If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31089 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.739675,"lon":-79.601814,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: | |
Farm/Lease Name: THOMAS E JOHNSON ETUX | |
License Status: Active | |
Spud Date: 2013-08-07 | |
Permit Date: 2012-08-24 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.739675 | |
Longitude: -79.601814 |
Date | Event |
---|---|
2012-08-24 | New Permit Application |
2013-08-07 | Performed Spud Operation |
2013-08-12 | Drilling Completion |
2014-07-24 | Perforation |
2014-07-28 | Performed Stage 1 of Stimulation |
2014-07-28 | Performed Stage 2 of Stimulation |
2016-06-03 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-07-28 | 1 | Sand | 27,113 | 2,550 | 3,205 |
2014-07-28 | 2 | Sand | 27,113 | 2,700 | 3,136 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | MDS ENERGY LTD | 590.00 | 92 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 6,202.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 10,795.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 7,078.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 5,721.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 4,548.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 3,593.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | MDS ENERGY LTD | Drilling Fluid Waste | 180.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2014 | MDS ENERGY LTD | Fracing Fluid Waste | 367.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | MDS ENERGY LTD | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | MDS ENERGY LTD | Drilling Fluid Waste | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | MDS ENERGY LTD | Produced Fluid | 40 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2014 | MDS ENERGY LTD | Fracing Fluid Waste | 367 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | MDS ENERGY LTD | Drilling Fluid Waste | 60 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 60 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 32.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2164334 | Primary Facility | 2013-05-07 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained minimal fluids. |
2200281 | Primary Facility | 2013-08-30 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained drill cuttings, cement returns and minimal fluids. The drill pit had more than the required two feet of lined freeboard. |
2203669 | Primary Facility | 2013-09-11 | Drilling/Alteration | No Violations Noted | Conventional well (natural) producing off 7” x 2” swage. Small expression of gas where swage threaded into 7” collar. Pit lined and freeboard maintained. Discussed with Operator rep S. Baker about putting a working gauge on well to inspect 7” pressure. Well is constructed with 9 5/8” water/coal protective casing. |
2224482 | Primary Facility | 2013-11-25 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained drill cuttings, and what appeared to be frozen fluids. The drill pit had more than the required two feet of lined freeboard. |
2265882 | Primary Facility | 2014-04-23 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained drill cuttings, and what appeared to be frozen fluids. The drill pit had more than the required two feet of lined freeboard. It was noted that the 005-31193 Thomas Johnson 1M site had been constructed and the well drilled adjacent to the existing well-site. |
2301144 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Shared well-site with 005-31193 was in the process of being regraded and restored. |
2316971 | Primary Facility | 2014-10-29 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed. Well appeared to be equipped for production. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Shared well-site with 005-31193 had been regraded, seeded, mulched and the vegetative cover had achieved 70% uniform coverage. |
2463638 | Primary Facility | 2016-03-11 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-pumpjack-equipment-meter set-100 bbl tank look ok. |
2573197 | Primary Facility | 2017-03-20 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production-annulus open. Well head casing-pumpjack-equipment-100 bbl fiberglass tank look ok. |
2705071 | Primary Facility | 2018-03-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. Pump jack installed on well. |
For data sources see[8]