If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30906 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.855058,"lon":-79.554928,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 145916 | |
Farm/Lease Name: SAMUEL W MONTGOMERY JR ETUX 1M-38 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.855058 | |
Longitude: -79.554928 |
Date | Event |
---|---|
2011-10-07 | New Permit Application |
2012-11-02 | Permit Renewal Application |
2013-02-14 | Performed Spud Operation |
2013-03-01 | Drilling Completion |
2013-04-03 | Perforation |
2014-04-14 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-01 | 2013-05-02 | 6,496 | 170,730 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KR-153SL | Nabors Completion and Production Services | Biocides | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 22 | 0.001147 | 0 |
Polyethlyene-Glycol | 25322-68-3 | 50 | 0.002868 | 0 | ||||
Diethylene Glycol | 111-46-6 | 3.5 | 0.000201 | 0 | ||||
Ethylene Glycol | 107-21-1 | 1 | 0.00005700 | 0 | ||||
Clay Treat | Nabors Completion & Production Services Co. | Clay Control | Propietary | 67-48-1 | 80 | 0.000553 | 0 | |
Super TSC | Nabors Completion & Production Services Co | Scale Control | 2 phosphonobutane 1,2,4 tricarboxylic acid | 37971-36-1 | 0 | 0 | 0 | |
Anionic Copolymer (proprietary) | proprietary | 0 | 0 | 0 | ||||
Propylene Glycol | 57-55-6 | 50 | 0.002606 | 0 | ||||
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Anionic Copolymer | Proprietary | 50 | 0.005495 | 0 | |
Propylene glycol | 57-55-6 | 50 | 0.005495 | 0 | ||||
Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 26.4704 | 0 | |
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Isopropyl Alcohol | 67-63-0 | 30 | 0.000183 | 0 | |
proprietary | proprietary | 7 | 0.00004300 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 30 | 0.000183 | 0 | ||||
Glycol Ethers | 111-46-6 | 30 | 0.000183 | 0 | ||||
HCL Acid (0%-7.5%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 7 | 0.013207 | 0 | |
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | POLY(OXY-1,2-ETHANEDIYL), .ALPHA.-HYDRO-.OMEGA.-HYDROXY-, MONO-C8-10-ALKYL ETHERS, PHOSPHATES |
68130-47-2 | 2 | 0.00999635 | 0 | |
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetain E |
68139-30-0 | 4 | 0.0199954 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.00140863 | 0 | ||||
Proprietary | Proprietary | 15 | 0.00204496 | 0 | ||||
Polyethylene glycol trimethylnonyl ether | 60828-78-6 | 10 | 0.0499872 | 0 | ||||
Water | 7732-18-5 | 80 | 0.0118618 | 0 | ||||
Dodecylbenzenesulfonate isopropanolamine | 42504-46-1 | 7 | 0.03499 | 0 | ||||
Water | 7732-18-5 | 40 | 0.11269 | 0 | ||||
Water | 7732-18-5 | 87.5 | 0.373104 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.000312726 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 3 | 0.0149945 | 0 | ||||
Demineralized Water | 7732-18-5 | 50 | 0.000881071 | 0 | ||||
Sodium Metabisulfite | 7681-57-4 | 1 | 0.00499818 | 0 | ||||
Water | 7732-18-5 | 32 | 0.159955 | 0 | ||||
Cocamidopropyl Dimethylamine | 68140-01-2 | 2 | 0.00999635 | 0 | ||||
Naphthalene | 91-20-3 | 1 | 0.00499818 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.0422588 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00002447 | 0 | ||||
Water | 7732-18-5 | 48 | 0.00115845 | 0 | ||||
Proprietary | Proprietary | 2 | 0.00563451 | 0 | ||||
Sulfamic Acid | 5329-14-6 | 4 | 0.0199954 | 0 | ||||
Ammonium C6-10-alkyl polyoxyethylene sulfate | 68037-05-8 | 13 | 0.0649817 | 0 | ||||
Alcohol, c6-c-12, Ethoxylate | 68439-45-2 | 9 | 0.0449863 | 0 | ||||
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.11269 | 0 | ||||
Monoethanolamine | 141-43-5 | 1 | 0.00499818 | 0 | ||||
Proprietary | Proprietary | 50 | 0.00681743 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 1 | 0.00499818 | 0 | ||||
Solvent Naptha (Petroleum), Medium Aliphatic | 64742-88-7 | 1 | 0.00499818 | 0 | ||||
Epichlorohydrin | 106-89-8 | 1 | 0.00499818 | 0 | ||||
N,N- Dimethyl-1,3-Propanediamine | 109-55-7 | 1 | 0.00499818 | 0 | ||||
Coconut oil (Ventura) | 8001-31-8 | 2 | 0.00999635 | 0 | ||||
Water | 7732-18-5 | 60 | 0.00817982 | 0 | ||||
HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17 | 0.030188 | 0 | |
Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 19.2856 | 0 | |
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Ethoxylated alcohols | 68002-97-1 | 15 | 0.004347 | 0 | |
Hydrotreated light distillates | 64742-47-8 | 30 | 0.032599 | 0 | ||||
Mineral Spirits | 8052-41-3 | 10 | 0.010866 | 0 | ||||
Propylene Glycol | 57-55-6 | 25 | 0.027166 | 0 | ||||
Super MAX | Nabors Completion and Production Services | Surfactants & Foamers | Proprietary | propietary | 7 | 0.001953 | 0 | |
