X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30597

Well Details

Well ID: 37-005-30597
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Cowanshannock Township
Operator Name:
Well Pad ID:
Farm/Lease Name: SAMUEL GOLDSTROHM 1
License Status:
Spud Date:
Permit Date: 2010-05-03
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.805617
Longitude: -79.264556

For data sources see[1][2][3]

Well History

Date Event
2010-05-03 New Permit Application
2010-08-02 Performed Spud Operation
2010-08-09 Drilling Completion
2010-08-23 Perforation
2010-12-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ALCOVE INVESTMENTS 923.00 90 0.00 0 0.00 0
2011 ALCOVE INVESTMENTS 9,553.00 365 0.00 0 0.00 0
2012 ALCOVE INVESTMENTS 7,142.00 365 0.00 0 0.00 0
2013 ALCOVE INVESTMENTS 5,397.00 365 0.00 0 0.00 0
2014 ALCOVE INVESTMENTS 4,979.00 365 0.00 0 0.00 0
2015 ALCOVE INVESTMENTS 3,694.00 365 0.00 0 0.00 0
2016 ALCOVE INVESTMENTS 3,784.00 365 0.00 0 0.00 0
2017 ALCOVE INVESTMENTS 3,083.00 365 0.00 0 0.00 0
2018 ALCOVE INVESTMENTS 3,199.00 365 0.00 0 0.00 0
2019 ALCOVE INVESTMENTS 2,859.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ALCOVE INVESTMENTS Produced Fluid 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1902365 Primary Facility 2010-08-02 Routine/Complete Inspection No Violations Noted Drill rig onsite. Drilling had not as of yet commenced. Pit was not lined, and recommended to the drill crew onsite to have the pit lined with hay and/or straw prior to placing the liner in the pit. E&S plan could not be reviewed due to the plan tube being too long and vertical. No accelerated erosion & sedimentation in relation to the access road or well-site. Silt fencing had been installed properly. Noted that the rock construction entrance should be expanded on the access road.
1908238 Primary Facility 2010-08-05 Drilling/Alteration No Violations Noted drilling @ 2880ft
1981756 Primary Facility 2011-06-20 Site Restoration No Violations Noted Drilling was completed on 08/09/10. Well appeared to be equipped for production. Brine tank located onsite and appeared to be equipped for production. Observed no accelerated erosion or sedimentation in relation to the access road or well-site. Noted that there was no well tag observed on any of the well apparatus located onsite.
2462728 Primary Facility 2016-03-07 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus plumbed-open. Well head casing-equipment-100 bbl tank look ok.
2644355 Primary Facility 2017-10-06 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is shut. The well head casing and grounded 100 bbl fiberglass tank look ok.

For data sources see[7]

References