If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.594208,"lon":-79.412161,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Bend Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 147239 | |
Farm/Lease Name: SPRING CHURCH UNIT 3H | |
License Status: Active | |
Spud Date: 2013-12-18 | |
Permit Date: 2013-11-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.594208 | |
Longitude: -79.412161 |
Date | Event |
---|---|
2013-11-04 | New Permit Application |
2013-12-15 | Performed Spud Operation |
2014-05-22 | Drilling Completion |
2014-11-11 | Perforation |
2014-11-11 | Performed Stage 1 of Stimulation |
2014-11-12 | Perforation |
2014-11-12 | Performed Stage 2 of Stimulation |
2014-11-12 | Performed Stage 3 of Stimulation |
2014-11-15 | Perforation |
2014-11-15 | Performed Stage 4 of Stimulation |
2014-11-22 | Perforation |
2014-11-22 | Performed Stage 5 of Stimulation |
2014-11-22 | Performed Stage 6 of Stimulation |
2014-11-23 | Perforation |
2014-11-23 | Performed Stage 7 of Stimulation |
2014-11-23 | Performed Stage 8 of Stimulation |
2014-11-25 | Perforation |
2014-11-25 | Performed Stage 9 of Stimulation |
2014-11-26 | Perforation |
2014-11-26 | Performed Stage 10 of Stimulation |
2014-11-28 | Perforation |
2014-11-28 | Performed Stage 11 of Stimulation |
2014-11-29 | Perforation |
2014-11-29 | Performed Stage 12 of Stimulation |
2014-11-30 | Perforation |
2014-11-30 | Performed Stage 13 of Stimulation |
2014-11-30 | Performed Stage 14 of Stimulation |
2014-12-02 | Perforation |
2014-12-02 | Performed Stage 15 of Stimulation |
2014-12-03 | Perforation |
2014-12-03 | Performed Stage 16 of Stimulation |
2016-06-20 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-11 | 2014-12-03 | 8,000 | 4,883,860 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00009787 | 0 |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.00214538 | 0 | |
B466 | Schlumberger | Friction Reducer | Alcohol Ethoxylates | Proprietary | 5 | 0.00066703 | 0 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00400216 | 0 | ||||
Ammonium Acetate | 631-61-8 | 6 | 0.00080043 | 0 | ||||
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 9.51582 | 0 | |
15% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 15 | 0.010218 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Aliphatic acids | Proprietary | 30 | 0.00003426 | 0 | |
Methanol | 67-56-1 | 40 | 0.00004569 | 0 | ||||
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003426 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001142 | 0 | ||||
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00157507 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00013126 | 0 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00078754 | 0 | ||||
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00222022 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00085404 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00022106 | 0 | |
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 90.3389 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-11-11 | 1 | OTTAWA | 3,330,353 | 8,940 | 9,400 |
2014-11-12 | 2 | OTTAWA | 3,330,353 | 8,918 | 9,414 |
2014-11-12 | 3 | OTTAWA | 3,330,353 | 8,713 | 9,394 |
2014-11-15 | 4 | OTTAWA | 3,330,353 | 8,744 | 9,325 |
2014-11-22 | 5 | OTTAWA | 3,330,353 | 8,477 | 9,379 |
2014-11-22 | 6 | OTTAWA | 3,330,353 | 8,496 | 9,163 |
2014-11-23 | 7 | OTTAWA | 3,330,353 | 8,717 | 9,330 |
2014-11-23 | 8 | OTTAWA | 3,330,353 | 8,729 | 9,230 |
2014-11-25 | 9 | OTTAWA | 3,330,353 | 8,198 | 9,309 |
2014-11-26 | 10 | OTTAWA | 3,330,353 | 9,049 | 9,268 |
2014-11-28 | 11 | OTTAWA | 3,330,353 | 8,795 | 9,593 |
2014-11-29 | 12 | OTTAWA | 3,330,353 | 8,759 | 9,676 |
2014-11-30 | 13 | OTTAWA | 3,330,353 | 8,839 | 9,240 |
2014-11-30 | 14 | OTTAWA | 3,330,353 | 8,621 | 9,440 |
2014-12-02 | 15 | OTTAWA | 3,330,353 | 8,470 | 9,333 |
2014-12-03 | 16 | OTTAWA | 3,330,353 | 8,504 | 9,144 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 603,624.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 389,298.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 260,480.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 183,007.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 160,501.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,052.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 300.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 142.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 177.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1,136.14 Tons | LANDFILL | 100434 |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 48.94 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 37.02 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 12,037.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,580.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 16,689.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,792.68 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,036.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 16,601.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 467.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,868.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | 169.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 169.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | 1,583.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 | |
