If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7052,"lon":-79.549475,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Bethel Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 150923 | |
Farm/Lease Name: THOMAS HALL | |
License Status: Active | |
Spud Date: 2014-03-27 | |
Permit Date: 2014-03-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.7052 | |
Longitude: -79.549475 |
Date | Event |
---|---|
2014-03-04 | New Permit Application |
2014-03-26 | Performed Spud Operation |
2014-05-15 | Drilling Completion |
2014-12-04 | Perforation |
2014-12-07 | Performed Stage 1 of Stimulation |
2014-12-08 | Performed Stage 2 of Stimulation |
2016-06-21 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-12-07 | 2014-12-08 | 6,998 | 688,564 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL Acid 18% | Nabors Completion and Production Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 18 | 0.014155 | 0 |
Super MAX II | Nabors Completion and Production Services | Surfactants & Foamers | Propylene Glycol n-butyl ether | 5131-66-8 | 5 | 0.004057 | 0 | |
Oxirane, methyl-, polymer with oxirane, mono(2-ethylhexyl) ether |
64366-70-7 | 13 | 0.010549 | 0 | ||||
Propylene Glycol | 57-55-6 | 30 | 0.024343 | 0 | ||||
1-Octanol | 111-87-5 | 2.5 | 0.002029 | 0 | ||||
Orange Sweet Oil | 8028-48-6 | 5 | 0.004057 | 0 | ||||
1-Decanol | 112-30-1 | 2.5 | 0.002029 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 5 | 0.004057 | 0 | ||||
Water | MDS Energy Development LLC | Water | Water | 7732-18-5 | 100 | 90.2448 | 0 | |
Super TSC 2 LT | Nabors Completion and Production Services | Paraffin & Scale Additives | Bis(hexamethylene triaminepenta (methylenephosphonic acid)) |
Proprietary | 10 | 0.000889 | 0 | |
HCL Acid 7.5% | Nabors Completion and Production Services | Bulk Acid | hydrogen chloride | 7647-01-0 | 7 | 0.005505 | 0 | |
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Propylene glycol | 57-55-6 | 50 | 0.011223 | 0 | |
DETA-Methylene Phosphonic Acid | 15827-60-8 | 25 | 0.005611 | 0 | ||||
AQUCAR DB 20 | Nabors Completion and Production Services | Biocides | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 20 | 0.002283 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 3 | 0.000342 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 54.5 | 0.006221 | 0 | ||||
Sodium bromide | 7647-15-6 | 4 | 0.000457 | 0 | ||||
WFR-6W | Nabors Completion and Production Services | Friction Reducer | Anionic Water-Soluble Polymer Emulsion | Proprietary | 100 | 0.066743 | 0 | |
Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 9.39753 | 0 | |
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Isopropyl Alcohol | 67-63-0 | 40 | 0.000156 | 0 | |
Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.00005100 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000156 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00003900 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 40 | 0.000156 | 0 | ||||
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Water | 7732-18-5 | 48 | 0.00006904 | 0 | |
Water | 7732-18-5 | 40 | 0.0294837 | 0 | ||||
Water | 7732-18-5 | 85 | 0.0664364 | 0 | ||||
2,2-Dibromomalonamide | 73003-80-2 | 1 | 0.000126067 | 0 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.00009805 | 0 | ||||
Proprietary | Proprietary | 10 | 0.00001401 | 0 | ||||
Water | 7732-18-5 | 32 | 0.00403415 | 0 | ||||
Isoparaffinic Solvent | 64742-47-8 | 26 | 0.0191642 | 0 | ||||
Monobromo-3-nitrilopropionamide | 1113-55-9 | 1 | 0.000126067 | 0 | ||||
Water | 7732-18-5 | 50 | 0.0445718 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00007404 | 0 | ||||
Ethylene Glycol | 107-21-1 | 4 | 0.00294857 | 0 | ||||
Proprietary | Proprietary | 0.02 | 0 | 0 | ||||
Surfactant Blend | Proprietary | 3 | 0.00221118 | 0 | ||||
Copolymer | Proprietary | 100 | 0.0737093 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.00001901 | 0 | ||||
Proprietary | Proprietary | 100 | 0.0178285 | 0 | ||||
Proprietary | Proprietary | 0.2 | 0.000178095 | 0 | ||||
Water | 7732-18-5 | 90 | 0.00883571 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00000100 | 0 | ||||
Ethoxylated alcohols | Proprietary | 4 | 0.00294857 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-12-07 | 1 | SAND | 666,010 | 5,680 | 6,153 |
2014-12-08 | 2 | SAND | 666,010 | 5,828 | 6,223 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | MDS ENERGY DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 28,196.20 | 144 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 20,990.80 | 204 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 11,465.00 | 236 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 17,982.00 | 318 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | MDS ENERGY DEV LLC | Drilling Fluid Waste | 576.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | MDS ENERGY DEV LLC | Fracing Fluid Waste | 6,028.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | MDS ENERGY DEV LLC | Fracing Fluid Waste | 180.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 94.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | MDS ENERGY DEV LLC | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2246188 | Primary Facility | 2014-02-12 | Routine/Complete Inspection | No Violations Noted | adding special permit conditions due to proximity of the residence |
2256457 | Primary Facility | 2014-03-25 | Routine/Complete Inspection | No Violations Noted | Pre-operational inspection. Site construction had been completed. Site and access road had been constructed as outlined in the E&S plan and all E&S controls had been implemented properly. There was no observed accelerated erosion or sedimentation. |
2267959 | Primary Facility | 2014-05-02 | Drilling/Alteration | No Violations Noted | 23' of 20" installed 3-27-14; no equipment on site to resume drilling at time of inspection |
2269472 | Primary Facility | 2014-05-06 | Drilling/Alteration | No Violations Noted | Installing 13 3/8" casing ; w/in Logansport mine |
2304593 | Primary Facility | 2014-09-17 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Well was not equipped for production. Drill pit had been regraded. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2358418 | Primary Facility | 2015-04-03 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Site had been regraded, seeded & mulched. The vegetation had not begun to emerge and take hold. A site restoration extension had been previously requested and granted extending the restoration deadline until June 30, 2015. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition. It was noted that through much of the winter months the gas well site was not accessible via the access road due to weather conditions. The Department recommends that the operator take into consideration the accessibility of the well-site should an emergency occur and have the access road cleared in future winter months to insure accesibility in an emergency situation. |
2402446 | Primary Facility | 2015-08-27 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Site had been regraded and effectively stabilized. Brine tanks located onsite and they appeared to be in sound condition. |
2428907 | Primary Facility | 2015-11-30 | Routine/Complete Inspection | No Violations Noted | Frac valve/equipment on well for flow back. Equipment/E&S/well site look good. |
2571512 | Primary Facility | 2017-03-15 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2798813 | Primary Facility | 2018-11-06 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.
NOTE: I contacted operator by phone to request a bit of housekeeping at this well. |
For data sources see[9]