{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.885989,"lon":-79.269467,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Wayne Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 146697 | |
Farm/Lease Name: JOE J KUHNS ETUX 1M-75 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-10-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.885989 | |
Longitude: -79.269467 |
Date | Event |
---|---|
2009-10-30 | New Permit Application |
2010-02-25 | Performed Spud Operation |
2010-03-02 | Drilling Completion |
2011-03-01 | New Permit Application |
2011-07-20 | Drilling Completion |
2011-12-16 | Perforation |
2012-10-26 | DRILLED DEEPER |
2012-12-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MDS ENERGY LTD | 1.00 | 120 | 0.00 | 0 | 0.00 | 0 |
2011 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 9,317.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 6,088.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 4,270.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 1,379.00 | 234 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 876.00 | 319 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 748.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 314.00 | 265 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 436.00 | 263 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | MDS ENERGY LTD | Drilling Fluid Waste | 580.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 14,485.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | MDS ENERGY LTD | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012 | MDS ENERGY LTD | Produced Fluid | 580.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | MDS ENERGY LTD | Produced Fluid | 216.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | MDS ENERGY LTD | Produced Fluid | 3,707.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2012 | MDS ENERGY LTD | Produced Fluid | 255.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | MDS ENERGY LTD | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | MDS ENERGY LTD | Produced Fluid | 556.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 925.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2012 | MDS ENERGY LTD | Produced Fluid | 270.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 453.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2013 | MDS ENERGY LTD | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | MDS ENERGY LTD | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2013 | MDS ENERGY LTD | Produced Fluid | 166.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | MDS ENERGY LTD | Produced Fluid | 333.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | MDS ENERGY LTD | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | MDS ENERGY LTD | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | MDS ENERGY LTD | Produced Fluid | 420.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | MDS ENERGY LTD | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 60.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1867489 | Primary Facility | 2010-03-04 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation on the access road or well-site. |
1871258 | Primary Facility | 2010-03-03 | Routine/Complete Inspection | No Violations Noted | drilling complete - not equipped/E&S ok/ID&pit ok |
1988169 | Primary Facility | 2011-07-15 | Drilling/Alteration | No Violations Noted | rigging up |
1989934 | Primary Facility | 2011-07-15 | Routine/Complete Inspection | No Violations Noted | Drill rig onsite, drilling had not as of yet commenced. Drilling was to deepen an existing well to reach the Marcellus formation. Drill pit and frac impoundment had been constructed properly and were lined. Both the pit and the impoundment contained minimal fluids. The E&S plan rendering as compiled by Botsford Surveying had been significantly altered. The silt socks and the rock lined ditches had not been implemented. An additional soil stockpile had been implmented below the frac impoundment and created a sediment trap between the soil stockpile and the frac impoundment. The operator should monitor and maintain the installed erosion controls as neccesary to insure the minimization of accelerated erosion & sedimentation. |
1991841 | Primary Facility | 2011-07-21 | Drilling/Alteration | No Violations Noted | drilling complete & equipment removed |
1995776 | Primary Facility | 2011-08-12 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Drill pit located onsite and it contained cuttings and fluid. Frac impoundment located onsite. Both the drill pit and frac impoundment had more than the required two feet of lined freeboard. No accelerated erosion or sedimentation was observed in relation to the site or access road. |
2076667 | Primary Facility | 2012-06-15 | Site Restoration | No Violations Noted | Drilling was completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. It was noted that the site was located adjacent to cultivated crop fields. Site had been effectively restored and there was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2361286 | Primary Facility | 2015-04-14 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimenation in relation to the access road and it was noted that the wll was surrounded by cultivated crop fields from 2014. |
2650545 | Primary Facility | 2017-10-23 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted the well was located adjacent rotational agricultural crop fields. |
2689055 | Primary Facility | 2018-01-24 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
2828581 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On 1/17/19 at 1210 hrs., I conducted a routine inspection of MDS Energy Development, LLC's Joe J Kuhns etux 1A-75 well (API 005-30485) in Wayne Twp., Armstrong Co. The well pad is restored and permanently stabilized. The well is equipped for production. A site ID sign is present at the entrance to the well pad. A well tag is affixed to the well head. There are no violations noted for this inspection. |