If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31212 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7559,"lon":-79.666069,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152214 | |
Farm/Lease Name: FRANTZ UNIT | |
License Status: Active | |
Spud Date: 2014-08-08 | |
Permit Date: 2014-06-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.7559 | |
Longitude: -79.666069 |
Date | Event |
---|---|
2014-06-18 | New Permit Application |
2014-08-05 | Performed Spud Operation |
2014-10-08 | Drilling Completion |
2015-04-20 | Perforation |
2015-04-21 | Perforation |
2015-04-21 | Performed Stage 1 of Stimulation |
2015-04-21 | Performed Stage 2 of Stimulation |
2015-04-22 | Perforation |
2015-04-22 | Performed Stage 3 of Stimulation |
2015-04-22 | Performed Stage 4 of Stimulation |
2015-04-23 | Perforation |
2015-04-23 | Performed Stage 5 of Stimulation |
2015-04-23 | Performed Stage 6 of Stimulation |
2015-04-24 | Perforation |
2015-04-24 | Performed Stage 7 of Stimulation |
2015-04-24 | Performed Stage 8 of Stimulation |
2015-04-25 | Perforation |
2015-04-25 | Performed Stage 10 of Stimulation |
2015-04-25 | Performed Stage 9 of Stimulation |
2015-04-27 | Perforation |
2015-04-27 | Performed Stage 11 of Stimulation |
2015-04-27 | Performed Stage 12 of Stimulation |
2015-04-28 | Performed Stage 13 of Stimulation |
2015-04-29 | Perforation |
2015-04-29 | Performed Stage 14 of Stimulation |
2015-04-30 | Perforation |
2015-04-30 | Performed Stage 15 of Stimulation |
2015-04-30 | Performed Stage 16 of Stimulation |
2015-05-01 | Perforation |
2015-05-01 | Performed Stage 17 of Stimulation |
2015-05-02 | Perforation |
2015-05-02 | Performed Stage 18 of Stimulation |
2015-05-02 | Performed Stage 19 of Stimulation |
2015-05-04 | Perforation |
2015-05-04 | Performed Stage 20 of Stimulation |
2015-05-04 | Performed Stage 21 of Stimulation |
2015-05-04 | Performed Stage 22 of Stimulation |
2015-05-05 | Perforation |
2015-05-05 | Performed Stage 23 of Stimulation |
2015-05-05 | Performed Stage 24 of Stimulation |
2015-05-05 | Performed Stage 25 of Stimulation |
2016-06-21 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-04-21 | 2015-05-05 | 6,630 | 8,713,530 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KR-153SL | Nabors Completion and Production Services | Biocides | Polyethlyene-Glycol | 25322-68-3 | 50 | 0.00533879 | 0 |
Water | 7732-18-5 | 55 | 0.00586725 | 0 | ||||
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00213552 | 0 | ||||
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00022161 | 0 | |
2-Butoxyethanol | 111-76-2 | 20 | 0.00044322 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 20 | 0.00044322 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 20 | 0.00044322 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000332415 | 0 | ||||
PA Specific 40/70 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Titanium Oxide | 13463-67-7 | 0.1 | 0.00303606 | 0 | |
Iron Oxide | 1309-37-1 | 0.1 | 0.00303606 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.03291 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.0333956 | 0 | ||||
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Anionic Polyacrylamide | 910644-97-2 | 40 | 0.0265529 | 0 | |
Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.0199147 | 0 | ||||
Propylene Glycol | 57-55-6 | 15 | 0.00995734 | 0 | ||||
Water | 7732-18-5 | 40 | 0.0265529 | 0 | ||||
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00331911 | 0 | ||||
Proprietary | Proprietary | 2 | 0.00132765 | 0 | ||||
Ethoxylated alcohols | 68002-97-1 | 15 | 0.00995734 | 0 | ||||
Water | XTO Energy/ExxonMobil | Water | Water | 7732-18-5 | 100 | 90.261 | 0 | |
HCl Acid (0-7.5%), 22 Baume | Nabors Completion and Production Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0513531 | 0 | |
Water | 7732-18-5 | 92.5 | 0.632728 | 0 | ||||
HCl Acid (12.5-18.0%), 22 Baume | Nabors Completion and Production Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 18 | 0.0861429 | 0 | |
Water | 7732-18-5 | 87.5 | 0.418751 | 0 | ||||
Acid Inhibitor 2 (Al-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Proprietary | Proprietary | 0.99 | 0.00002214 | 0 | |
Proprietary | Proprietary | 0.02 | 0 | 0 | ||||
Water | 7732-18-5 | 48 | 0.00106277 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.00088564 | 0 | ||||
PA Specific 30/50 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Aluminum Oxide | 1344-28-1 | 1.1 | 0.0679195 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.16831 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00617486 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00617486 | 0 | ||||
Super TSC LTE | Nabors Completion and Production Services | Scale Inhibitor | Proprietary | Proprietary | 8 | 0.00142378 | 0 | |
Proprietary | Proprietary | 25 | 0.00445045 | 0 | ||||
Water | 7732-18-5 | 99 | 0.0176247 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-04-21 | 1 | SAND | 6,179,780 | 7,789 | 6,224 |
2015-04-21 | 2 | SAND | 6,179,780 | 7,530 | 5,960 |
2015-04-22 | 3 | SAND | 6,179,780 | 7,282 | 4,750 |
2015-04-22 | 4 | SAND | 6,179,780 | 7,096 | 4,685 |
2015-04-23 | 5 | SAND | 6,179,780 | 7,360 | 4,713 |
