X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30881

Well Details

Well ID: 37-005-30881
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146599
Farm/Lease Name: MICHAEL SHANEOUR ETUX 1M-20
License Status:
Spud Date:
Permit Date: 2011-09-14
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.780206
Longitude: -79.561142

For data sources see[1][2][3]

Well History

Date Event
2011-09-14 New Permit Application
2012-09-28 Permit Renewal Application
2013-02-21 Performed Spud Operation
2013-07-29 Drilling Completion
2013-08-14 Perforation
2015-11-06 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-15 2013-08-16 6,898 156,916 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (0%-7.5%) Nabors Completion and Production Services Bulk Acid Hydrogen Chloride 7647-01-0 7 0.012198 0
HCl Acid (12.5%-18.0%) Nabors Completion and Production Services Bulk Acid Hydrogen Chloride 7647-01-0 16 0.031565 0
Super 100 NE Nabors Completion and Production Services Surfactants & Foamers Methyl Alcohol 67-56-1 15 0.020813 0
Isopropyl Alcohol 67-63-0 40 0.055501 0
2-Butoxyethanol 111-76-2 5 0.006938 0
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine
68139-30-0 15 0.020813 0
Nitrogen per MSCF Nabors Completion and Production Services Nitrogen Materials Nitrogen 7727-37-9 100 27.9916 0
KR-153SL Nabors Completion and Production Services Biocides 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.001282 0
Polyethlyene-Glycol 25322-68-3 50 0.003206 0
Water MDS Energy LTD Water Water 7732-18-5 100 51.5937 0
Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Crystalline Silica, quartz 14808-60-7 99.9 19.7594 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00009800 0
Ethoxylated Nonylphenol 68412-54-4 13 0.000127 0
Glycol Ethers 111-46-6 40 0.000391 0
Isopropyl Alcohol 67-63-0 40 0.000391 0
Propargyl Alcohol 107-19-7 40 0.000391 0
ICP-1000 Nabors Completion and Production Services Iron Control Additives Anionic Copolymer Proprietary 50 0.005746 0
Propylene glycol 57-55-6 50 0.005746 0
Other Ingredients Nabors Completion and Production Services Other Ingredients Proprietary Proprietary 50 0.00281332 0
Proprietary Proprietary 15 0.000843888 0
Polymer Proprietary 1 0.00146417 0
Anionic Polyacrylamide 910644-97-2 40 0.0403765 0
Water 7732-18-5 50 0.0732086 0
Water 7732-18-5 48 0.000478382 0
Ammonium salts Proprietary 100 0.0292834 0
Proprietary Proprietary 100 0.146417 0
Propylene glycol 57-55-6 15 0.0151416 0
Phosphoric Acid 7664-38-2 100 0.00146417 0
Water 7732-18-5 60 0.00337555 0
Water 7732-18-5 80 0.00489562 0
2-Butoxyethanol 111-76-2 13 0.000129002 0
ammonium, (2-Hydroxyethyl)trimethyl-, chloride 67-48-1 80 0.000581584 0
Monoethanolamine Proprietary 100 0.00146417 0
Proprietary Proprietary 1 0.00146417 0
Demineralized Water 7732-18-5 50 0.000363355 0
Water 7732-18-5 87.5 0.153995 0
Alkyl Phosphate Ether Proprietary 1 0.00146417 0
Proprietary Proprietary 2 0.00201888 0
Water 7732-18-5 40 0.0403765 0
Solvent Proprietary 1 0.00146417 0
Polymer Proprietary 10 0.0146417 0
Dioxane 123-91-1 1 0.00000968 0
WFR-3B Nabors Completion and Production Services Friction Reducer Propylene Glycol 57-55-6 25 0.025123 0
Ethoxylated alcohols 68002-97-1 4 0.00402 0
Mineral Spirits 8052-41-3 10 0.010049 0
Hydrotreated light distillates, non-aromatic, BTEX free 64742-47-8 30 0.030148 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2012 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2013 MDS ENERGY DEV LLC 27,508.00 72 0.00 0 0.00 0
2014 MDS ENERGY DEV LLC 60,990.00 364 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 33,000.70 350 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 23,630.90 345 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 20,923.20 355 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 16,957.00 357 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 16,036.00 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 MDS ENERGY DEV LLC Fracing Fluid Waste 2,355.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2013 MDS ENERGY DEV LLC Produced Fluid 286.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 MDS ENERGY DEV LLC Produced Fluid 112.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2108010 Primary Facility 2012-10-12 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.
2140000 Primary Facility 2013-02-14 Routine/Complete Inspection No Violations Noted Site had been constructed but had not been drilled. Perimeter E&S controls were installed in accordance with the on-site E&S plan. Pit had been dug and the pit liner appeared to be in good condition. No erosion issues were apparent.
2149664 Primary Facility 2013-03-18 Drilling/Alteration No Violations Noted Well spud in. Pit lined and freeboard maintained.
2161262 Primary Facility 2013-04-24 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained a small amount of fluids. Pit had more than the required two feet of lined freeboard.
2178224 Primary Facility 2013-06-26 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained a small amount of fluids. Pit had more than the required two feet of lined freeboard. Production equipment was observed onsite, this included brine tanks which appeared to be in sound condition.
2187857 Primary Facility 2013-07-31 Drilling/Alteration No Violations Noted Waiting on frac. Well shut in on 4 1/2” x 2” swage. 7” x 4 1/2” annulus open. Slight expression of gas at base of wellhead. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano.
2236066 Primary Facility 2014-01-14 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded and temporarily stabilized. The operator should monitor the site to insure that 70% uniform coverage is achieved. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2266948 Primary Facility 2014-04-30 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite. Brine tanks appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation had begun to emerge. The operator should continue to monitor the site to insure that the vegetation begins to take hold.
2348573 Primary Facility 2015-03-02 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.

For data sources see[8]

References