If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31270 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.869275,"lon":-79.56585,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 153958 | |
Farm/Lease Name: DYNAMITE | |
License Status: | |
Spud Date: | |
Permit Date: 2016-12-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.869275 | |
Longitude: -79.565850 |
Date | Event |
---|---|
2016-12-01 | New Permit Application |
2017-02-17 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-08-08 | 2017-09-12 | 6,434 | 14,813,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.8933 | 123,616,000.0 |
BIO CLEAR 1430 | Producers Service Corp | Biocide | Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.00061501 | 855.237 | |
Dimethylamine | 68439-70-3 | 0.5 | 0.00006150 | 85.524 | ||||
Glutaraldehyde | 111-30-8 | 20 | 0.00246004 | 3420.95 | ||||
Sand (Proppant) | Producers Service Corp | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.3486 | 14,390,900.0 | |
NEFE-180 | Producers Service Corp | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.000120008 | 166.883 | |
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006000 | 83.442 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00006000 | 83.442 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006000 | 83.442 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006000 | 83.442 | ||||
Acetic Acid | 64-19-7 | 65 | 0.000780049 | 1084.74 | ||||
Methanol | 67-56-1 | 35 | 0.000420026 | 584.092 | ||||
15% HCL | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0982035 | 136563 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Methanol | 67-56-1 | 35 | 0.000420026 | 584.092 | |
Dimethylamine | 68439-70-3 | 0.5 | 0.00006150 | 85.524 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006000 | 83.442 | ||||
Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00241003 | 3351.4 | ||||
Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.00061501 | 855.237 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00241003 | 3351.4 | ||||
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000364205 | 506.466 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006000 | 83.442 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006000 | 83.442 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000364205 | 506.466 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000120008 | 166.883 | ||||
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00241003 | 3351.4 | ||||
DETA phosphonate | 15827-60-8 | 3 | 0.000364205 | 506.466 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00006000 | 83.442 | ||||
STIMLUBE F | Producers Service Corp | Friction Reducer | Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00241003 | 3351.4 | |
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00241003 | 3351.4 | ||||
Petroleum Distallates | 64742-47-8 | 30 | 0.0233228 | 32432.9 | ||||
Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00241003 | 3351.4 | ||||
SI-1171 | Producers Service Corp | Scale Inhibitor | Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 10 | 0.00121402 | 1688.22 | |
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000364205 | 506.466 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000364205 | 506.466 | ||||
DETA phosphonate | 15827-60-8 | 3 | 0.000364205 | 506.466 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SNYDER BROS INC | 191,967.00 | 25 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,328,498.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,043,157.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SNYDER BROS INC | 5,057.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 1,372.61 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 2,025.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 5,128.28 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | 2,025.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | |
2017 | SNYDER BROS INC | Produced Fluid | 8,047.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 1,231.76 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | 434.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 | |
2017 | SNYDER BROS INC | Produced Fluid | 306.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 434.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 3,662.55 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Synthetic Liner Materials | 2.47 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 45.23 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Drill Cuttings | 1,372.61 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Synthetic Liner Materials | 3.95 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 30,097.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 1,152.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 91.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | SNYDER BROS INC | Produced Fluid | 62.20 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | SNYDER BROS INC | Produced Fluid | 283.10 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 11.03 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Filter Socks | 1.37 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 10,627.40 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 18.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | SNYDER BROS INC | Produced Fluid | 2,493.70 Bbl | REUSE (AT WELL PAD) | |
