If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31062 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.925608,"lon":-79.544933,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Washington Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147561 | |
Farm/Lease Name: WASHINGTON TOWNSHIP PARK 1M | |
License Status: | |
Spud Date: | |
Permit Date: 2012-04-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.925608 | |
Longitude: -79.544933 |
Date | Event |
---|---|
2012-04-13 | New Permit Application |
2012-11-08 | Performed Spud Operation |
2012-11-20 | Drilling Completion |
2012-12-04 | Perforation |
2013-04-24 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-12-03 | 2012-12-03 | 6,466 | 161,116 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SUPER TSC | Nabors Industries | Paraffin & Scale Additive | 1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00165910 | |
ANIONIC COPOLYMER | 10.00 | 0.00033180 | ||||||
ANIONIC POLYMER | 10.00 | 0.00033180 | ||||||
WFR-3B | Nabors Industries | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Stoddard solvent | 8052-41-3 | 10.00 | 0.00641510 | |||||
1,2-Propylene glycol | 57-55-6 | 25.00 | 0.01 | |||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | 0.00256610 | |||||
KR-153SL | Nabors Industries | Biocide | Ethylene glycol | 107-21-1 | 1.00 | 0.00003320 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00066360 | |||||
Diethylene glycol | 111-46-6 | 3.50 | 0.00011610 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.00165910 | |||||
SUPER MAX | Nabors Industries | Surfactant/Foamer | Isopropanol | 67-63-0 | 30.00 | 0.03 | ||
PROPRIETARY | 7.00 | 0.00922900 | ||||||
2-Ethylhexanol | 104-76-7 | 40.00 | 0.05 | |||||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.00512550 | |||||
SUPER TSC | Nabors Industries | Scale Control | 1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | 10.00 | 0.00033180 | ||
Hydrochloric Acid | Nabors Industries | Cement/Formation Breakdown | Hydrochloric acid | 7647-01-0 | 7.50 | 0.01 | ||
Water | 7732-18-5 | 92.50 | 0.20 | |||||
ICP-1000 | Nabors Industries | Iron Control Additive | ANIONIC COPOLYMER | 50.00 | 0.00331820 | |||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00331820 | |||||
ACID INHIBITOR 2 | Nabors Industries | Acid Corrosion Inhibitor | PROPRIETARY | 0.00003100 | ||||
2-Butoxyethanol | 111-76-2 | 0.00013270 | ||||||
Propargyl alcohol | 107-19-7 | 0.00013270 | ||||||
Isopropanol | 67-63-0 | 0.00013270 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 38,578.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 16,283.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 12,326.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 10,535.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 8,998.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 6,755.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 6,972.00 | 348 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SNYDER BROS INC | Drill Cuttings | 109.00 Tons | ON SITE ENCAPSULATION | |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 5,155.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2012 | SNYDER BROS INC | Produced Fluid | 400.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | SNYDER BROS INC | Produced Fluid | 186.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2013 | SNYDER BROS INC | Produced Fluid | 587.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Produced Fluid | 183.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | SNYDER BROS INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2017 | SNYDER BROS INC | Produced Fluid | 40.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2104714 | Primary Facility | 2012-10-03 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. It was noted due to the short distance of the access road that the operator should closely monitor and maintain the rocked access road to minimize the amount of sediment generated and/or transported onto SR 4017 as result of traffic related to well development. All site and access road controls had been implemented as outlined in the onsite E&S plan. In the future the Department recommends that the operator installed sdiment traps so that they do not discharge in a wooded area with mainly leaf litter and very little to no vegetation. |
2128488 | Primary Facility | 2013-01-07 | Routine/Complete Inspection | No Violations Noted | Well operating and needs proper identification. |
2139999 | Primary Facility | 2013-02-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection, site was experiencing a seasonal abnormally high temperature. The resulting snow melt saturated the soil and created a high level of surface water run-off. Rapid water flows along the silt socks on the southern perimeter of the site were visible. These culminated in puddling behind the silt sock at the south-east corner of the site near the production equipment with some water flowing over the silt sock. The Department notes this was an extraordinary event but recommends the operator install additional preventative E&S measures as required to preclude off-site transport of sediment. |
2145545 | Primary Facility | 2013-02-26 | Follow-up Inspection | In Compliance with Policy | It is noted that since the previous inspection additional mulch was added in some areas of the site including the southeast corner where excessive run-off was previously noted. The mulch should help abate possible erosion and preclude off-site transport of sediment. The Department recommends the Operator continue to monitor and maintain E&S controls, especially after rain events and snow melts. |
2185977 | Primary Facility | 2013-07-19 | Site Restoration | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2482696 | Primary Facility | 2016-05-10 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[8]