If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30445 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.827076,"lon":-79.26622,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Cowanshannock Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: C I OHARROW 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-04 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.827076 | |
Longitude: -79.266220 |
Date | Event |
---|---|
2009-09-04 | New Permit Application |
2010-07-06 | Performed Spud Operation |
2010-07-13 | Drilling Completion |
2010-07-21 | Perforation |
2010-09-28 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 8,226.00 | 129 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 14,708.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 10,536.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 8,393.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 6,426.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 5,875.40 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 5,196.80 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 3,622.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 5,087.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 2,928.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1818960 | Primary Facility | 2009-08-10 | Routine/Complete Inspection | No Violations Noted | Site was staked, not constructed at the time of the inspection. The E&S plan as compiled should effectively minimize accelerated erosion & sedimentation provided the plan is implemented & maintained properly. |
1895723 | Primary Facility | 2010-07-02 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not been commenced at the time of the inspection. Below grade pit located onsite. Pit was properly lined. Noted that drains had been implemented to carry any water from a ditch at the bottom of the cutslope to carry spring flow or runoff below the fill slope. Ideally this water should have been carried via the drains to outside of the disturbed acreage of the well site. As constructed the drains should be effective, however they should be monitored and if as constructed they are not functioning properly the piping should be extended beyond the disturbed acreage and outletted either with appropriate BMP's or to a stable area. |
1897679 | Primary Facility | 2010-07-13 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pits located onsite had more than the required two feet of lined freeboard. Tool pusher onsite indicated that runoff flow was compromising the auxillary pit. Specifically the runoff is flowing to the cut side and progressing underneath the pit liner. The Department recommends that the operator not utilize this pit any further and remove the liner. Should an additional auxillary pit be required an above grade pit should be utilized. All erosion controls had functioned properly minimizing erosion & sedimentation. The operator should continue to monitor the site to insure all erosion controls continue to function properly |
1898211 | Primary Facility | 2010-07-07 | Drilling/Alteration | No Violations Noted | rigging-up/E&S ok/ID&pit ok |
1953785 | Primary Facility | 2011-03-02 | Routine/Complete Inspection | No Violations Noted | Met onsite with operator representative Tom Baun to disuss additional measures that are required to address the runoff flow conveyed by culvert under the access road and the runoff flow from the backside of the well pad downslope. WQS Higgins and Mr. Baun agreed that a small sediment trap and rock stabilized ditch on botht he inlet and outlet side of the culvert would be required for permanent stabilization. In addition a erosion control blanket lined (lined until the vegetation takes hold) swale is to be implemented to convey the runoff collected on the backside of the site to the downslope side. WQS Higgins and Mr. Baun agreed this work should be completed by the end of March 2011. |
1963441 | Primary Facility | 2011-04-04 | Routine/Complete Inspection | No Violations Noted | Inspection performed as a follow-up to the 03/02/11 inspection and site meeting with operator representative Tom Baun. The permanent erosion control BMP work that was discussed and agreed upon has not been completed or commenced as of this inspection. Observed no additional erosion and sedimentation issues have developed since the 03/02/11 inspection and meeting. Contacted operator representative Tom Baun who indicated that as soon as weather permits the work will be completed. |
1995777 | Primary Facility | 2011-08-12 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed 07/13/10. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well-site had been properly restored and the discussed additional erosion controls from inspections in March and April 2011 had been implemented. No accelerated erosion or sedimentation was observed in relation to the access road or well-site |
2099463 | Primary Facility | 2012-09-12 | Complaint Inspection | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
For data sources see[6]