X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30402

Well Details

Well ID: 37-005-30402
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: PAULENE C BRICE 4
License Status:
Spud Date:
Permit Date: 2009-07-06
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.855720
Longitude: -79.253337

For data sources see[1][2][3]

Well History

Date Event
2009-07-06 New Permit Application
2010-03-25 Performed Spud Operation
2010-03-30 Drilling Completion
2010-04-07 Perforation
2010-07-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 3,250.00 246 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 6,376.00 345 0.00 0 0.00 0
2012 XTO ENERGY INC 7,593.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 6,611.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 6,010.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 4,632.21 365 0.00 0 0.00 0
2016 XTO ENERGY INC 4,482.20 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,926.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 4,258.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 21.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 3.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 3.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2012 XTO ENERGY INC Produced Fluid 76.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2013 XTO ENERGY INC Produced Fluid 55 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 XTO ENERGY INC Produced Fluid 55.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 44.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 44 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1874526 Primary Facility 2010-04-02 Routine/Complete Inspection Violation(s) Noted Drilling appeared to have been completed at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Noted that the silt fence implemented as an erosion control below the site had been compromised. Specifically the fence had been undercut from the runoff flow below the well pad closest to where the access road enters the site. This resulted in an off-site transport of sediment.to an unnamed tributary of the North Branch of South Fork Pine Creek. Additionally the runoff/spring flow form the opposite side of the site had overtopped the silt fence and hay bales implemented as reinforcement resulting in an off-site transport of sediment to the same UNT. For this site a collection ditch and subsequent sediment trap would have been a more effective erosion control BMP.
1877332 Primary Facility 2010-04-14 Routine/Complete Inspection No Violations Noted Drilling was completed at the time of the inspection. Noted that all of the issues noted and cited as violations in the 04/02/10 inspection had not been addressed.
1884108 Primary Facility 2010-05-13 Compliance Evaluation No Violations Noted Drilling appeared to have been completed at the time of the inspection. Met onsite with operator representative Tom Baun. Well was equipped for & in production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded, however it had no as of yet been seeded and mulched. Observed that the erosion ditch that had been formed had been backfilled in, and the runoff flows had been eliminated. The silt fencing had been restablished and no accelerated erosion & sedimentation issues were observed in relation to the access road or well-site. Mr. Baun stated that the site would be seeded and mulched within the next few weeks. The operator should continue to monitor the site for accelerated erosion & sedimentation and to insure that the 70% uniform coverage criteria is achieved.
2615803 Primary Facility 2017-07-17 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. The access road did require routine maintenance.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1874526 584436 04/02/2010 2010-04-02 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
584436 256538 NOV - Notice of Violation Comply/Closed 2010-05-14 2010-05-14

For data sources see[7]

References