2015-04-23 | 6 | SAND | 6,179,780 | 7,527 | 5,843 |
2015-04-24 | 7 | SAND | 6,179,780 | 7,591 | 5,657 |
2015-04-24 | 8 | SAND | 6,179,780 | 7,757 | 6,351 |
2015-04-25 | 9 | SAND | 6,179,780 | 7,950 | 6,884 |
2015-04-25 | 10 | SAND | 6,179,780 | 7,889 | 5,278 |
2015-04-27 | 11 | SAND | 6,179,780 | 7,896 | 5,717 |
2015-04-27 | 12 | SAND | 6,179,780 | 7,480 | 5,470 |
2015-04-28 | 13 | SAND | 6,179,780 | 6,951 | 5,820 |
2015-04-29 | 14 | SAND | 6,179,780 | 7,316 | 5,518 |
2015-04-30 | 15 | SAND | 6,179,780 | 6,923 | 4,756 |
2015-04-30 | 16 | SAND | 6,179,780 | 6,777 | 5,510 |
2015-05-01 | 17 | SAND | 6,179,780 | 7,109 | 5,564 |
2015-05-02 | 18 | SAND | 6,179,780 | 7,239 | 5,501 |
2015-05-02 | 19 | SAND | 6,179,780 | 7,201 | 4,981 |
2015-05-04 | 20 | SAND | 6,179,780 | 7,382 | 4,806 |
2015-05-04 | 21 | SAND | 6,179,780 | 7,122 | 5,002 |
2015-05-04 | 22 | SAND | 6,179,780 | 6,789 | 3,977 |
2015-05-05 | 23 | SAND | 6,179,780 | 7,316 | 4,988 |
2015-05-05 | 24 | SAND | 6,179,780 | 7,181 | 5,150 |
2015-05-05 | 25 | SAND | 6,179,780 | 6,870 | 5,850 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 548,590.00 | 252 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 1,477,822.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 1,042,775.22 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 725,733.90 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 484.52 Tons | LANDFILL | 100434 |
2015 | XTO ENERGY INC | Fracing Fluid Waste | 1,320.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 2,642.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 664.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 1,433.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 243.12 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 107.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 711.60 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | 4,229.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 | |
2017 | XTO ENERGY INC | Produced Fluid | 750.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | 630.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | |
2017 | XTO ENERGY INC | Produced Fluid | 5,119.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 3,101.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 888.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 223.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 186.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2294445 | Primary Facility | 2014-08-07 | Drilling/Alteration | No Violations Noted | Cellar set and well not spud in at time of inspection. |
2296960 | Primary Facility | 2014-08-20 | Drilling/Alteration | No Violations Noted | First Class Energy rig#8 RD20 drilling at 574’ at time of inspection. |
2301150 | Primary Facility | 2014-09-03 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. Roll-off boxes used for storage of drill cuttings until transport to a landfill were stored onsite as were 6 Baker Tanks. All equipment left onsite was located on secondary containment. All site and access road erosion controls had been implemented as outlined in the E&S plan and had been properly maintained. |
2316072 | Primary Facility | 2014-10-27 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed and there was no ongoing well development activity or equipment located onsite. There was no observed evidence of any spills or discharges on the well-site and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2330959 | Primary Facility | 2014-12-19 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed and there was no ongoing well development activity or equipment located onsite. There was no observed evidence of any spills or discharges on the well-site and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2376844 | Primary Facility | 2015-06-08 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well was not equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2400254 | Primary Facility | 2015-08-19 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well was in the process of being equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2419465 | Primary Facility | 2015-10-26 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been effectively and properly restored to PCSM as part of the approved ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or acces road and all the vegetation had attained 70% uniform cover |
2491289 | Primary Facility | 2016-06-07 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment and tank-dike looked ok. |
2539741 | Primary Facility | 2016-11-29 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for and in production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or acces road and all the vegetation had attained 70% uniform cover |
2605236 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank and other production apparatus located onsite within containment. Both the containment and the tank and appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road. All PCSM controls were functioning properly. |
2680681 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
2766504 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and steel fluid collection tank look ok. |
For data sources see[9]