If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30920 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.003639,"lon":-79.262308,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Redbank Township | |
Operator Name: REDMILL DRILLING | |
Well Pad ID: 146926 | |
Farm/Lease Name: H M BOYER 3-77 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-11-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.003639 | |
Longitude: -79.262308 |
Date | Event |
---|---|
2011-11-18 | New Permit Application |
2012-05-14 | Performed Spud Operation |
2012-05-24 | Drilling Completion |
2012-07-19 | Perforation |
2013-05-29 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-19 | 2012-07-19 | 6,490 | 151,442 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KR-153SL | Superior Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00251100 | |
Water | 7732-18-5 | 80.00 | 0.01 | |||||
PA Specific 40/70 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Titanium dioxide | 13463-67-7 | 0.10 | 0.01 | ||
Quartz | 14808-60-7 | 99.90 | 12.99 | |||||
Alumina | 1344-28-1 | 1.10 | 0.14 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.01 | |||||
Nitrogen per MSCF | Superior Well Services | Nitrogen Materials | Nitrogen, liquid | 7727-37-9 | 100.00 | 4.18 | ||
Super 100NE | Services Company, USA | Surfactant/Foamer | Cocoamido Tertiary Amine | |||||
Sulfamic acid | 5329-14-6 | |||||||
Demulsifier Base | ||||||||
Urea | 57-13-6 | |||||||
Alkyl Phosphate Ester | ||||||||
Ethoxylated Alcohol | ||||||||
Water | 7732-18-5 | |||||||
Isopropanol | 67-63-0 | 30.00 | 0.05 | |||||
Epichlorohydrin | 106-89-8 | |||||||
Sodium metabisulfite | 7681-57-4 | |||||||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.01 | |||||
Ethanolamine | 9007-33-4 | |||||||
Acid Inhibitor 2 (AI-2) | Superior Well Services | Acid Corrosion Inhibitor | Glycol Ethers | 20.00 | 0.00009100 | |||
Propargyl alcohol | 107-19-7 | 20.00 | 0.00009100 | |||||
Tar bases, quinoline derivatives, benzyl chloride-quaternized |
72480-70-7 | 10.00 | 0.00004500 | |||||
Isopropanol | 67-63-0 | 15.00 | 0.00006800 | |||||
Water | 7732-18-5 | 40.00 | 0.00018100 | |||||
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-
, |
68412-54-4 | 13.00 | 0.00005900 | |||||
PA Specific 30/50 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Alumina | 1344-28-1 | 1.10 | 0.15 | ||
Quartz | 14808-60-7 | 99.90 | 14.17 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.01 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.01 | |||||
Super MAX | Superior Well Services | Surfactant/Foamer | 1-Propanaminium, N-(3-aminopropyl)-2-hydroxy-N,N-dimethyl-3-sulfo-, N-coco acyl derivs., inner salts |
68139-30-0 | 4.00 | 0.00003500 | ||
Epichlorohydrin | 106-89-8 | 1.00 | 0.00000900 | |||||
Isopropanolamine dodecylbenzene | 42504-46-1 | 7.00 | 0.00006200 | |||||
Water | 7732-18-5 | 32.00 | 0.00028200 | |||||
Ethoxylated C6-12 alcohols | 68439-45-2 | 9.00 | 0.00007900 | |||||
?-[3.5-dimethyl-1-(2-methylpropyl)hexyl]-w-hydroxy-poly(oxy-1,2-ethandiyl ) |
60828-78-6 | 10.00 | 0.00008800 | |||||
Naphthalene | 91-20-3 | 1.00 | 0.00000900 | |||||
3-(Dimethylamino)propylamine | 109-55-7 | 1.00 | 0.00000900 | |||||
Sulfamic acid | 5329-14-6 | 4.00 | 0.00003500 | |||||
Sodium metabisulfite | 7681-57-4 | 1.00 | 0.00000900 | |||||
Ethanolamine | 141-43-5 | 1.00 | 0.00000900 | |||||
Amides, coco, N-[3-(dimethylamino)propyl] | 68140-01-2 | 2.00 | 0.00001800 | |||||
Phosphoric acid Divosan X-Tend formulation | 7664-38-2 | 1.00 | 0.00000900 | |||||
2-Butoxyethanol | 111-76-2 | 3.00 | 0.00002600 | |||||
Poly(oxy-1,2-ethanediyl), ?-sulfo-?-(hexyloxy)-, C6-10-alkyl ethers, ammonium salts |
68037-05-8 | 13.00 | 0.00011400 | |||||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.00006200 | |||||
Coconut oil | 8001-31-8 | 2.00 | 0.00001800 | |||||
Stoddard solvent IIC | 64742-88-7 | 1.00 | 0.00000900 | |||||
Methanol | 67-56-1 | 7.00 | 0.00006200 | |||||
2-Ethylhexanol | 104-76-7 | 40.00 | 0.00035200 | |||||
Isopropanol | 67-63-0 | 40.00 | 0.00035200 | |||||
Poly(oxy-1,2-ethanediyl), alpha-hydro-omega-hydroxy-, mono-C8-10- alkyl |
68130-47-2 | 2.00 | 0.00001800 | |||||
Super 100NE | Superior Well Services | Surfactant/Foamer | Methanol | 67-56-1 | 10.00 | 0.01 | ||
Naphthalene | 91-20-3 | 1.50 | 0.00282300 | |||||
Hydrochloric Acid 12.5-18 | Superior Well Services | Bulk Acid | Water | 7732-18-5 | 87.50 | 0.21 | ||
Hydrogen Chloride | 18.00 | 0.04 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | BLX INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | BLX INC | 16,438.09 | 57 | 0.00 | 0 | 0.00 | 0 |
2013 | REDMILL DRILLING | 60,913.37 | 340 | 0.00 | 0 | 0.00 | 0 |
2014 | REDMILL DRILLING | 34,397.69 | 351 | 0.00 | 0 | 0.00 | 0 |
2015 | REDMILL DRILLING | 24,800.91 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | REDMILL DRILLING | 17,650.82 | 341 | 0.00 | 0 | 0.00 | 0 |
