If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30581 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.831367,"lon":-79.401575,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Valley Township | |
Operator Name: WGM GAS CO INC | |
Well Pad ID: | |
Farm/Lease Name: BUREAU 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-24 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.831367 | |
Longitude: -79.401575 |
Date | Event |
---|---|
2010-03-24 | New Permit Application |
2010-12-14 | Performed Spud Operation |
2010-12-17 | Drilling Completion |
2010-12-29 | Perforation |
2011-07-25 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | WGM GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | WGM GAS CO INC | 997.00 | 60 | 0.00 | 0 | 0.00 | 0 |
2012 | WGM GAS CO INC | 3,610.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | WGM GAS CO INC | 1,960.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | WGM GAS CO INC | 1,494.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | WGM GAS CO INC | 1,248.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | WGM GAS CO INC | 599.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | WGM GAS CO INC | 1,673.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | WGM GAS CO INC | 858.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | WGM GAS CO INC | 1,619.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | WGM GAS CO INC | Drilling Fluid Waste | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1934024 | Primary Facility | 2010-12-14 | Routine/Complete Inspection | No Violations Noted | Drill rig onsite and drilling appeared to be about to commence at the time of the inspection. Below grade pit had been constructed properly but had not as of yet been lined. E&S controls implemented as outlined in the E&S plan. Access road had been heavily rocked to maintain its stability due to its short distance and proximity to SR 1028. Operator should continue to monitor the site and erosion controls to insure their continued functionality until well development activities are completed. |
1940339 | Primary Facility | 2011-01-03 | Complaint Inspection | No Violations Noted | nspection of well site was in response to a water supply complaint of a contaminated spring (Complaint Id#276486). Well was frac'ed during the last week of December. Well site ID and E/S plan were in place. Site was being regraded at time of inspection. Cuttings' pit was encpsulated. Frac pit was reported to be removed along with contents. Silt fence was stressed at the far corner of site but there was no offsite erosion visible. |
1944930 | Primary Facility | 2011-01-25 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed at the time of the inspection. Drill pit that had been located onsite had been regraded. All erosion controls appeared to be intact. Operator should continue to monitor these erosion controls and access road until well development and site reclamation activities are completed. |
1961080 | Primary Facility | 2011-03-23 | Routine/Complete Inspection | No Violations Noted | Inspection was in conjunction with water supply sampling due to contamination event during the last week of December. |
2083652 | Primary Facility | 2012-07-17 | Site Restoration | No Violations Noted | Drilling was completed on 12/17/10. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well-site had been regraded. It was noted that the well was located amidst cultivated agriculture fields. |
2270679 | Primary Facility | 2014-05-14 | Routine/Complete Inspection | No Violations Noted | Producing gas. Tag, tank, e&s ok. |
2379678 | Primary Facility | 2015-06-17 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that a cultivated corn field was located immediately upgradient from the well. |
For data sources see[7]