primary Facility | 2013-02-27 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank and pumpjack apparatus located onsite and they appeared to be in sound condition. No accelerated erosion or sedimentation was observed in relation to the site or access road. The vegetative cover met the 70% uniform coverage criteria. The Department recommends that the operator monitor the access road to insure erosion issues do not develop and for passability. |
2644527 | Primary Facility | 2017-10-06 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that the access road did require routine maintenance. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1875072 | 584594 | 04/06/2010 | 2010-04-06 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
584594 | 256603 | NOV - Notice of Violation | Comply/Closed | 2010-04-07 | |||
584594 | 266585 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-01-06 | 2011-01-06 | $26,000.00 | $26,000.00 |
For data sources see[7]