If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31059 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.915197,"lon":-79.486267,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Washington Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 146254 | |
Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M | |
License Status: | |
Spud Date: | |
Permit Date: 2012-04-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.915197 | |
Longitude: -79.486267 |
Date | Event |
---|---|
2012-04-11 | New Permit Application |
2012-10-31 | Performed Spud Operation |
2012-11-09 | Drilling Completion |
2013-07-30 | Perforation |
2014-04-14 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-12 | 2013-08-12 | 6,569 | 157,735 | 0 |
2 | 2013-07-30 | 2013-07-31 | 6,594 | 162,505 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Super 100 NE | Nabors Completion and Production Services | Surfactants & Foamers | Methanol | 67-56-1 | 15 | 0.02071 | 0 |
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.02071 | 0 | ||||
Glycol Ether | 111-76-2 | 5 | 0.006903 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 40 | 0.055227 | 0 | ||||
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.000119 | 0 | |
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00009100 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 40 | 0.000366 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 40 | 0.000366 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000366 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | Polyethlyene-Glycol | 25322-68-3 | 50 | 0.002812 | 0 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.001125 | 0 | ||||
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | 2-Butoxyethanol | 111-76-2 | 13 | 0.000119 | 0 | |
Proprietary | Proprietary | 2 | 0.001954 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000776 | 0 | ||||
Monoethanolamine | Proprietary | 100 | 0.001381 | 0 | ||||
Alkyl Phosphate Ether | Proprietary | 1 | 0.001381 | 0 | ||||
Solvent | Proprietary | 1 | 0.001381 | 0 | ||||
Proprietary | Proprietary | 100 | 0.138067 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.014652 | 0 | ||||
Water | 7732-18-5 | 50 | 0.069034 | 0 | ||||
Water | 7732-18-5 | 87.5 | 0.141524 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 100 | 0.001381 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.000534 | 0 | ||||
Polymer | Proprietary | 10 | 0.013807 | 0 | ||||
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.039073 | 0 | ||||
Proprietary | Proprietary | 50 | 0.002586 | 0 | ||||
Polymer | Proprietary | 1 | 0.001381 | 0 | ||||
Water | 7732-18-5 | 80 | 0.004499 | 0 | ||||
Water | 7732-18-5 | 40 | 0.039073 | 0 | ||||
Demineralized Water | 7732-18-5 | 50 | 0.000334 | 0 | ||||
Ammonium salts | Proprietary | 100 | 0.027613 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00000900 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000439 | 0 | ||||
Proprietary | Proprietary | 1 | 0.001381 | 0 | ||||
Water | 7732-18-5 | 60 | 0.003103 | 0 | ||||
Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 32.6288 | 0 | |
HCL Acid (0%-7.5%) | Nabors Completion and Production Services | Bulk Acid | Water | 7732-18-5 | 92.5 | 0.14716 | 0 | |
Hydrogen Chloride | 7647-01-0 | 7.5 | 0.011932 | 0 | ||||
PA Specific 40/70 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Iron Oxide | 1309-37-1 | 0.1 | 0.011836 | 0 | |
Titanium Oxide | 13463-67-7 | 0.1 | 0.011836 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.130191 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 11.8237 | 0 | ||||
PA Specific 30/50 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Iron Oxide | 1309-37-1 | 0.1 | 0.006361 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.3547 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.069972 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.006361 | 0 | ||||
Water | SNYDER BROTHERS INC | Water | Water | 7732-18-5 | 100 | 48.5949 | 0 | |
HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.029113 | 0 | |
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Anionic Copolymer | Proprietary | 50 | 0.005384 | 0 | |
Propylene glycol | 57-55-6 | 50 | 0.005384 | 0 | ||||
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.029305 | 0 | |
Ethoxylated alcohols | 68002-97-1 | 15 | 0.014652 | 0 | ||||
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.004884 | 0 | ||||
2 | Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Glycol Ethers | 111-46-6 | 40 | 0.000122 | 0 |
Isopropyl Alcohol | 67-63-0 | 40 | 0.000122 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 40 | 0.000122 | 0 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.00004000 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00003000 | 0 | ||||
Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 31.2671 | 0 | |
Super 100 NE | Nabors Completion and Production Services | Surfactants & Foamers | Isopropyl Alcohol | 67-63-0 | 40 | 0.055591 | 0 | |
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.020847 | 0 | ||||
Glycol Ether | 111-76-2 | 5 | 0.006949 | 0 | ||||
Methanol | 67-56-1 | 15 | 0.020847 | 0 | ||||
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Anionic Copolymer | Proprietary | 50 | 0.005549 | 0 | |
Propylene glycol | 57-55-6 | 50 | 0.005549 | 0 | ||||
PA Specific 40/70 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Iron Oxide | 1309-37-1 | 0.1 | 0.011764 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 11.7523 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.129405 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.011764 | 0 | ||||
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Water | 7732-18-5 | 80 | 0.004487 | 0 | |
Polymer | Proprietary | 1 | 0.00139 | 0 | ||||
Proprietary | Proprietary | 1 | 0.00139 | 0 | ||||
Demineralized Water | 7732-18-5 | 50 | 0.000333 | 0 | ||||
Solvent | Proprietary | 1 | 0.00139 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00000300 | 0 | ||||
Proprietary | Proprietary | 100 | 0.138978 | 0 | ||||
Alkyl Phosphate Ether | Proprietary | 1 | 0.00139 | 0 | ||||
Water | 7732-18-5 | 87.5 | 0.141154 | 0 | ||||
