If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31123 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.775361,"lon":-79.619472,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 147445 | |
Farm/Lease Name: THOMAS W GRIMM ETUX 1M-47 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-02-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.775361 | |
Longitude: -79.619472 |
Date | Event |
---|---|
2013-02-07 | New Permit Application |
2013-03-14 | Performed Spud Operation |
2013-04-24 | Drilling Completion |
2013-06-18 | Perforation |
2014-04-14 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-06-19 | 2013-06-20 | 6,826 | 155,845 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 32.1519 | 0 |
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Monoethanolamine | Proprietary | 100 | 0.00160104 | 0 | |
Proprietary | Proprietary | 1 | 0.00160104 | 0 | ||||
Polymer | Proprietary | 1 | 0.00160104 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.000620974 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000901156 | 0 | ||||
Proprietary | Proprietary | 100 | 0.160106 | 0 | ||||
Solvent | Proprietary | 1 | 0.00160104 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.000138375 | 0 | ||||
Alkyl Phosphate Ether | Proprietary | 1 | 0.00160104 | 0 | ||||
Water | 7732-18-5 | 40 | 0.0445009 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000510045 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 100 | 0.00160104 | 0 | ||||
Proprietary | Proprietary | 50 | 0.00300538 | 0 | ||||
Water | 7732-18-5 | 80 | 0.00522968 | 0 | ||||
Water | 7732-18-5 | 60 | 0.00360577 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00001029 | 0 | ||||
Polymer | Proprietary | 10 | 0.0160104 | 0 | ||||
Proprietary | Proprietary | 2 | 0.00222544 | 0 | ||||
Water | 7732-18-5 | 50 | 0.0800531 | 0 | ||||
Water | 7732-18-5 | 87.5 | 0.164494 | 0 | ||||
Ammonium salts | Proprietary | 100 | 0.0320208 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.0166874 | 0 | ||||
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.0445009 | 0 | ||||
Demineralized Water | 7732-18-5 | 50 | 0.00038768 | 0 | ||||
Super 100 NE | Nabors Completion and Production Services | Surfactants & Foamers | 2-Butoxyethanol | 111-76-2 | 5 | 0.0071 | 0 | |
Isopropyl Alcohol | 67-63-0 | 40 | 0.056802 | 0 | ||||
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.021301 | 0 | ||||
Methyl Alcohol | 67-56-1 | 15 | 0.021301 | 0 | ||||
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Anionic Copolymer | Proprietary | 50 | 0.005771 | 0 | |
Propylene glycol | 57-55-6 | 50 | 0.005771 | 0 | ||||
Water | MDS Energy LTD | Water | Water | 7732-18-5 | 100 | 58.8574 | 0 | |
HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 16 | 0.031703 | 0 | |
Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 19.8088 | 0 | |
HCL Acid (0%-7.5%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0138447 | 0 | |
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Propargyl Alcohol | 107-19-7 | 40 | 0.000131 | 0 | |
Isopropyl Alcohol | 67-63-0 | 40 | 0.000131 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00003300 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000131 | 0 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.00004300 | 0 | ||||
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Mineral Spirits | 8052-41-3 | 10 | 0.010415 | 0 | |
Ethoxylated alcohols | 68002-97-1 | 4 | 0.004166 | 0 | ||||
Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.031244 | 0 | ||||
Propylene Glycol | 57-55-6 | 25 | 0.026036 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | Polyethlyene-Glycol | 25322-68-3 | 50 | 0.00322 | 0 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.001288 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | MDS ENERGY DEV LLC | 27,552.00 | 129 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY DEV LLC | 36,574.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 22,602.90 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 16,495.00 | 307 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 17,404.20 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 13,043.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 12,352.00 | 354 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | MDS ENERGY DEV LLC | Fracing Fluid Waste | 1,960.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | MDS ENERGY DEV LLC | Produced Fluid | 254.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | MDS ENERGY DEV LLC | Produced Fluid | 94.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | MDS ENERGY LTD | Produced Fluid | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2014 | MDS ENERGY DEV LLC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 110.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | MDS ENERGY DEV LLC | Produced Fluid | 110.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 29.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2132981 | Primary Facility | 2013-01-23 | Routine/Complete Inspection | No Violations Noted | E&S plan reviewed as a result of an OG-57 waiver application submitted by the operator for the proximity of the access road to the 100 year floodplain. An OG-57 is not required for this site because the well-site itself is not within the floodplain nor is the stream a solid blue lined stream as found on the most recent 7 1/2 minute topographical map. The E&S plan as outlined should effectively minimize accelerated erosion and sedimenation provided the plan is properly implemented and maintained. |
2137428 | Primary Facility | 2013-02-04 | Routine/Complete Inspection | No Violations Noted | Subsequent to previous inspection, it was determined that the adjacent stream is depicted with a solid blue line by USGS in on-line maps. Accordingly, site was inspected based on operator's OG-57 waiver request. The operator has re-routed a portion of the access road from previous plans minimizing potential erosion and sediment issues. If the E&S plan is implemented as designed with E&S controls properly installed, no accelerated erosion or off-site transport of sediment is anticipated. |
2146218 | Primary Facility | 2013-02-27 | Routine/Complete Inspection | No Violations Noted | At the time of this pre-operational inspection all perimeter E&S controls appeared to be properly installed. The on-site E&S plan appeared to be adequate. No erosion issues were evident. |
2149773 | Primary Facility | 2013-03-15 | Drilling/Alteration | No Violations Noted | First Class Energy rig#11 RD20 spudding in well at time of inspection. Pit lined and freeboard maintained. |
2161276 | Primary Facility | 2013-04-24 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit located onsite and it contained drill cuttings and fluids. Pit had more than the required two feet of lined freeboard. It was noted that the diesel tank located onsite had the neccesary secondary containment. |
2162565 | Primary Facility | 2013-04-30 | Drilling/Alteration | No Violations Noted | Nabors Completion & Production Services moving off location after logging well at time of inspection. Waiting on frac. Pit lined and freeboard maintained. |
2178223 | Primary Facility | 2013-06-26 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Drill pit pit had been reclaimed. Tanker truck was onsite to empty the two baker tanks located onsite. There was no evidence of accelerated erosion or sedimentation related to the site or access road at the time of the inspection. The Department recommends that the operator inspect the access road and site erosion controls afte the recent strom activity in the area to insure that the controls do not require any repairs or maintenance. |
2196972 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no evidence of accelerated erosion related to the access road at the time of the inspection. There was a minor erosion issue noted in the fill slope after the outlet of the collection ditch. Specfically runoff conveyed from the ditch had begun to erode a channel in the fill slope up to the silt sock perimeter E&S control. The Department recommends that the operator address this issue as soon as possible so that it does not develop into a more serious erosion issue. |
2231752 | Primary Facility | 2013-12-23 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been effectively restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2306102 | Primary Facility | 2014-09-23 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Vegetative cover met the 70% uniform coverage. |
2482300 | Primary Facility | 2016-05-06 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[8]