Well ID: 37-005-31024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.680822,"lon":-79.575833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 146493 | |
Farm/Lease Name: RALPH MYERS ETUX 2M-28 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-03-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.680822 | |
Longitude: -79.575833 |
Date | Event |
---|---|
2012-03-30 | New Permit Application |
2012-03-30 | Performed Spud Operation |
2012-05-23 | Drilling Completion |
2012-12-19 | Perforation |
2013-05-29 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-12-19 | 2012-12-19 | 7,252 | 162,033 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Supermax | Surfactant/Foamer | Isopropanol | 67-63-0 | 30.00 | 0.00848000 | ||
Proprietary | 7.00 | 0.00198000 | ||||||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.00198000 | |||||
2-Ethylhexanol | 104-76-7 | 40.00 | 0.01 | |||||
Acid Inhibitor-2 | Acid Corrosion Inhibitor | Proprietary | 7.00 | 0.00007000 | ||||
2-Butoxyethanol | 111-76-2 | 30.00 | 0.00028000 | |||||
Isopropanol | 67-63-0 | 30.00 | 0.00028000 | |||||
Propargyl alcohol | 107-19-7 | 30.00 | 0.00028000 | |||||
Nitrogen | Stimulant Fluid | Nitrogen, liquid | 7727-37-9 | 100.00 | 28.62 | |||
Hydrochloric Acid 0-7.5 | Bulk Acid | Hydrochloric acid | 7647-01-0 | 7.00 | 0.01 | |||
Acid Inhibitor-2 | Nabors Industries | Acid Corrosion Inhibitor | ||||||
Clay Treat | Clay Control | Choline chloride | 67-48-1 | 80.00 | 0.00056000 | |||
KR-153SL | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00116000 | |||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.00291000 | |||||
Ethylene glycol | 107-21-1 | 1.00 | 0.00006000 | |||||
Diethylene glycol | 111-46-6 | 3.50 | 0.00020000 | |||||
ICP-1000 | Low Freeze Point Dispersant | Anionic Copolymer (proprietary) | 50.00 | 0.00557000 | ||||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00557000 | |||||
WFR-3B | Friction Reducer | 1,2-Propylene glycol | 57-55-6 | 25.00 | 0.02 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | |||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | 0.00415000 | |||||
Stoddard solvent | 8052-41-3 | 10.00 | 0.01 | |||||
Super TSC | Scale Control | Anionic Copolymer (proprietary) | ||||||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00264000 | |||||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | |||||||
Hydrochloric Acid 12.5-18 | Bulk Acid | Hydrochloric acid | 7647-01-0 | 16.00 | 0.03 | |||
Sand | Proppant | Quartz | 14808-60-7 | 99.90 | 19.17 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 119,750.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 49,892.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 37,187.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 29,446.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 27,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 22,833.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 20,171.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 1,530.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2012 | MDS ENERGY LTD | Drilling Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | MDS ENERGY LTD | Drilling Fluid Waste | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | MDS ENERGY LTD | Drilling Fluid Waste | 720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2013 | MDS ENERGY LTD | Fracing Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2013 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | MDS ENERGY LTD | Drilling Fluid Waste | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2013 | MDS ENERGY LTD | Drilling Fluid Waste | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 118.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2046865 | Primary Facility | 2012-03-01 | Routine/Complete Inspection | No Violations Noted | E&S plan reviewed as part of OG-57 application. |
2055837 | Primary Facility | 2012-04-02 | Routine/Complete Inspection | No Violations Noted | Drilling commenced on 03/31/12, but was not ongoing at the time of the inspection. Site had been constructed as outliend in the approved E&S plan. Spoke with operator representative via phone regarding the addition of rock to the outflow area of the sediment trap implemented at te base of the fill slope. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2063950 | Primary Facility | 2012-05-01 | Routine/Complete Inspection | No Violations Noted | Inspection performed as a result of a resumption of drilling notice. Drilling had not as of yet re-commenced. Erosion controls had been implemented and maintained properly. There was no accelerated erosion or sedimenation observed in relation to the access road or well-site. Drill pit constructed onsite and it contained minimal fluids attributed to precipitation. Operator should continue to maintain the site and access road until well development activities are completed. |
2067208 | Primary Facility | 2012-05-03 | Drilling/Alteration | No Violations Noted | @680' ; Pit & E&S OK |
2067291 | Primary Facility | 2012-05-08 | Drilling/Alteration | No Violations Noted | Preparing to install Intermediate casing |
2093043 | Primary Facility | 2012-08-20 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well was not equipped for production. Site had been effectively temporarily stabilized. E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2103404 | Primary Facility | 2012-09-28 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well was not equipped for production. Frac impoundment located onsite and it had more than the required two feet of lined freeboard. There was no evidence observed of accelerated erosion or sedimentation related to the access road or well-site. It was noted that the sediment trap implemented at the outlets of the collection ditches required routine maintenance to insure its continued functionality. |
2144156 | Primary Facility | 2013-03-01 | Routine/Complete Inspection | No Violations Noted | Site had been effectively regraded and temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that the sediment trap implemented at the base of the fill slope for the well pad had been left in place. The operator is reminded that they are responsible for continued maitenance of this erosion control. Well appeared to be equipped for production and brine tanks were located onsite. Brine tanks appeared to be in sound condition. |
2168109 | Primary Facility | 2013-05-15 | Site Restoration | No Violations Noted | Site had been effectively regraded and temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production and brine tanks were located onsite. Brine tanks appeared to be in sound condition. The sediment trap that had been at the base of the well-site had been removed and that area had been regraded. The site had been seeded and mulched and the vegetation was beginning to take hold. The operator should continue to monitor the site for erosion where the sediment trap had been and to insure that 70% uniform vegetative cover had been achieved. |
2348563 | Primary Facility | 2015-03-02 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2679081 | Primary Facility | 2018-01-08 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well is drilled and appears equipped for production. |
2762543 | Primary Facility | 2018-08-10 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment and 2 grounded 100 bbl fiberglass fluid collection tanks look ok. |
2836128 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | On 2/4/19 at 1343 hrs., I conducted a routine inspection of MDS Energy Development, LLC's Ralph Myers etux 2M-28 well (API 005-31024) in Gilpin Twp., Armstrong Co. The well pad is restored and permanently stabilized. The well is equipped for production. A site ID sign is present at the entrance to the well pad. I was unable to access the property to determine if a well tag was affixed to the well head due to a locked gate. I will contact he operator at a later date to arrange access to the site. There are no violations noted for this inspection. |