2017 | CHEVRON APPALACHIA LLC | 16,601.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 | |
2017 | CHEVRON APPALACHIA LLC | 558.00 Bbl | REUSE (AT WELL PAD) | ||
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 115.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,190.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 694.17 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 225.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,531.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 112.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,250.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 180.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2231588 | Primary Facility | 2013-12-17 | Drilling/Alteration | No Violations Noted | drilling conductor 20' |
2232874 | Primary Facility | 2013-12-27 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. Site construction had been completed and the site and access road erosion controls had been implemented as outlined in the E&S included within the ESCGP. There was no observed accelerated erosion or sedimentation. |
2234533 | Primary Facility | 2014-01-06 | Drilling/Alteration | No Violations Noted | rigging up on pad |
2235554 | Primary Facility | 2014-01-09 | Drilling/Alteration | No Violations Noted | awaiting rig |
2238406 | Primary Facility | 2014-01-14 | Drilling/Alteration | No Violations Noted | WOC at time of inspection |
2263821 | Primary Facility | 2014-04-08 | Routine/Complete Inspection | No Violations Noted | awaiting rig to resume drilling; preparing matting boards to go over existing containment; no additional info. available |
2263833 | Primary Facility | 2004-04-16 | Routine/Complete Inspection | No Violations Noted | awaiting rig to resume drilling |
2273536 | Primary Facility | 2014-05-13 | Drilling/Alteration | No Violations Noted | WOC; @ 2660' |
2273550 | Primary Facility | 2014-05-22 | Drilling/Alteration | No Violations Noted | @ 11,261' drilling with fluid |
2308415 | Primary Facility | 2014-09-30 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Secondary containment construction was underway for the constructed AST's located on the secondary pad adjacent to the primary pad where the well heads are located. All access road and site erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation. |
2334507 | Primary Facility | 2015-01-09 | Routine/Complete Inspection | No Violations Noted | Work was ongoing and equipment was onsite to continue equipping the well for production. The were two constructed AST's for fluid containment located on a secondary pad along a shared access road with the well pad. There was no observed accelerated erosion or sedimentation in relation to the well-site. |
2352629 | Primary Facility | 2015-03-16 | Routine/Complete Inspection | No Violations Noted | Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2375541 | Primary Facility | 2015-06-02 | Routine/Complete Inspection | No Violations Noted | Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2433913 | Primary Facility | 2015-12-17 | Routine/Complete Inspection | No Violations Noted | Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2445864 | Primary Facility | 2016-02-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-equipement-production unit-tanks-dike all look ok. |
2489938 | Primary Facility | 2016-06-03 | Routine/Complete Inspection | No Violations Noted | Drilling and well stimualtion acitivities had been completed, well appeared to be equipped for production.. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2549277 | Primary Facility | 2016-12-29 | Routine/Complete Inspection | No Violations Noted | Earthwork to bring the site into agreement with the PCSM plan had been completed. The disturbed areas had been stabilized with seed and mulch with the vegetation beginning to emerge. The vegetation had not yet attained 70% uniform coverage. There was no observed accelerated erosion or sedimentation. Brine tanks located onsite and they appeared to be in sound condition. |
2595909 | Primary Facility | 2017-05-19 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment look ok. |
2668636 | Primary Facility | 2017-12-06 | Site Restoration | No Violations Noted | At time of inspection, wells 1H and 3H drilled and appear equipped for production. |
2748718 | Primary Facility | 2018-07-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2749030 | Primary Facility | 2018-07-05 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, wells 3H and 1H are both drilled and appear equipped for production. |
For data sources see[9]