Monoethanolamine | Proprietary | 100 | 0.00139 | 0 | ||||
Polymer | Proprietary | 10 | 0.013898 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.000533 | 0 | ||||
Water | 7732-18-5 | 40 | 0.039494 | 0 | ||||
Water | 7732-18-5 | 50 | 0.069489 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000146 | 0 | ||||
Proprietary | Proprietary | 2 | 0.001975 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000774 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 100 | 0.00139 | 0 | ||||
Water | 7732-18-5 | 60 | 0.003095 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.00004000 | 0 | ||||
Proprietary | Proprietary | 50 | 0.002579 | 0 | ||||
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.039494 | 0 | ||||
Ammonium salts | Proprietary | 100 | 0.027796 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.01481 | 0 | ||||
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.029621 | 0 | |
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.004937 | 0 | ||||
Ethoxylated alcohols | 68002-97-1 | 15 | 0.01481 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.001122 | 0 | |
Polyethlyene-Glycol | 25322-68-3 | 50 | 0.002805 | 0 | ||||
Water | SNYDER BROTHERS INC | Water | Water | 7732-18-5 | 100 | 49.9335 | 0 | |
PA Specific 30/50 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Iron Oxide | 1309-37-1 | 0.1 | 0.006613 | 0 | |
Aluminum Oxide | 1344-28-1 | 1.1 | 0.072747 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.60677 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.006613 | 0 | ||||
HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.029037 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 12,908.00 | 117 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 16,737.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 11,333.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 9,177.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 8,672.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 6,359.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 5,851.00 | 339 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SNYDER BROS INC | Drill Cuttings | 116.00 Tons | ON SITE ENCAPSULATION | |
2012 | SNYDER BROS INC | Drilling Fluid Waste | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 910.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | SNYDER BROS INC | Produced Fluid | 266.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 490.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SNYDER BROS INC | Produced Fluid | 673.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2015 | SNYDER BROS INC | Produced Fluid | 92.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2015 | SNYDER BROS INC | Produced Fluid | 92.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | SNYDER BROS INC | Produced Fluid | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SNYDER BROS INC | Produced Fluid | 190.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | SNYDER BROS INC | 190.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | |
2019 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2106470 | Primary Facility | 2012-10-10 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. Drill pit constructed and properly lined. The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained. |
2111672 | Primary Facility | 2012-10-31 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was onsite and in the process of setting up to start drilling The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. No observation of accelerated erosion and sedimentation in relation to the access road or well pad area at the time of inspection. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. |
2116620 | Primary Facility | 2012-11-19 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment. |
2123196 | Primary Facility | 2012-12-13 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment prior to commencement of well stimulation activities. |
2127654 | Primary Facility | 2013-01-02 | Routine/Complete Inspection | No Violations Noted | Well had been drilled but not equipped for production. Site E&S controls had been implemented as outlined in the onsite E&S plan. Earth-moving equipment was active on site during the inspection, probably preparing the site for arrival of stimulation equipment. A rock pile was noted at the top of the access road apparently to be used to re-establish the rock-lined entryway as recommended in the previous inspection. |
2142582 | Primary Facility | 2013-02-20 | Drilling/Alteration | No Violations Noted | Well shut in on 4 1/2” x 2 swage. Waiting on frac. Pit lined and freeboard maintained. |
2160863 | Primary Facility | 2012-04-09 | Routine/Complete Inspection | No Violations Noted | Site was drilled but not equipped for production. Pit had the necessary 2 feet of freeboard. E & S controls appeared adequate. No E & S issues were noted. |
2173590 | Primary Facility | 2013-06-07 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Site and access road erosion controls appeared to be functioning properly and there was no eviedence of accelerated erosion or sedimentation. Drill pit located onsite and it contained fluids, drill cuttings and it had more than the required two feet of lined freeboard. |
2340601 | Primary Facility | 2015-02-03 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition. |
2443616 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly restored and stabilized with vegetation attaining 70% uniform coverage. |
2739496 | Primary Facility | 2018-06-11 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok. |
2844013 | Primary Facility | 2019-02-25 | Routine/Complete Inspection | No Violations Noted | On 2/25/19 at 1248 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Heffelinger-Croyle Unit 1M well (permit 005-31059) in Washington Twp., Armstrong Co. The well pad is restored and permanently stabilized. The well is properly labeled and equipped for production. A well tag is present at the well head. A site ID sign is posted at the entrance to the well pad. There are no violations noted for this inspection. |
For data sources see[8]