Glycol Ether | 111-76-2 | 7 | 0.001953 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 30 | 0.00837 | 0 | ||||
Ethylhexanol | 104-76-7 | 40 | 0.011161 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY DEV LLC | 45,303.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY DEV LLC | 42,862.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 24,363.60 | 298 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 20,638.50 | 345 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 7,534.40 | 141 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 5,098.00 | 67 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 19,847.00 | 330 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | MDS ENERGY DEV LLC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | MDS ENERGY DEV LLC | Fracing Fluid Waste | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | MDS ENERGY DEV LLC | Produced Fluid | 172.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | MDS ENERGY DEV LLC | Drilling Fluid Waste | 360.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | MDS ENERGY LTD | Drilling Fluid Waste | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | MDS ENERGY DEV LLC | Produced Fluid | 94.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2013 | MDS ENERGY LTD | Drilling Fluid Waste | 360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2014 | MDS ENERGY DEV LLC | Produced Fluid | 96.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 83.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 270.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2139998 | Primary Facility | 2013-02-14 | Routine/Complete Inspection | No Violations Noted | Earth moving equipment was improving the access road. A rock pile and soil pile were on the well pad. The rock was to be added to the sediment trap along the western edge of the site and the soil pile was to be disbursed as fill and mulched. E&S controls delineated by the on-site E&S plan appear adequate to control erosion. The perimeter silt fence was installed. No erosion issues were evident. |
2145543 | Primary Facility | 2013-02-26 | Routine/Complete Inspection | No Violations Noted | Site was being drilled at time of inspection. Drill cuttings were evident in the flowback pit which had adequate freeboard. E&S controls were installed according to the on-site E&S plan. No evidence of erosion was noted. Department suggests the Operator continue to maintain the access road to prevent transport of sediment to the adjacent road. |
2145903 | Primary Facility | 2013-02-27 | Drilling/Alteration | No Violations Noted | First Class Energy rig#12 RD20 tripped out of hole (5511’) and shut down for repair at time of inspection. Pit lined and freeboard maintained. |
2148747 | Primary Facility | 2013-03-04 | Routine/Complete Inspection | No Violations Noted | Site had been drilled at time of inspection. Flowback pit had the necessary freeboard. No leakage of drilling fluids or residual waste to the environment was evident. Brine tank and production equipment had been transported to the site and were being erected. Well head was being attached. E&S controls appeared to be properly installed. No erosion issues were evident. |
2159691 | Primary Facility | 2013-04-18 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained cuttings and fluids. Pit had more than the required two feet of lined freeboard. Noted in the E&S plan the soils information indicates that cuttings encapsulation could not be performed and meet the Chapter 78.62 requirements. WQS Higgins spoke via phone with the operator and the information obtained which outlines encapsulation can be performed is being compiled to be forwarded to WQS Higgins. |
2177156 | Primary Facility | 2013-06-21 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well appeared to be equipped for production. Drill pit located onsite and it contained drill cuttings and minimal fluids. The pit had more than the required two feet of lined freeboard. Site and access road erosion controls appeared to be functioning properly and there was no evidence observed of accelerated erosion or sedimentation in relation to the access road or well-site. |
2211839 | Primary Facility | 2013-10-10 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been regraded and the vegetation had taken hold and met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2442288 | Primary Facility | 2016-01-21 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus open. Well head casing-production equipment-meter set-100 bbl tank look ok. |
2485175 | Primary Facility | 2016-05-18 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[8]