Well ID: 37-005-30832 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.87135,"lon":-79.452719,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Boggs Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147565 | |
Farm/Lease Name: COLLIER-TREGASKES UNIT 1M | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.871350 | |
Longitude: -79.452719 |
Date | Event |
---|---|
2011-05-18 | New Permit Application |
2011-06-23 | Performed Spud Operation |
2011-07-06 | Drilling Completion |
2011-08-25 | Perforation |
2014-04-14 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | SNYDER BROS INC | 3,903.00 | 73 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 7,046.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 4,062.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 2,490.00 | 267 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 2,987.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 2,175.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,647.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,802.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,760.00 | 350 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SNYDER BROS INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 3,730.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 1,540.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 2,760.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2018 | SNYDER BROS INC | Produced Fluid | 22.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1984003 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Drill rig crew indicated that they had finished setting the conductor pipe. Drill pit located onsite. It had more than the required two feet of lined freeboard. Noted that the erosion controls had been implemented as outlined in the E&S plan. The operator should perform routine erosion control inspections and maintain the controls as necessary to insure their continued effectiveness. |
1994772 | Primary Facility | 2011-07-28 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Construction was underway for the well stimulation impoundment. All E&S controls had functioned properly. No accelerated erosion or sedimentation was observed in relation to the well-site. Drill pit onsite contained fluids and drill cuttings. Pit had more than the required two feet of lined freeboard. |
2001553 | Primary Facility | 2011-09-08 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Operator was in the process of moving a service rig and other equipment onsite. Due to recent weather conditions this has resulted in the transport of large chunks of mud onto State Route 1034. Contacted operator representative Doug Miller regarding this matter and he stated the contractor has already been notified of this matter and a plow and/or broom truck was to be onsite addressing the mud on the road issue. Mr. Miller requested that if WQS Higgins did not observe the truck onsite in the near future to call him back. Upon leaving the site the plow truck in question was en-route to address the issue. The operator should evaluate the access road erosion controls (i.e. rock due to lack of grade associated with the road) after this period of heavier traffic is completed. |
2018791 | Primary Facility | 2011-11-14 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Both well stimulation and drill pits located onsite. Both pits contained fluids and had more than the required two feet of lined freeboard. It was noted that there were several small holes observed on the sidewall of the well stimulation pit. The fluid level in this pit should be kept at least two feet from the lowest hole. All E&S controls appeared to be functioning properly and there was no evidence of accelerated erosion or sedimentation. |
2063956 | Primary Facility | 2012-05-01 | Routine/Complete Inspection | No Violations Noted | Inspection performed as a result of an operator request for an extension to the 9-month restoration timeframe. Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Drill pit and frac impoundment located onsite. Both contained fluids and had more than the required two feet of lined freeboard. All erosion controls had been properly maintained and there was no accelerated erosion or sedimentation observed in relation to the access road or well-site. The operator should continue to monitor and maintain the erosion controls until well development activities are completed. |
2154604 | Primary Facility | 2013-04-05 | Site Restoration | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. It was noted that the well is located in a pasture field, but had been isolated with fencing. |