If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30862 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.771906,"lon":-79.625458,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 146602 | |
Farm/Lease Name: SOLOMON-WISE 1M-27 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-09-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.771906 | |
Longitude: -79.625458 |
Date | Event |
---|---|
2011-09-07 | New Permit Application |
2011-10-27 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | MDS ENERGY LTD | 5,613.00 | 14 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 65,188.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 36,598.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 23,437.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 17,722.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 14,546.00 | 311 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 14,771.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 11,375.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 11,492.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 1,731.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | MDS ENERGY LTD | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | MDS ENERGY LTD | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2013 | MDS ENERGY LTD | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | MDS ENERGY LTD | Produced Fluid | 236.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 155.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2013688 | Primary Facility | 2011-10-26 | Routine/Complete Inspection | Violation(s) Noted | Site construction had been completed, drilling had not commenced at the time of the inspection. E&S controls had been implemeneted as outlined in the E&S plan. Access road controls should effectively minimize accelerated erosion and sedimentation as it relates to the access road. Noted that the access road is shared with two residences near the well pad. The site erosion controls implemented where inadequate to eefectively minimize accelerated erosion & sedimentation. Specifically silt fencing and hay bales had been installed where collection ditches from either side of the well pad converge and result in a concentrated flow of runoff. It is apparent that prior to site construction that this is the direction that runoff flowed. |
2017543 | Primary Facility | 2011-10-27 | Drilling/Alteration | No Violations Noted | Operator provided spud notification to begin on 10-27-11. No equipment on site at time of inspection. Pit lined and freeboard maintained. |
2017941 | Primary Facility | 2011-11-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Drilling appeared to have been completed. Equipment was in the process of being set up for well development. It was noted that a small sediment trap had been installed in the area requested as a result of the previous inspection on 10/26/11. This sediment trap should have been larger and the approaching collection ditches should have been stabilized with either clean durable rock or erosion control matting of some nature and seeding to minimize the generation and transport of sediment. |
2018462 | Primary Facility | 2011-11-09 | Drilling/Alteration | No Violations Noted | Superior Well Services connecting flow line from choke manifold in preparation for frac (nitrogen) at time of inspection. |
2026190 | Primary Facility | 2011-12-13 | Compliance Evaluation | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site appeared to have been recently regraded and the access road and ditches finished with clean durable rock. The operator should seed & mulch the site as soon as possible to insure complaince with 102.22(b). There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2070004 | Primary Facility | 2012-05-22 | Site Restoration | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound working condition. The site had recently been seeded and mulch but does not meet the minimum vegetative standard at the time of inspection. The Department recommends that the Operator continue to monitor the site to ensure 70% uniform vegetative coverage criteria is met. No accelerated erosion and sedimentation observed is relation to the well pad area or the access road. |
2201413 | Primary Facility | 2013-09-04 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. No accelerated erosion or sedimentation was observed in relation to the site or access road and the vegetative cover met the 70% uniform coverage criteria. |
2487001 | Primary Facility | 2016-05-24 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2013688 | 623108 | 10/26/2011 | 2011-10-26 | 102.4INADPLN - E&S Plan not adequate | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
623108 | 276263 | NOV - Notice of Violation | Comply/Closed | 2011-12-13 |
For data sources see[7]