{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.851283,"lon":-79.544428,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 152962 | |
Farm/Lease Name: FURNACE RUN | |
License Status: Active | |
Spud Date: 2016-03-13 | |
Permit Date: 2015-09-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.851283 | |
Longitude: -79.544428 |
Date | Event |
---|---|
2015-09-02 | New Permit Application |
2016-01-20 | Performed Spud Operation |
2016-01-21 | Drilling Completion |
2016-02-25 | Drilling Completion |
2019-06-11 | Newly Drilled |
2019-06-11 | Skidded Rig |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-06-13 | 2016-07-03 | 6,509 | 13,058,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FR-16FW | Keane | Friction Reducer | Ammonium chloride | 12125-02-9 | 1.5 | 0.000458097 | 560.661 |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000305398 | 373.774 | ||||
distillates (petroleum), hydrotreated light | 64742-47-8 | 17.5 | 0.00534447 | 6541.05 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000458097 | 560.661 | ||||
Water | 7732-18-5 | 55 | 0.0167969 | 20557.6 | ||||
AI-600P | Weatherford | Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 3 | 0.00004808 | 58.842 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00048078 | 588.423 | ||||
1-Decanol | 112-30-1 | 3 | 0.00004808 | 58.842 | ||||
Alkyl Pyridine | 68391-11-7 | 0.6 | 0.00000881 | 10.788 | ||||
Dimethylformamide | 68-12-2 | 15 | 0.00024039 | 294.211 | ||||
1-Octanol | 111-87-5 | 3 | 0.00004808 | 58.842 | ||||
Nonyl Phenol Ethoxylate, Branched | 127087-87-0 | 10 | 0.00016026 | 196.141 | ||||
Triethyl Phosphate | 78-40-0 | 1.8 | 0.00002805 | 34.325 | ||||
Methanol | 67-56-1 | 1.8 | 0.00002805 | 34.325 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00016026 | 196.141 | ||||
Pyridine, alkyl derives, quaternized with Benzyl chloride | 68909-18-2 | 10 | 0.00016026 | 196.141 | ||||
Hydrochloric Acid (15%) | FSTI | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.099013 | 121181 | |
Water | 7732-18-5 | 75 | 0.495065 | 605905 | ||||
Water | Snyder Brothers | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.0398 | 108,975,000.0 | |
FFR730 | NALCO | Friction Reducer | Oxyalkylated alcohol | Proprietary | 3 | 0.00117893 | 1442.88 | |
FEAC-30 | Keane | Iron Control | Acetic Acid | 64-19-7 | 45 | 0.00100895 | 1234.84 | |
Citric Acid | 77-92-9 | 27.5 | 0.000616578 | 754.624 | ||||
Sand (Proppant) | Keane | Proppant | Crystallilne silica | 14808-60-7 | 100 | 10.2001 | 12,483,800.0 | |
EC6330a | NALCO | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 3 | 0.000281319 | 344.304 | |
Sodium Phosphate, Tribasic | 7601-54-9 | 3 | 0.000281319 | 344.304 | ||||
K-139 | NALCO | Biocide | Ethanol | 64-17-5 | 3 | 0.000507977 | 621.708 | |
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.5 | 0.00126994 | 1554.27 | ||||
Glutaraldehyde | 111-30-8 | 3 | 0.000507977 | 621.708 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | SNYDER BROS INC | 352,474.00 | 67 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,078,555.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 728,546.00 | 280 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 692,421.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | SNYDER BROS INC | Drill Cuttings | 1,163.42 Tons | LANDFILL | 100585 |
2016 | SNYDER BROS INC | Fracturing Fluid Waste | 35.85 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | SNYDER BROS INC | Produced Fluid | 4,140.42 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SNYDER BROS INC | Fracturing Fluid Waste | 5,582.01 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SNYDER BROS INC | Produced Fluid | 79.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | SNYDER BROS INC | Fracturing Fluid Waste | 3,880.78 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Drilling Fluid Waste | 230.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SNYDER BROS INC | Produced Fluid | 145.95 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2016 | SNYDER BROS INC | Produced Fluid | 2,316.53 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | SNYDER BROS INC | Produced Fluid | 5,979.15 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | SNYDER BROS INC | Fracturing Fluid Waste | 54.44 Tons | LANDFILL | 100585 |
2016 | SNYDER BROS INC | Produced Fluid | 238.13 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Synthetic Liner Materials | 7.02 Tons | LANDFILL | 100585 |
2016 | SNYDER BROS INC | Fracturing Fluid Waste | 2,776.67 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 6,990.29 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | Produced Fluid | 70.40 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2017 | SNYDER BROS INC | 12,509.34 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 33.29 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 | |
2017 | SNYDER BROS INC | 6,375.78 Bbl | REUSE (AT WELL PAD) | ||