2017 | REDMILL DRILLING | 17,784.05 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | REDMILL DRILLING | 14,559.14 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | REDMILL DRILLING | 13,116.14 | 356 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | BLX INC | Fracing Fluid Waste | 550.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | BLX INC | Fracing Fluid Waste | 4,800.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | BLX INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2013 | BLX INC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | REDMILL DRILLING | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-23614 |
2013 | BLX INC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2013 | BLX INC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2014 | REDMILL DRILLING | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2015 | REDMILL DRILLING | Produced Fluid | 118.00 Bbl | INJECTION DISPOSAL WELL | 34-133-23614 |
2016 | REDMILL DRILLING | Produced Fluid | 60.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | REDMILL DRILLING | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | REDMILL DRILLING | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2066767 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | Site construction was underway at the time of the inspection. Fresh water pit was located onsite and it had more than the required two feet of lined freeboard. Noted that the interceptor ditch shown on the E&S plan should be rocked or stabilized with erosion control matting. In addition the use of hay bales at the outlet of the interceptor ditch is not an appropriate use of this BMP. The operator should implement a rock lined outlet or a small rock lined sediment trap. At this time the Department is requesting that the operator address these minor deficiencies with the E&S plan and its implementation and forward documentation that these issues have been addressed no later than May 28, 2012. This information should be sent to the attention of Water Quality Specialist Greg Higgins at the above address. |
2068091 | Primary Facility | 2012-05-15 | Drilling/Alteration | No Violations Noted | @ 420'; Notif OK |
2069491 | Primary Facility | 2012-05-17 | Drilling/Alteration | No Violations Noted | waiting on BOP; Intermediate installed |
2072300 | Primary Facility | 2012-05-25 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Dril pit and freshwater impoundment located onsite. Both had more than the required two feet of lined freeboard. E&S plan onsite and the plan has been implemented properly. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. The operator should continue to maintain the site and road erosion controls until well development activities are completed. |
2081673 | Primary Facility | 2012-07-09 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at the time of the inspection. Drill pit and freshwater impoundment located onsite. Both had more than the required two feet of lined freeboard. E&S plan onsite and the plan has been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. The operator should continue to maintain the site and road erosion controls until well development activities are completed. |
2095772 | Primary Facility | 2012-08-28 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The operator should insure that the containment diking constructed around the brine tanks meets the permeability requirements to insure that it effectively contains any fluids should a release occur. All buried metallic piping related to the conveyance of production fluids to the brine tanks should mee the corrosion protection requirements set forth in OGA 3218.4(a). The site had been regraded, however the topsoil had not been spread over the well pad. The well site was not temporarily stabilized as it should have been as per 25 PA Code 102.22(b). The Department recommends that the operator undertake temporarily stabilization if the remainder of site restoration actvities are not to be completed in the immediate future. Frac impoundment located onsite and it had more than the required two feet of lined freeboard. |
2142916 | Primary Facility | 2013-02-26 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been regared and temporarily stabilized. The was no observed accelerated erosion or sedimentation in relation to the access road or well-site. The operator should continue to monitor the site to insure that the vegetative cover attains the minimum 70% uniform coverage. |
2244573 | Primary Facility | 2014-02-11 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site was snow covered. |
2650681 | Primary Facility | 2017-10-23 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2684915 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
2827865 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | On 1/16/19 at 0829 hrs., I conducted a routine inspection of Redmill Drilling's H M Boyer 3-77 well (API 005-30920) in Redbank Twp., Armstrong Co. The well pad is restored and permanently stabilized. Two brine tanks are located within adequate secondary containment. The well is equipped for production. A site ID sign is present at the entrance to the well pad. A well tag should be affixed to the well head. There are no violations being cited for this inspection. |
For data sources see[8]