If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31262 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.715936,"lon":-79.621589,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 153668 | |
Farm/Lease Name: RENSHAW 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-05-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.715936 | |
Longitude: -79.621589 |
Date | Event |
---|---|
2016-05-12 | New Permit Application |
2017-03-08 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-10-17 | 2017-11-06 | 6,925 | 13,795,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MBC-516 | Keane | Biocide | glutaral | 111-30-8 | 26.7 | 0.0024755 | 3160.69 |
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000492319 | 628.587 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000738942 | 943.473 | ||||
KSI-19NW | Keane | Scale Inhibitor | Methanol | 67-56-1 | 30 | 0.00521498 | 6658.43 | |
KAI-12 | Keane | Acid Inhibitor | ethylbenzene | 100-41-4 | 1 | 0.00001368 | 17.461 | |
xylene | 1330-20-7 | 5 | 0.00006838 | 87.303 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00006838 | 87.303 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00006838 | 87.303 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00006838 | 87.303 | ||||
Methanol | 67-56-1 | 90 | 0.00123079 | 1571.46 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00006838 | 87.303 | ||||
KFR-16FW | Keane | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.0167227 | 21351.4 | |
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.0012542 | 1601.35 | ||||
Water | 7732-18-5 | 60 | 0.0501682 | 64054.2 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000836136 | 1067.57 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0.0012542 | 1601.35 | ||||
Hydrochloric Acid (15%) | Keane | Acidizing | Water | 7732-18-5 | 85 | 0.563609 | 719610 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0994604 | 126990 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Fatty imidazoline | 61790-69-0 | 5 | 0.00006838 | 87.303 | |
xylene | 1330-20-7 | 5 | 0.00006838 | 87.303 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000738942 | 943.473 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00006838 | 87.303 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0.0012542 | 1601.35 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000836136 | 1067.57 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.0167227 | 21351.4 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000492319 | 628.587 | ||||
Water | 7732-18-5 | 85 | 0.563609 | 719610 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00006838 | 87.303 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001368 | 17.461 | ||||
Water | 7732-18-5 | 92.5 | 0 | 0 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00006838 | 87.303 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.0012542 | 1601.35 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 9.05843 | 11,565,700.0 | |
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.1669 | 115,124,000.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,343,014.00 | 319 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 886,973.00 | 281 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SNYDER BROS INC | 1,991.25 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 888.35 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 1,991.25 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Produced Fluid | 237.60 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 106.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | Produced Fluid | 140.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Synthetic Liner Materials | 4.08 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Drill Cuttings | 888.35 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Synthetic Liner Materials | 3.89 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 26,992.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 2,313.10 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 11.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | SNYDER BROS INC | Produced Fluid | 467.20 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 61.74 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Filter Socks | 0.73 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 13,294.20 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 1,301.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Produced Fluid | 41.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | SNYDER BROS INC | Produced Fluid | 2,507.10 Bbl | REUSE (AT WELL PAD) | |
2019 | SNYDER BROS INC | Produced Fluid | 10.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2573227 | Primary Facility | 2017-03-20 | Drilling/Alteration | No Violations Noted | Well spudded to 42' on 3/10/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok. |
2580984 | Primary Facility | 2017-04-06 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2599997 | Primary Facility | 2017-05-23 | Drilling/Alteration | No Violations Noted | The top hole Rig was drilling @ 1,700' at the time of this inspection. Ran 885' of 13 3/8" pipe-cemented with 655 sks cement-got good 20 bbl return. Daily drilling info and all equipment on site looked ok. |
2606699 | Primary Facility | 2017-06-22 | Routine/Complete Inspection | No Violations Noted | Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition. There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment. All access road and site erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2633970 | Primary Facility | 2017-09-08 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Secondary containment was located onsite. Minimal precipitation had accumulated on the containment. No sheens were observed in the puddles of water located on the containment. All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP. Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge. There was no observed accelerated erosion or sedimentation in relation to the access road. |
2647158 | Primary Facility | 2017-10-13 | Routine/Complete Inspection | No Violations Noted | Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized. All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17. Secondary containment had been implemented as outlined in the containment plan. |
2656697 | Primary Facility | 2017-11-03 | Routine/Complete Inspection | No Violations Noted | The Keane frac crew was just getting ready to start fracking stage 32 on the 2H well at the time of this inspection. All site documentation and equipment looked ok. |
2681580 | Primary Facility | 2018-01-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection. |
2750715 | Primary Facility | 2018-07-11 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok. |
For data sources see[8]