2017 | SNYDER BROS INC | 13.67 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Produced Fluid | 933.29 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Waste Water Treatment Sludge | 13.67 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 13,678.48 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Synthetic Liner Materials | 4.08 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 1,352.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 20,464.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 486.30 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SNYDER BROS INC | Produced Fluid | 11,523.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 19.20 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 703.70 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Produced Fluid | 2,439.60 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2441909 | Primary Facility | 2016-01-20 | Routine/Complete Inspection | No Violations Noted | Site construction was still ongoing, perimeter E&S controls had been installed as outlined in the approved ESCGP. Conductor rig is to scheduled to be onsite the afternoon of 01/20/16. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2443456 | Primary Facility | 2016-01-26 | Drilling/Alteration | No Violations Noted | Well tagged-basement set-well spudded-drilled to 40' and 40' of 26" conductor pipe set and grouted. Well covered with steel plate. |
2446474 | Primary Facility | 2016-02-03 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. Top-hole drill rig was enroute to the well-site. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2453078 | Primary Facility | 2016-02-25 | Drilling/Alteration | No Violations Noted | Cleaned hole to 130'. Cemented with 228 sks unitropic. No returns. Shut down-plan is to plug and skid to next well as per Oil & Gas team guidance according to regulations. |
2466904 | Primary Facility | 2016-03-21 | Drilling/Alteration | No Violations Noted | Rig ran-cemented 40'of30"-113'of26" and 994'of13.375"pipe. Cement jobs ok. Log book ok. This is Furnace Run 31244 2HA skid well. |
2466970 | Primary Facility | 2016-03-22 | Routine/Complete Inspection | No Violations Noted | Drill rig located onsite and drilling was ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2468857 | Primary Facility | 2016-03-29 | Drilling/Alteration | No Violations Noted | Rig TD'd top hole @ 5947' on 3/26/2016 and skidded to next hole. On site log book up to date and all looked ok. |
2492304 | Primary Facility | 2016-06-13 | Drilling/Alteration | No Violations Noted | Keane had just moved in - hooked up equipment on this well and was pressure testing in prep for frac. Equipment looked ok. |
2492735 | Primary Facility | 2016-06-14 | Drilling/Alteration | No Violations Noted | Keane started frac @ 6:00 this am and had completed the first stage on this 2H well at the time of this inspection. Equipment-grounding-all containments looked good. Noise reduction manifold was in place and frac job was relatively quiet. |
2494675 | Primary Facility | 2016-06-17 | Drilling/Alteration | No Violations Noted | Keane was just starting the stage 5 frac on this well of the 166 stage zipper frac planned for the 4 wells on this pad. All on site equipment and the daily activity electronic log looked good. |
2496648 | Primary Facility | 2016-06-23 | Drilling/Alteration | No Violations Noted | Keane had just fracked stage 70 of the planned 166 stage zipper frac on the 4 wells on this site. All on site equipment-containment looked ok. |
2500115 | Primary Facility | 2016-07-06 | Drilling/Alteration | No Violations Noted | Last frac plug set in curve. Snubbing unit due in shortly. Frac stack being removed from well @ time of inspection. All equipment on site looked ok. |
2501621 | Primary Facility | 2016-07-15 | Drilling/Alteration | No Violations Noted | Snubbing unit crew drilled out plugs and was tripping out of hole getting ready to hook up to run production tubing. All equipment on site looked ok. |
2505525 | Primary Facility | 2016-07-28 | Routine/Complete Inspection | No Violations Noted | Drilling and well stimulation activities appeared to have been completed. Work was underway to equip the wells for production. Site work was underway related to the PCSM for the associated ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2528545 | Primary Facility | 2016-10-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-shut in. Annulus was open. Well head casing-production set equipment-tank battery/containment dike looked ok. |
2537955 | Primary Facility | 2016-11-18 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2546437 | Primary Facility | 2016-12-21 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been effectively stabilized with vegetation achieving 70% uniform coverage all PCSM controls had been implemented as outlined in the site restoration plans. |
2563713 | Primary Facility | 2017-02-21 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to the site or access road. AST that had been onsite for flowback containment had been deconstructed and removed. There was no staining observed indicative that any spills or leaks occurred. |
2643085 | Primary Facility | 2017-10-03 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access. Brine tanks located onsite within secondary containment. Both the tanks and secondary containment appeared to be in sound condition. |
2672740 | Primary Facility | 2017-12-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, wells 2H-A, 3H-A, 4H, 1H all drilled and appear equipped for production. |
2705288 | Primary Facility | 2018-03-14 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and dike containment look excellent. |
2771542 | Primary Facility | 2018-09-06 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks on site. |
2798015 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok. |
2820998 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]