Well Details

Well ID: 37-005-30460
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name: NATURAL ENERGY DEV CORP
Well Pad ID:
Farm/Lease Name: G ALCORN 4
License Status:
Spud Date:
Permit Date: 2009-09-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.914664
Longitude: -79.311869

For data sources see[1][2][3]

Well History

Date Event
2009-09-22 New Permit Application
2009-11-03 Performed Spud Operation
2009-11-06 Drilling Completion
2009-11-12 Perforation
2010-04-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 NATURAL ENERGY DEV CORP 0.00 0 0.00 0 0.00 0
2010 NATURAL ENERGY DEV CORP 13,175.00 365 0.00 0 0.00 0
2011 NATURAL ENERGY DEV CORP 9,820.00 365 0.00 0 0.00 0
2012 NATURAL ENERGY DEV CORP 6,434.00 365 0.00 0 0.00 0
2013 NATURAL ENERGY DEV CORP 4,490.00 365 0.00 0 0.00 0
2014 NATURAL ENERGY DEV CORP 3,251.00 330 0.00 0 0.00 0
2015 NATURAL ENERGY DEV CORP 3,011.00 360 0.00 0 0.00 0
2016 NATURAL ENERGY DEV CORP 2,971.00 330 0.00 0 0.00 0
2017 NATURAL ENERGY DEV CORP 3,516.00 360 0.00 0 0.00 0
2018 NATURAL ENERGY DEV CORP 3,121.00 330 0.00 0 0.00 0
2019 JMM RESOURCES LLC 3,507.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1842643 Primary Facility 2009-11-04 Drilling/Alteration No Violations Noted drilling in process/E&S advice/ID& pit ok
1843348 Primary Facility 2009-11-06 Routine/Complete Inspection No Violations Noted Drilling was commenced on or about 11/03/09. Met onsite with operator representative David Smith to review the E&S plan, specifically for the access road. Noted numerous concerns with the steepness of the access road and the proximity of the road to a nearby the stream and the potential for accelerated erosion & sedimentation. Mr. Smith stated that the well will is to be fraced within the next week, and that as soon as that process was completed the site would be restored and a final layer of durable clean stone would be added to the access road. This quick turnaround and the current conditions alleviated the present concerns. WQS Higgins recommended that the operator insure that all erosion control BMP's on the access road be kept in functioning condition should the weather change. The broad based dips should be kept graded and the roadside ditches and subsequent rock outlets be maintained, and any disturbed areas that will not be affected by well stimulation activities should be mulched as soon as possible.
1878471 Primary Facility 2010-04-21 Routine/Complete Inspection No Violations Noted Drilling completed, well equipped for production. Site regraded, seed, & mulched, but vegetation had not as of yet begun to grow.

For data sources see[6]