2019 | SNYDER BROS INC | Produced Fluid | 523.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2546443 | Primary Facility | 2016-12-21 | Preoperation Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All cut and fill slopes had been temporarily stabilized and all erosion controls, i.e. silt socks & sediment traps, had been properly constructed and implemented. There were a few minor construction details being addressed. No accelerated erosion or sedimentation was observed in relation to the site or access road. |
2563424 | Primary Facility | 2017-02-21 | Drilling/Alteration | No Violations Noted | Well permit, site sign, drilling log book all present and up to date. 6'x6' cellar in place. Drilled and set 84' of new 24" conductor pipe. Site and equipment looked good. |
2563718 | Primary Facility | 2017-02-21 | Routine/Complete Inspection | No Violations Noted | Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. |
2586292 | Primary Facility | 2017-04-24 | Drilling/Alteration | No Violations Noted | Operator continued drilling operations on 4-23-17. The Rig shanked the bit at 860' and was waiting on cement to arrive to cement back the hole and angle deviate drill around after cement sets up. Daily drilling log and all equipment on site looked ok. |
2589500 | Primary Facility | 2017-05-02 | Drilling/Alteration | No Violations Noted | Rig lost the bit @ 960'. Cemented back to 478' with 610 sks cement. Went in with 8" motor & tool to attempt to angle deviate and drill down with hole opener tool. Daily drilling information and all equipment on site looked ok. |
2590360 | Primary Facility | 2017-05-04 | Drilling/Alteration | No Violations Noted | Plug and skid was cancelled. Rig was able to drill to 860'-ran 804' of 13 3/8" casing-cemented with 800 sks cement- got a 55 bbl return-shut down for 8 hours-running back in hole to drill out cement shoe at the time of this inspection. Daily drilling information up to date-all equipment looked ok. |
2591855 | Primary Facility | 2017-05-09 | Drilling/Alteration | No Violations Noted | The Rig had finished drilling the top hole portion of this well and had moved off at the time of this inspection. The well was covered over with a steel plate until the next Rig arrives. Everything left on site looked ok. |
2595488 | Primary Facility | 2017-05-15 | Drilling/Alteration | No Violations Noted | Top hole portion TD'd at 1,975'. Ran 1,912' of 9 5/8" casing and cemented to surface with good return. Rig gone-well covered over until finishing Rig arrives. All equipment on site looked ok. |
2599996 | Primary Facility | 2017-05-23 | Drilling/Alteration | No Violations Noted | Precision tripple Rig # 532 had just set up and rigged up over the bore hole. On site staff was holding their pre-drill safety/procedure meeting at the time of this inspection. All equipment on site looked ok. |
2602321 | Primary Facility | 2017-06-06 | Drilling/Alteration | No Violations Noted | The Rig was running the 5 1/2" production casing and getting ready to cement it to surface at the time of this inspection. Daily drilling info-all equipment on site looked ok. |
2604737 | Primary Facility | 2017-06-16 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2619504 | Primary Facility | 2017-07-27 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2626418 | Primary Facility | 2017-08-14 | Drilling/Alteration | No Violations Noted | Frac crew just finished stage 8 - set 2 retrievable plugs and performed a negative/positive test after installing each plug. A hanger with BPV was also installed in well to provide a third barrier while RD existing valves and waiting on replacements at the time of this inspection. |
2626501 | Primary Facility | 2017-08-15 | Drilling/Alteration | No Violations Noted | Frac crew was removing the frac stack valves to wait on new valves to arrive from another company at the time of this inspection. Well head looked ok. |
2628199 | Primary Facility | 2017-08-21 | Drilling/Alteration | No Violations Noted | Frac crew just finished installing new Weatherford frac stack valves-pressure tested and getting ready to resume frac. All equipment on site looked ok. |
2630645 | Primary Facility | 2017-08-28 | Drilling/Alteration | No Violations Noted | Frac crew had just finished fracking stage 18 out of the planned 48 stages for this well at the time of this inspection. |
2641948 | Primary Facility | 2017-09-29 | Routine/Complete Inspection | No Violations Noted | Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2648461 | Primary Facility | 2017-10-17 | Routine/Complete Inspection | No Violations Noted | All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs. |
2665258 | Primary Facility | 2017-11-29 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells. |
2680915 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production. |
2709841 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2724358 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production. |
2743230 | Primary Facility | 2018-06-13 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 4H is drilled and appears equipped for production. Wells 1H, 2H, and 3H are also drilled and appear equipped for production. |
2766749 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2818438 | Primary Facility | 2018-12-17 | Site Restoration | No Violations Noted | Inspection conducted in response to Post Drilling Restoration Report received by Department.
Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved. |
2821033 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]