If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31230 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.860614,"lon":-79.539294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 151874 | |
Farm/Lease Name: AMBROSE | |
License Status: | |
Spud Date: 2015-03-12 | |
Permit Date: 2015-02-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.860614 | |
Longitude: -79.539294 |
Date | Event |
---|---|
2015-02-23 | New Permit Application |
2015-03-12 | Drilling Completion |
2015-03-12 | Performed Spud Operation |
2015-04-29 | Drilling Completion |
2015-07-04 | Drilling Completion |
2015-08-17 | Perforation |
2016-06-03 | Deviated |
2016-06-03 | DRILLED DEEPER |
2016-06-03 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-10 | 2015-09-29 | 6,473 | 16,955,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BIOCLEAR 2000 | Weatherford | Biocide | 2, 2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.00290434 | 4610.73 |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00300454 | 4769.8 | |
AI 600P | Weatherford | Acid Inhibitor | Cinnamaldehyde | 104-55-2 | 15 | 0.000231435 | 367.41 | |
Dimethylformamide | 68-12-2 | 20 | 0.00030858 | 489.88 | ||||
1-Decanol | 112-30-1 | 5 | 0.00007714 | 122.47 | ||||
Nonyl Phenol Ethoxylate, Branched | 127087-87-0 | 15 | 0.000231435 | 367.41 | ||||
Pyridine, alkyl derives., quaternized with benzyl chloride | 68909-18-2 | 15 | 0.000231435 | 367.41 | ||||
1-Octanol | 111-87-5 | 5 | 0.00007714 | 122.47 | ||||
Alkyl Pyridine | 68391-11-7 | 1 | 0.00001543 | 24.494 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000617159 | 979.76 | ||||
Methanol | 67-56-1 | 2.5 | 0.00003857 | 61.235 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00003857 | 61.235 | ||||
2-Butoxyethanol | 111-76-2 | 5 | 0.00007714 | 122.47 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline Silica, Quartz | 14808-60-7 | 100 | 10.1312 | 16,083,600.0 | |
LEB 10X | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00000593 | 9.407 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.000608697 | 966.326 | |
PGS-214 | Rockwater | Guar Slurry | PGS-214 | Proprietary | 100 | 0.000138364 | 219.657 | |
Water | Snyder Brothers Inc | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.1264 | 141,491,000.0 | |
Hydrochloric Acid (15%) | FSTI | Acid | HCL | 7647-01-0 | 15 | 0.0946699 | 150292 | |
FFR 730 | Nalco | Friction Reducer | Oxyalkylated alcohol A | Proprietary | 5 | 0.00378222 | 6004.4 | |
SCALE CLEAR 125W | Weatherford | Scale Inhibitor | Phosphonomethylated polyamine, cmpd. with substituted amine Proprietary 5 - 15 |
Proprietary | 15 | 0.00110407 | 1752.74 | |
Ammonium Chloride | 12125-02-9 | 2.5 | 0.000184011 | 292.124 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.00441627 | 7010.97 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | SNYDER BROS INC | 186,785.00 | 29 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 1,154,983.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,284,056.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,013,519.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 540,541.00 | 271 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | SNYDER BROS INC | Fracturing Fluid Waste | 56.45 Tons | LANDFILL | 100585 |
2015 | SNYDER BROS INC | Produced Fluid | 945.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SNYDER BROS INC | Drill Cuttings | 709.95 Tons | LANDFILL | SWF 1025 |
2015 | SNYDER BROS INC | Drill Cuttings | 367.52 Tons | LANDFILL | 100585 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 12,675.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 12,675.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Produced Fluid | 3,383.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 1,555.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SNYDER BROS INC | Produced Fluid | 3,383.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | SNYDER BROS INC | Produced Fluid | 5,155.66 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | SNYDER BROS INC | Produced Fluid | 1,136.90 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | SNYDER BROS INC | Produced Fluid | 1,587.30 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | SNYDER BROS INC | Produced Fluid | 217.80 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3692 |
2016 | SNYDER BROS INC | Produced Fluid | 1,488.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SNYDER BROS INC | Produced Fluid | 2,958.31 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | SNYDER BROS INC | Produced Fluid | 2,644.90 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Produced Fluid | 12,465.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SNYDER BROS INC | Produced Fluid | 5,155.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2017 | SNYDER BROS INC | Produced Fluid | 89.90 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2017 | SNYDER BROS INC | 8,609.18 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | Produced Fluid | 5,982.43 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | 4,048.28 Bbl | REUSE (AT WELL PAD) | ||
2017 | SNYDER BROS INC | Produced Fluid | 1,179.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 10,912.99 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 1,151.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 14,423.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 264.20 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SNYDER BROS INC | Produced Fluid | 5,155.80 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 1,191.60 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2352699 | Primary Facility | 2015-03-16 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed,the impoundment was properly lined and it contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2354586 | Primary Facility | 2015-03-19 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence tophole drilling. |
2366667 | Primary Facility | 2015-04-24 | Drilling/Alteration | No Violations Noted | First Class Energy rig#1 Schramm TXD 200 Trailer Mounted drilling at 557’ at time of inspection. Closed loop system being utilized. |
2366833 | Primary Facility | 2015-04-29 | Drilling/Alteration | No Violations Noted | First Class Energy rig#1 Schramm TXD 200 Trailer Mounted drilling at 5700’ at time of inspection. Closed loop system being utilized. Department site visit w/WQS S. Foulk and C. Witham. |
2368648 | Primary Facility | 2015-05-11 | Routine/Complete Inspection | No Violations Noted | Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2377861 | Primary Facility | 2015-06-09 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2382200 | Primary Facility | 2015-06-22 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2390256 | Primary Facility | 2015-07-16 | Routine/Complete Inspection | No Violations Noted | Drill rig located onsite, drilling was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2441963 | Primary Facility | 2016-01-20 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2442052 | Primary Facility | 2016-01-19 | Routine/Complete Inspection | No Violations Noted | 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok. |
2443548 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production units-equipment-tank battery-dike look ok. |
2480495 | Primary Facility | 2016-05-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2538007 | Primary Facility | 2016-11-18 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2583510 | Primary Facility | 2017-04-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok. |
2589369 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids. |
2674090 | Primary Facility | 2017-12-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 5H drilled and appears equipped for production. Wells 2H, 1H, 3H, 4H, 6H also drilled and appear equipped for production. |
2683777 | Primary Facility | 2018-01-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 5H drilled and appears equipped for production. Wells 1H, 2H, 3H, 4H, 6H also drilled and appear equipped for production. |
2709945 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2771436 | Primary Facility | 2018-09-06 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment. |
2798054 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok. |
2821109 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2847434 | Primary Facility | 2019-02-26 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 401 psi and the casing pressure was 662 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad. |
For data sources see[8]