If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30263 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.830552,"lon":-79.571161,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: | |
Farm/Lease Name: STOREY-KENNEDY UNIT 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-02-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.830552 | |
Longitude: -79.571161 |
Date | Event |
---|---|
2009-02-27 | New Permit Application |
2009-05-27 | Performed Spud Operation |
2009-06-02 | Drilling Completion |
2009-10-07 | Perforation |
2009-10-30 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 6,025.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 6,039.00 | 300 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 5,323.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 5,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 2,570.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 4,400.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 3,836.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 3,946.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 2,954.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 3,106.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | SNYDER BROS INC | Produced Fluid | 30.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | ROAD SPREADING | |
2019 | SNYDER BROS INC | Produced Fluid | 32.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1767160 | Primary Facility | 2009-01-27 | Routine/Complete Inspection | No Violations Noted | Well staked, site not constructed at the time of the inspection. After phone conversation and e-mail correspondence with the operator representatives, the E&S plan was revised to address the following deficienies: 1) Depth to seasonal groundwater table makes the use of land-farming, encaspulation, and below-grade pits not possible. 2) The culverts located on the access road for existing stream flows require BMP's so as to isolate them from the disturbed acreage. 3) The entire access road and site should be rocked so as to minimize the amount of sediment generated during well development. |
1808525 | Primary Facility | 2009-06-19 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed at the time of the inspection. Well was not equipped for production. Below grade pit located onsite and had more than the two feet of required freeboard. E&S plan implemented as outlined in the approved E&S plan. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. The operator should continue to monitor the site for accelerated erosion & sedimentation until well development and final restoration activities are completed. |
1886550 | Primary Facility | 2009-11-02 | Routine/Complete Inspection | No Violations Noted | Drilling completed. Site not restored yet. Tag located. No off-site erosion & sedimentation. Pit is still on-site and is in sound condition. |
1886561 | Primary Facility | 2010-04-07 | Routine/Complete Inspection | No Violations Noted | Drilling completed. Site not fully restored yet. Tag located. No off-site erosion & sedimentation. Pit is still on-site and is in sound condition. Roll-off box on-site. |
1927311 | Primary Facility | 2010-08-24 | Routine/Complete Inspection | No Violations Noted | Drilling completed. Well is equipped for production. Tag located. Brine tank appears to be in sound condition. Vegetation is well established. No off-site transportation of erosion & sedimentation. At this time, the site appears to be restored. |
For data sources see[7]